[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN104221063A - Paper sheet processing device - Google Patents

Paper sheet processing device Download PDF

Info

Publication number
CN104221063A
CN104221063A CN201280072321.1A CN201280072321A CN104221063A CN 104221063 A CN104221063 A CN 104221063A CN 201280072321 A CN201280072321 A CN 201280072321A CN 104221063 A CN104221063 A CN 104221063A
Authority
CN
China
Prior art keywords
box
mentioned
bank note
classification
paper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201280072321.1A
Other languages
Chinese (zh)
Other versions
CN104221063B (en
Inventor
原弘树
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Omron Financial System Co Ltd
Original Assignee
Hitachi Omron Financial System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Omron Financial System Co Ltd filed Critical Hitachi Omron Financial System Co Ltd
Publication of CN104221063A publication Critical patent/CN104221063A/en
Application granted granted Critical
Publication of CN104221063B publication Critical patent/CN104221063B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07DHANDLING OF COINS OR VALUABLE PAPERS, e.g. TESTING, SORTING BY DENOMINATIONS, COUNTING, DISPENSING, CHANGING OR DEPOSITING
    • G07D11/00Devices accepting coins; Devices accepting, dispensing, sorting or counting valuable papers
    • G07D11/10Mechanical details
    • G07D11/12Containers for valuable papers
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07DHANDLING OF COINS OR VALUABLE PAPERS, e.g. TESTING, SORTING BY DENOMINATIONS, COUNTING, DISPENSING, CHANGING OR DEPOSITING
    • G07D11/00Devices accepting coins; Devices accepting, dispensing, sorting or counting valuable papers
    • G07D11/20Controlling or monitoring the operation of devices; Data handling
    • G07D11/22Means for sensing or detection
    • G07D11/225Means for sensing or detection for detecting or indicating tampering
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07DHANDLING OF COINS OR VALUABLE PAPERS, e.g. TESTING, SORTING BY DENOMINATIONS, COUNTING, DISPENSING, CHANGING OR DEPOSITING
    • G07D11/00Devices accepting coins; Devices accepting, dispensing, sorting or counting valuable papers
    • G07D11/40Device architecture, e.g. modular construction

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
  • Pile Receivers (AREA)

Abstract

The objective of the present invention is, in a paper sheet processing device, to reduce the time needed for a scrutiny process. An ATM (10) houses banknotes (S) in denominational cassettes (140) by denomination, and while displaying the current banknote (S) housing state of each denominational cassette (140), the form of the display of paper sheet housing state is caused to differ between denominational cassettes (140) at which an anomalous event inducing an obstacle to the identification of the number of housed banknotes (S) has not arisen, and denominational cassettes (140) at which such an anomalous event has arisen.

Description

Bill handling device
Technical field
The present invention relates to a kind of bill handling device processing the such paper of bank note, securities.
Background technology
This bill handling device is with automatic trading apparatus (Automated Teller Machine ATM (automatic teller machine); ATM), the form of the such bank note treatment device of money changing machine, bank clerk etc. the paper currency deposit-withdrawal mechanism, the automatic machine that use and popularizing widely, there is denominations box according to denomination difference storage bank note usually, carry out cashier's process of bank note.In general, in the utilization of traction processing apparatus, fill out bank note to denominations is box-packed, carry out detailed survey process at any time or termly, namely the bank note in device is counted, determine the remaining sum of bank note.
Bank note treatment device detailed survey process reality take out from box the bank note received in denominations box carry out circulation carry, during this conveying, carry out the reading of the counting of bank note number and the sequence number of bank note, then again by bank note containing in box.In such detailed survey process, the actual taking-up of bank note is carried out to each denominations box and receives again, so detailed survey process needs the long time.Further, propose in the implementation of this detailed survey process, by temporarily stopping the various methods (such as with reference to patent documentation 1) made for seeking to shorten detailed survey process of bank note treatment device.
Prior art document
Patent documentation
Patent documentation 1: Japanese Unexamined Patent Publication 2010-282535 publication
Summary of the invention
The problem that invention will solve
In above-mentioned existing detailed survey process, take out number by the bank note reducing each denominations box and seek to shorten the detailed survey time, but the situation that all denominations carry out detailed survey process is not changed, leave room for improvement.
In addition, this problem is not limited to the bank note treatment device carrying out bank note containing process, is carrying out problem common in the bill handling device of the process of paper.
The present invention proposes at least partially in order to solve in above-mentioned existing problem, its object is in bill handling device, shortens the time that detailed survey process needs.
For solving the means of problem
In order to achieve the above object at least partially, the present invention can implement as following mode.
(1) as a mode of the present invention, a kind of bill handling device, it processes the paper of multiple classification, possesses: multiple classification box, it carries out preparation to receive paper according to each classification of above-mentioned paper, and accepts the extraction of the paper of this storage; Relevant transport path is carried in the extraction of the paper carried to the storage of each above-mentioned classification box with paper and extract out from each above-mentioned classification box; Classification information obtaining section, it counts the number of the paper carried in above-mentioned transport path, while obtain the classification information determining paper classification according to the paper of this conveying; Special event detection portion, it detects the situation occurred determination of the paper storage number of above-mentioned classification box being brought to the special event of interference for each above-mentioned classification box; Box management department, the counting number of its paper obtained according to above-mentioned classification information obtaining section, the present situation storage number of the paper before the above-mentioned special event of each above-mentioned classification box management is occurred; And display part, it shows the storage situation of the paper of above-mentioned classification box to each classification box.This display part distinguishes use first display mode and the second display mode, above-mentioned storage situation is shown to each classification box, first display mode is about owing to not there is above-mentioned special event, the display mode of the fixed box of above-mentioned present situation storage number of each above-mentioned box, second display mode is about owing to there occurs above-mentioned special event, the display mode of the undetermined box of above-mentioned present situation storage number of each above-mentioned box.
In the bill handling device of this form, for the storage situation of the present situation of each classification box display paper, do not having to occur to bring in the classification box of the special event of interference (hereinafter referred to as the non-generating box of special event) and the classification box (hereinafter referred to as special event generating box) that there occurs this special event the determination of the storage number of above-mentioned paper to make the display mode of the storage situation of paper different simultaneously.Therefore, this display mode is that the classification box (the non-generating box of special event) of the first display mode is identified as present situation storage number determines owing to not there is special event, and the classification box (special event generating box) that there occurs special event is identified as present situation storage number and does not determine owing to there occurs special event.Such identification is made to become easy by the difference of display mode, therefore for the non-generating box of special event, because present situation storage number is determined, so get rid of from the selection candidate of detailed survey process, do not perform detailed survey process, special event generating box can be chosen as the execution object of detailed survey process thus.As a result, the quantity self of the classification box carrying out detailed survey process can be reduced, therefore, it is possible to more shorten the time required for detailed survey process.
Determination as the paper storage number to classification box brings the special event of interference, except the box switch access of each classification box, can also suppose that to extract out when bad or to this box the paper often opened storage paper that is bad, that accompany with the receipts and expenditures of paper is carried so-called the various event such as to take out of from the paper often opened of classification box.
(2) in the bill handling device of above-mentioned form, above-mentioned present situation storage number can be included in above-mentioned storage situation and show, like this can also confirm to receive number.
(3) in the bill handling device of above-mentioned arbitrary form, possess: non-classification box, it prepares respectively with above-mentioned classification box, can receive the paper causing above-mentioned special event via above-mentioned transport path, division, the paper causing above-mentioned special event is sorted in above-mentioned non-classification box via above-mentioned transport path and receives by it, above-mentioned box management department is when being accommodated in the paper causing above-mentioned special event in above-mentioned non-classification box by above-mentioned division, undertaken counting or estimate the storage number obtained to above-mentioned non-classification box by the storage number of the above-mentioned non-classification box of above-mentioned classification information obtaining section subtend, number is received as above-mentioned present situation using receiving the storage number obtained after number deducts this storage number from above-mentioned present situation, each above-mentioned classification box is managed, above-mentioned display part is by situation about being counted by the storage number of the above-mentioned non-classification box of above-mentioned classification information obtaining section subtend and above-mentioned second display mode of situation difference about the undetermined box of above-mentioned present situation storage number having estimated above-mentioned storage number, above-mentioned storage situation is shown to each classification box.
In the bill handling device of this form, when there occurs special event, by above-mentioned division, the paper causing special event is received in above-mentioned non-classification box.The paper of such storage is stayed in non-classification box, can not take to outside the device of bill handling device, the storage number in the special event generating box before the storage number in the special event generating box therefore after special event generation occurs with special event with the summation of the number received in non-classification box is consistent.And, if be received into by the paper causing special event in non-classification box, then distinguish the above-mentioned second display state about the present situation storage undetermined box of number (special event generating box) by the counting of number received in non-classification box and presumption.At this moment, if counted the number be accommodated in non-classification box, then determine this storage number and deduct the present situation storage number of the special event generating box that this storage number is obtained.Thereby, it is possible to get rid of this special event generating box from the selection candidate of detailed survey process, make the quantity of the classification box carrying out scrutinizing process become less, thus can seek more to shorten the time required for detailed survey process.In addition, even if estimate the storage number to non-classification box, as mentioned above, the storage number of this presumption occur with special event after special event generating box in the summation of storage number occur with above-mentioned special event before special event generating box in storage number consistent.Thereby, it is possible to get rid of special event generating box from the selection candidate of detailed survey process, make the quantity of the classification box carrying out scrutinizing process become less, thus can seek more to shorten the time required for detailed survey process.
(4) in the bill handling device of above-mentioned arbitrary form, possess: detailed survey handling part, it performs detailed survey process, namely paper is extracted out from above-mentioned classification box, while carry the paper of this extraction while carry out number counting and the obtaining of above-mentioned classification information by above-mentioned classification information obtaining section at above-mentioned transport path, the number of the paper of the classification about each above-mentioned classification information determined by each above-mentioned classification box for the extraction object becoming paper; Detailed survey process instruction unit, above-mentioned present situation storage number is shown as undetermined above-mentioned classification box to above-mentioned second display mode by it, indicates above-mentioned detailed survey handling part to perform above-mentioned detailed survey process.
In the bill handling device of this form, about by second display mode display present situation storage number be undetermined classification box (special event generating box), perform instruction by the detailed survey process that sends from detailed survey process instruction unit, detailed survey process can be performed.Further, because the box quantity of the execution object of detailed survey process is few, therefore, it is possible to complete detailed survey process at short notice.
(5) in the bill handling device of aforesaid way, when the paper causing above-mentioned special event being received in above-mentioned non-classification box by above-mentioned division, above-mentioned detailed survey process instruction unit, for the above-mentioned classification box generation of above-mentioned special event being detected by above-mentioned special event detection portion, suppresses the instruction of the above-mentioned detailed survey process of execution to above-mentioned detailed survey handling part.
In the bill handling device of this form, make the quantity of the classification box carrying out scrutinizing process become less, thus more can shorten the time required for detailed survey process.
The detailed survey process of the bill handling device of aforesaid way is except the method for being extracted out by all papers be accommodated in classification box, following method can also be adopted, as taked in above-mentioned prior art, for the paper to known storage number, do not extract out when detailed survey process.
Accompanying drawing explanation
Fig. 1 is the key diagram of the structure of the automatic trading apparatus (hereinafter also referred to " ATM ") 10 of the traction processing apparatus summarily represented as one embodiment of the present of invention.
Fig. 2 is the rear side outside drawing at the back side summarily representing ATM10 under the state opening door.
Fig. 3 is the key diagram of the structure functionally representing ATM10.
Fig. 4 is the key diagram of the structure of the bank note treatment device 100 summarily representing embodiment.
Fig. 5 is the situation of many pieces of storage of the bank note schematically represented in denomination classification box 140 and the detection of extraction and the detection to the access bank note in box.
Fig. 6 is the key diagram of the display situation in the operated by personnel portion 250 represented in bank note filling, detailed survey process.
Fig. 7 is the key diagram of the situation of the initial picture in operated by personnel portion 250 when representing that staff starts operation.
Fig. 8 is the process flow diagram of the flow process representing bank note filling process.
Fig. 9 represents that bank note treatment device control part 190 carries out the key diagram of the situation of the data managed.
Figure 10 represents from the storage number of all boxes shown in Fig. 6 is the original state of 0, the key diagram of the situation of the display in the operated by personnel portion 250 when not having mistake etc. to carry out bank note filling.
Figure 11 is the process flow diagram of the flow process representing bank note pump-and-treat system.
Figure 12 is the situation of the box-like condition display 260 represented in the operated by personnel portion 250 when not having the pump-and-treat system of the beginning bank note such as above-mentioned mistake all the time and does not have the box-like condition at the end of the pump-and-treat system of the bank note such as mistake to show the key diagram of the situation of 260 all the time.
Figure 13 represents that the process of extracting out at bank note creates above-mentioned mistake etc., the key diagram of the situation of the box-like condition display 260 at the end of the pump-and-treat system of bank note.
Figure 14 is the process flow diagram of the flow process representing bank note containing process.
Figure 15 is the situation of the box-like condition display 260 represented when not having the storage process of the beginning bank note such as above-mentioned mistake all the time and does not have the box-like condition at the end of the storage process of the bank note such as mistake to show the key diagram of the situation of 260 all the time.
Figure 16 creates above-mentioned mistake etc. in the process of bank note containing, the key diagram of the situation of the box-like condition display 260 at the end of bank note containing process.
Figure 17 is the process flow diagram of the flow process of the check processing represented with or without box access.
Figure 18 is the key diagram of the situation of the box-like condition display 260 represented when to detect in the second denominations box 140B that box accesses.
Figure 19 is the process flow diagram of the first half section flow process representing detailed survey process.
Figure 20 is the process flow diagram of the second half section flow process representing detailed survey process.
Embodiment
Below about embodiments of the present invention, according to following order, embodiment and accompanying drawing are together described.
A-1. apparatus structure:
A-2: bank note filling process:
A-3: bank note pump-and-treat system:
A-4: bank note containing process:
A-5: detailed survey process:
A-6: detailed survey method determination processing:
A-1. apparatus structure:
The key diagram that the rear side outside drawing that Fig. 1 is the key diagram of the structure of the automatic trading apparatus (hereinafter also referred to " ATM ") 10 of the traction processing apparatus summarily represented as one embodiment of the present of invention, Fig. 2 is the back side summarily representing ATM10 under the state opening door, Fig. 3 are the structures functionally representing ATM10.ATM10 is that one is such as arranged on financial institution, snacks shop, communal facility etc., according to the operation of client, automatically provides the cash handler provided by financial institution etc. to wait the device of service.ATM10 also can be called as cash dispenser.
As shown in FIG. 1 to 3, the information that ATM10 possesses the card/detail form treating apparatus 210 of the process transactional cards of client or transaction details list, the bankbook processing device 220 of process bankbook, the Coin processor 230 of process coin, the bank note treatment device 100 of process bank note, display exchange need, and the main control section 300 accepting the client operating portion 240 as user interface of the operation of client, the operated by personnel portion 250 of the operation for staff, each portion of control ATM10.Operated by personnel portion 250 bank note described later supplement and detailed survey process time, be configured to show information required for work to staff, and accept the user interface of the operation of staff.ATM10 freely possesses back gate 12 at its rear side switch, in this and device cabinet, possess above-mentioned bank note treatment device 100, detail form treating apparatus 210, bankbook processing device 220, Coin processor 230, operated by personnel portion 250, there is bank note treatment device control part 190 described later in addition.
The bank note treatment device control part 190 that bank note treatment device 100 possesses has the storer of CPU and storage program, data etc., under the control of main control section 300, carry out the filling of bank note, stored in (storage), take out the process such as (extraction), detailed survey.In addition, bank note treatment device control part 190 possesses under the control of main control section 300, obtain for the information realized in the present invention, box management, the selection of detailed survey object box, detailed survey process, the detailed survey/pipage control portion 192 of function that carries with these bank note accompanied; And for the test section 194 of the function that realizes special event detection.
Fig. 4 is the key diagram of the structure of the bank note treatment device 100 summarily representing the present embodiment.Bank note treatment device 100 possesses: storage mouth 110, its entrance as bank note S and outlet; Conveying mechanism 170, it has transport path (L1 ~ L10), and transport path is carried bank note S; Identification part 120, it has not shown image pickup part, carries out the identification of the true and false/denomination of the bank note S carried on transport path, process that the reading of sequence number obtains, counts; Temporary transient reserve part 130, it temporarily preserves bank note S; 3 denominations boxes 140, it is according to denomination difference storage bank note S; Reject box 150, it reclaims the bank note S (rejection bank note) of identification part 120 None-identified; Supplement recycling box 60, the bank note S that its storage supplements denomination the classification box 140 and bank note S reclaimed from denominations box 140; Blocking box 180, it is accommodated in the bank note (blocking bank note) from there occurs blocking when box extraction or conveying.Above-mentioned rejection bank note refers to by the forge or true or paper money identification in identification part 120 inappropriate bank note, when extracting out from box overlap bank note, due to bending the bank note etc. of the not clear true and false.In addition, in the diagram, the diagram of bank note treatment device control part 190 (with reference to Fig. 3) is omitted.
Denominations box 140 is connected with transport path under the state can receiving bank note S, accepts and receive bank note S from transport path, and extracts bank note S out and pass out on transport path.In the present embodiment, using three denominations boxes 140 as one group, be made up of the first denomination box 140A ~ the 3rd denomination box 140C, first denomination box 140A is the special boxes of 10,000 Japanese yen paper currencies, second denomination box 140B is the special boxes of 5,000 Japanese yen paper currencies, and the 3rd denomination box 140C is the special boxes of 1,000 Japanese yen paper currencies.Below, when the first denomination box 140A ~ the 3rd denomination box 140C is carried out general name, be called denominations box 140, about the box of each denomination, be called separately the first denomination box 140A, the second denomination box 140B, the 3rd denomination box 140C.
Denominations box 140 from the link position with transport path, from the back side (box bottom side) forwards side (box top board side) arrange storage bank note S in order, extract bank note S out one by one in order from side direction inboard, front.Therefore, the extraction of bank note S from denominations box 140 is performed according to bank note S to the order (the posterior bank note S of storage order to denominations box 140 is first drawn out of) that the storage order of denominations box 140 is contrary.
Fig. 5 is the situation of many pieces of storage of the bank note schematically represented in denomination classification box 140 and the detection of extraction and the detection to the access bank note in box.As shown in the figure, denominations box 140 possesses first sensor 142 and the second sensor 144, and first sensor 142 detects the bank note containing to denominations box 140 and whether the extraction of the bank note from denominations box 140 is carried out one by one.Second sensor 144 detects with or without the access to the bank note received after the not shown lid opening box.The detection signal of two sensors is sent to bank note treatment device control part 190, and whether according to the detection signal of first sensor 142, bank note treatment device control part 190 judges that the bank note containing to denominations box 140 and the bank note from denominations box 140 are extracted out carries out one by one.And, if create multiple storage or extraction (so-called take out of), then bank note treatment device control part 190 is set to and brings interference to the determination of the storage number of the bank note S in denomination classification box 140, carries out the denominations box 140 creating multiple storages or extraction to be chosen as the process such as the object box of detailed survey process described later.In addition, bank note treatment device control part 190, according to the detection signal of the second sensor 144, determines whether the access of the bank note received in denominations box 140.And, if there is box to access, then bank note treatment device control part 190 is set to and brings interference to the determination of the storage number of the bank note S in denomination classification box 140, carries out the denominations box 140 with box access to be chosen as the process such as the object box of detailed survey process described later.In addition, bank note treatment device control part 190 (with reference to Fig. 3), for each denominations box 140, stores as described later and manages the predetermined information relevant to the bank note of storage.
Reject box 150 can only stored in the state of bank note S under is connected with transport path, from transport path receive and receive rejection bank note.Supplement recycling box 160 by separation vessel 162 be split into supplementary recoverer 163 that the bank note S supplemented or the bank note S of recovery is received and to when bank note filling process (aftermentioned) from being identified as by identification part 120 the supplementary rejection portion 164 that abnormal bank note S (supplement and reject bank note) receives the bank note S that supplementary recoverer 163 is extracted out.Supplement recoverer 163 to be connected with transport path under the state can receiving bank note S, extract bank note S one by one out and pass out on transport path, and receive from transport path and receive bank note S.Supplement rejection portion 164 can only stored in the state of bank note S under is connected with transport path, receive from transport path and receive supplementary rejection bank note.Conveying mechanism 170 such as uses the formation such as gate of roller or driving-belt, switching transport path, is formed to the bank note containing of each box above-mentioned and extracts relevant transport path L1 ~ L10 out from the bank note of each box.Represent the throughput direction of the bank note S in each transport path of conveying mechanism 170 with arrow in Fig. 4.Blocking box 180 is connected with transport path under the state only stored in bank note S, receives and receive blocking bank note from transport path.
Client operating portion 240 (with reference to Fig. 2) has touch pad, shows the content of operation of needs on a touchpad to instruct the operation of client.Such as, the picture of input of the input of the transaction categories such as client operating portion 240 shows for guiding deposit, withdraws the money, account transfer, password, the amount of money etc., passes to main control section 300 by the instruction inputted by client.
Operated by personnel portion 250 (with reference to Fig. 2) uses for operators such as the staff by bank and safeguards the operating portion of ATM10, showing the result, fault place etc. of the input part of the instruction for carrying out the filling of bank note or detailed survey etc., unit state, application mode, filling or detailed survey, playing the function of display part of the present invention.Fig. 6 is the key diagram of the situation of the display in the operated by personnel portion 250 represented in bank note filling and detailed survey process.Operated by personnel portion 250 is touch pad structure, when bank note filling and detailed survey process, under the control of main control section 300, as shown in the figure, comprise box-like condition display 260, all counter switch display 262 in this display frame, counter switch display 264, print switch display 266 show.When all boxes for denominations box 140 carry out detailed survey process described later, show 262 by the whole counter switch of staff's pressing operation.When carrying out detailed survey process described later for the denominations box 140 being selected as detailed survey handling object by bank note treatment device control part 190 as described later, by staff, 264 being shown to counter switch and carrying out pressing operation.When passing through the display shown in outside printer or detail form treating apparatus 210 printed drawings 6, by staff, 266 being shown to print switch and carrying out pressing operation.
Box-like condition display 260 copies the configuration of each box of Fig. 4 to arrange, and comprises the first box display the 281 ~ six box display 286, first box display 281 corresponding with the first denomination box 140A.Similarly, 282 corresponding with the second denomination box 140B, the 3rd box of the second box display show 283 corresponding with the 3rd denomination box 140C, the 4th box show 284 with reject that box 150 is corresponding, the 5th box shows 285 corresponding with supplementary recycling box 160, the 6th box and shows 286 with to block box 180 corresponding.In the display of these each boxes, comprise the letter symbol of the distinguishing mark of box at an upper portion thereof and surround these surrounding pattern, in bottom, figure notation being carried out to the storage number of the bank note S in box.Carry out described later fill up process wait process time obtain storage number by bank note treatment device control part 190, carry out renewal storage, therefore show this storage numerical value.The display mode of the pattern surrounding pattern as shown in Figure 6 around box difference word is such, but do not determine any one in the mode of the situation that can estimate (hereinafter referred to as presumption mode), the mode (hereinafter referred to as not determining mode) that cannot determine due to reason box storage number described later for box storage number fixed mode (following, be called and determine mode), due to reason box storage number described later, the box management data described later that this display mode is stored by bank note treatment device control part 190 decides.
In addition, first box display the 281 ~ three box display 283 is carried out processes and displays as the box group of the first denomination box 140A ~ the 3rd denomination box 140C becoming bank note filling object by box-like condition display 260, at this box group display 270G, the letter symbol of the distinguishing mark of display box group and the surrounding pattern that surrounded at an upper portion thereof.In addition, even if as having added the box group rejecting box 150 in the first denomination box 140A ~ the 3rd denomination box 140C, carry out box group display 280G, in this display, the letter symbol of the distinguishing mark of display box group and the surrounding pattern that surrounded at an upper portion thereof.And, also be shown as the device having added supplementary recycling box 160 and blocking box 180 overall, in this display (device display 290G), show the letter symbol comprising the distinguishing mark of the device of all boxes and the surrounding pattern surrounded at an upper portion thereof.Even the surrounding pattern of these group displays, device display, also distinguish use as described above and determine mode, presumption mode and do not determine mode.
Main control section 300 (with reference to Fig. 2) has the storer of CPU and storage program and data etc., is read and performs stored program, realize the control of various process, transaction by CPU.In addition, main control section 300 is connected with principal computer 400 via not shown interface, carries out the exchange of the information needed between principal computer 400.Such as, the data of the above-mentioned box-like condition display 260 in operated by personnel portion 250 are sent to principal computer 400 by main control section 300.Thus, the management of principal computer 400 is disposed, and such as bank can grasp the bank note containing situation of each box in ATM10.
A-2. bank note filling process:
Then, bank note filling process is described.Fig. 7 is the key diagram of the situation of the initial picture in operated by personnel portion 250 when representing that staff starts operation.Operated by personnel portion 250 is by opening the back gate 12 of Fig. 2, accept the control of main control section 300, display Fig. 7 initial picture 252, include in this picture bank note filling switch 254, detailed survey processing execution switch 256, other maintenance switch 258 and use start switch 259.If operation bank note filling switch 254, main control section 300 cooperates with bank note treatment device control part 190 and performs bank note described later and load and process.The operation detailed survey processing execution switch 256 when the timing predetermined performs detailed survey process, main control section 300 accepts this operation and carries out detailed survey process described later.The such as Operation and Maintenance switch 258 when manufacturer carries out maintenance etc.Use beginning switch 259 to wait at the end of process filled up by bank note described later to be operated by staff, after main control section 300 accepts this operation, start or restart the utilization (bank note extraction, storage) of ATM10 as described later.
Fig. 8 is the process flow diagram of the flow process representing bank note filling process.Bank note filling process is that the supplementary bank note of storage in supplementary recycling box 160 is flowed to denominations box 140 via transport path, carries out the process of loading (storage) in denominations box 140.Under the control of main control section 300 (Fig. 3), perform bank note by bank note treatment device control part 190 (and each portion of the bank note treatment device 100 controlled by bank note treatment device control part 190) and load process.Accept the pressing operation of the bank note filling switch 254 (with reference to Fig. 7) via operated by personnel portion 250, start to carry out bank note filling process.
When starting bank note filling process, first determine whether the storage number (step S110) determining the first denomination box 140A ~ the 3rd denomination box 140C denominations box 140 separately.Predetermined timing before the timing filled up at the bank note of the deficiency to the running along with ATM10 or the running at ATM10, such as, fill up timing in the timing changing all denominations boxes 140 or the bank note that determines termly and perform bank note filling process.In these each timings, also suppose the situation of the storage number not determining denominations box 140 all the time, what therefore process in bank note filling initially carries out above-mentioned judgement.Now, if as the replacing timing of all denominations boxes 140, be the utilization carrying out bank note filling process under the situation determining the storage number in each box, then can omit the judgement of step S110.That is, if the timing that box is changed, then as shown in Figure 6, all box storage numbers headed by denominations box 140 are defined as zero, so can omit the judgement of step S110.
When step S110 is judged to be that the storage number of denominations box 140 is not determined, enters detailed survey process (step S120) described later, carry out standby until this process terminates.By like this, the state of affairs do not determined to carry out when receiving number bank note and fill up can be avoided.
According to bank note treatment device control part 190, the management data that each box manages is carried out to the judgement of this step S110.Fig. 9 is the key diagram of the situation representing the data that bank note treatment device control part 190 manages.As shown in the figure, bank note treatment device control part 190 stores storage number (number) for each box, it determines, with or without the access to box, to extract out with or without bank note or conveying etc. mistake, wrong time the counting of bank note number relevant with this mistake or each data of the situation of presumption.In the drawings, number data are equivalent to the storage number of each box, obtain at every turn and carry out storage administration in the process of bank note pump-and-treat system described later, taking-up process, detailed survey process.Determine that data are according to or without the access to box, with or without rejection and the fault such as blocking, represent storage number whether established data, access data represents with or without the access to box, and misdata represents the fault with or without rejection, blocking etc.In Fig. 9, in the box of the word marking of RB2, i.e. the second denomination box 140B (with reference to Fig. 4), access data becomes access, so bring interference to the determination of the storage number of the bank note S in the second classification box 140B, therefore makes to determine that data are can not (NG).Even these data, obtain in the process of bank note pump-and-treat system described later, taking-up process, detailed survey process, check processing at every turn and carry out storage administration.
In addition, mean with the field that oblique line represents in Fig. 9 this box do not needed to carry out considering or do not need to carry out data management.Such as, the blocking box 180 of storage blocking bank note is box fixing in ATM10, does not need the access considering opening and closing lid.In addition, blocking box 180 is originally be accommodated in the blocking bank note bringing interference in conveying etc., so the operation needing to be removed etc., does not therefore need to consider to access.
Make the status data of counting or presumption be when exist bank note extract out or conveying etc. wrong time, carried out counting (K) to the number of the bank note relevant to this mistake still to have carried out estimating (S), horizontal line represents and does not obtain such data at current time owing to not having mistake.Even if such data, obtain in the process of bank note pump-and-treat system described later, taking-up process, detailed survey process, check processing at every turn and carry out storage administration.
On the other hand, at the step S110 of Fig. 8, if be judged to be that storage number is determined according to above-mentioned management data, then extract a piece of paper coin S out from the supplementary recoverer 163 of supplementary recycling box 160, undertaken carrying (step S130) by the transport path of conveying mechanism 170.The bank note S extracted out is transported to identification part 120 via transport path L10, L6, L2 (with reference to Fig. 4).In the extraction and conveying of this bank note S, while detect whether extract bank note S out one by one by first sensor 142 (with reference to Fig. 5), namely block according to the mistake during the driving condition of conveying mechanism 170 detects with or without the conveying of bank note S or reject.And, whether extraction/the conveying detecting bank note S according to this testing result is one by one (step S132), if it is determined that wrong, then corresponding bank note S be transported in the supplementary rejection portion 164 of blocking box 180 or rejection box 150 or supplementary recycling box 160 and carry out keeping (step S134).Such conveying, management is carried out by the classification of the conveying mechanism 170 being subject to the control of bank note treatment device control part 190.
In step S134, to blocking box 180 or reject box 150 or supplementary rejection portion 164 carry out the conveying keeping of bank note S time, carry out counting or the presumption of the number of this bank note S.Such as, if the blocking of often opening, although then occur that the fault postponed a little carried by bank note, but the counting blocking bank note can be carried out, therefore, in this case, count at the number of the bank note S (blocking bank note) taken care of by subtend blocking box 180 conveying during identification part 120.Now, in fig .9, in the field of the blocking corresponding with blocking box 180, the data of accumulation counting (K) in counting/estimation data.About rejection bank note, if detect taking out of of multiple by first sensor 142, then carry keeping in supplementary recycling box 160 the bank note S becoming this detected object.And, now, cannot be counted by identification part 120, therefore according to estimating its number sensor detection time by time, first sensor 142 of identification part 120 etc., in the field of the AB4 corresponding with supplementary recycling box 160, the data of accumulation presumption (S) in counting/estimation data, to determine in data that accumulation can not the data of (NG).So, bank note treatment device control part 190 upgrades the box management data shown in storage figure 9 during bank note benefit fills out process.Then step S134, the step S130 before returning, every after carrying out extracts out one by one, carry and it detects.
When being judged in step S132 to have carried out often to extract out one by one, carrying, at least obtain its denomination kind (step S140) by identification part 120 from the bank note S carried.Now, if performed the reading of the sequence number of bank note S by identification part 120, then the true and false of bank note can also be judged.The recognition result of the denomination obtained according to identification part 120, is accommodated in denominations box 140 (step S150) by the bank note S normally identified according to each denomination via transport path L3, L8.Be transported in supplementary rejection portion 164 by the bank note S not carrying out normal identification and receive, the number of bank note S is at this moment undertaken counting or estimating (step S134) by identification part 120.In addition, even if in the conveying in the transport path in downstream, identification part 120, the bank note S also can carry out the detection of above-mentioned presence or absence blocking, accompanying with this result to conveying block box 180 certainly and counting etc.
When bank note S is received in denominations box 140, then filling number bank note treatment device control part 190 being carried out to this denominations box 140 of store and management adds one (step S160).For the process (step S170) of all bank note repeated execution of steps S130 ~ S160 be loaded in supplementary recycling box 160.
When the process for all bank note step S130 ~ S160 completes (step S170: yes), bank note treatment device control part 190 upgrades for each box and stores its storage number, the box data shown in control chart 9.Above bank note filling process completes.When bank note filling process completes, the result of bank note filling process is informed to main control section 300 from bank note treatment device control part 190, the storage number data that operated by personnel portion 250 shows each box after about bank note filling determine situation etc. with it.After bank note filling process completes, operate if the utilization of staff to operated by personnel portion 250 starts switch 259 (with reference to Fig. 7), then main control section 300 accepts this operation, ATM10 is made to be can operating condition, namely client can carry out exchanging, withdraw the money, stored in etc. the state of operation, start or restart the utilization of ATM10.
Here, the indication example in operated by personnel portion 250 is described.Figure 10 represents from the storage number of all boxes shown in Fig. 6 is the original state of 0, the key diagram of the situation of the display in the operated by personnel portion 250 when not having mistake etc. to carry out bank note filling.In this Figure 10, show the 281 ~ three box by the first box corresponding with each box and show 283, this storage number numerical value is used to show by carrying out bank note filling from supplementary recycling box 160, special the first denomination box 140A of 10000 Japanese yen paper currencies receives 1500 10,000 Japanese yen paper currencies, special the second denomination box 140B of 5000 Japanese yen paper currencies receives 1200 5,000 Japanese yen paper currencies, and special the 3rd denomination box 140C of 1,000 Japanese yen paper currencies receives 2500 1,000 Japanese yen paper currencies.Carry out bank note owing to there is no the ground such as mistake to supplement, so at rejection box 150, supplement in recycling box 160, blocking box 180 these boxes and do not receive bank note, show the 284 ~ six box by the 4th box corresponding with these boxes and show 286 and this situation is shown as to receive number be 0.
In addition, the surrounding pattern in the display of these boxes and box group show the surrounding pattern of 270G, box group display 280G, device display 290G, are also shown by the fixed display mode of storage number of box.The display mode of the display of these numbers, surrounding pattern is decided by the box management data upgrading the Fig. 9 stored when the bank note filling of Fig. 8 processes, in the display mode of Figure 10, the box management data of Fig. 9 really given data is all good (OK), and access data and misdata are also all good (not having).Counting/estimation data is not for having data.
A-3. bank note pump-and-treat system:
Then, bank note pump-and-treat system is described.Bank note pump-and-treat system is under the operational situation after the utilization of ATM10 starts or after restarting, and extracts the bank note S received in the denominations box 140 of bank note treatment device 100 out, carries out the process of taking out via storage mouth 110.Under the control of main control section 300 (Fig. 3), perform bank note pump-and-treat system by bank note treatment device control part 190 (and each portion of the bank note treatment device 100 controlled by bank note treatment device control part 190).When client indicates cash withdrawal transaction via client operating portion 240, card/detail form treating apparatus 210 accepts card or bankbook processing device 220 accepts bankbook.Afterwards, after client inputs password and withdraw funds via client operating portion 240, to be carried out withdrawing the money transaction whether executable investigation to principal computer 400 by main control section 300.If can conclude the business from principal computer 400 notice, then notify from main control section 300 to bank note treatment device control part 190 that instruction extracted out by bank note, start bank note pump-and-treat system.Figure 11 is the process flow diagram of the flow process representing bank note pump-and-treat system.
When starting bank note pump-and-treat system, the number of each denomination of the bank note extracted out is set according to the withdraw funds of specifying, extract a piece of paper coin S according to this setting out from denominations box 140, the transport path of conveying mechanism 170 is carried this bank note S (step S210).The bank note S extracted out is transported to identification part 120 via transport path L9, L2 (with reference to Fig. 4).In the extraction and conveying of this bank note S, bank note treatment device control part 190 detects whether extract bank note S out a sheet by a sheet by first sensor 142 (with reference to Fig. 5), and detect according to the driving condition of conveying mechanism 170 has inerrancy namely block or reject simultaneously during the conveying of bank note S.And, whether extraction/the conveying detecting bank note S according to this testing result is one by one (step S212), if it is determined that wrong, then corresponding bank note S be transported in blocking box 180 or supplementary recycling box 160 and carry out keeping (step S214).
In step S214, identical with the step S134 that above-mentioned bank note is filled up in process, when carrying out the conveying keeping of bank note S to blocking box 180 or supplementary recycling box 160, carry out counting or the presumption of the number of this bank note S, upgrade the box process data shown in storage figure 9.Then step S214, the step S212 before turning back to, every after carrying out extracts out one by one, carry and it detects.
In step S212 when being judged to have carried out often extracting out one by one/carrying, at least obtain its denomination classification (step S220) by identification part 120 from the bank note S carried.Now, if performed the reading of the sequence number of bank note S by identification part 120, then the true and false of bank note can also be judged.Even if in the conveying in the transport path in downstream, identification part 120, also can carry out detection (often carrying detection one by one) (the step S222) of the blocking of above-mentioned presence or absence, the bank note S accompanied with this result to conveying block box 180 certainly and counting etc. (step S214).
According to the recognition result of identification part 120, via transport path L3, L6, L7, the bank note S normally identified is transported to storage mouth 110, and via transport path L3, L8, the normal bank note S identified is transported to rejection box 150 to receive, at this moment counts or estimate by the number of identification part 120 to bank note S (step S214).
When bank note S is transported to storage mouth 110, for the denominations box 140 of extraction having carried out bank note S in step S210 before, filling number bank note treatment device control part 190 being carried out this denominations box 140 of store and management subtracts one (step S250).Then, about this denominations box 140, bank note treatment device control part 190 upgrades each box and stores its storage number, the box data (step S260) shown in control chart 9.Afterwards, judge whether the extraction of the bank note extracted out all completes (step S270), when being judged to also not complete (step S270: no), the processing returns to step S210.
Complete in judgement (step S280) in the extraction of bank note, when the extraction of the bank note that should extract out being judged to set according to withdraw funds completes (step S280: yes), bank note pump-and-treat system completes.In addition, when bank note pump-and-treat system completes, from bank note treatment device control part 190 to main control section 300, notice takes out result.When the bank note S of the withdraw funds that client is indicated normally is released to storage mouth 110, transaction of withdrawing the money completes.
Here, the display situation for the operated by personnel portion 250 during above-mentioned bank note pump-and-treat system is described.Bank note treatment device control part 190 also carries out renewal storage to manage to the box management data shown in Fig. 9 between the on-stream period of ATM10, so, operated by personnel portion 250, according to these data, can show the box-like condition display 260 of having reacted the storage number of each box shown in Figure 10 all the time.Further, the bank note containing situation (such as Figure 10) of each box in the running of the ATM10 shown by operated by personnel portion 250 can be sent to principal computer 400 at every turn.Figure 12 is the situation of the box-like condition display 260 represented in the operated by personnel portion 250 when not having the pump-and-treat system of the beginning bank note such as above-mentioned mistake all the time and does not have the box-like condition at the end of the pump-and-treat system of the bank note such as mistake to show the key diagram of the situation of 260 all the time.Figure 13 represents that the process of extracting out at bank note creates above-mentioned mistake etc., the key diagram of the situation of the box-like condition display 260 at the end of the pump-and-treat system of bank note.In fig. 12, before the pump-and-treat system of bank note starts, show by the first box corresponding with each box the first denomination box 140A that the 281 ~ three box storage number numerical value shown in 283 shows 10,000 Japanese yen paper currencies special and receive 1500 10,000 Japanese yen paper currencies, special the second denomination box 140B of 5000 Japanese yen paper currencies receives 1200 5,000 Japanese yen paper currencies, and special the 3rd denomination box 140C of 1,000 Japanese yen paper currencies receives the situation of 2500 1,000 Japanese yen paper currencies.Will rejecting box 150, the situation of supplementing recycling box 160, not receiving bank note in blocking box 180 these boxes, show the 284 ~ six box by the 4th box corresponding with these boxes and show 286 and be shown as that to receive number be 0.
In addition, the surrounding pattern in the display of these boxes and box group show the surrounding pattern of 270G, box group display 280G, device display 290G, are also shown by the fixed display mode of storage number (the determination mode shown in Fig. 6) of box.The box management data of the Fig. 9 before being started by the pump-and-treat system of bank note decides the display mode of the display of these numbers, surrounding pattern, in the display mode of Figure 12, the box management data of Fig. 9 really given data is all good (OK), is also all good (not having) about access data and misdata.Counting/estimation data is not for having data.
Figure 12 (B) is the pump-and-treat system not having mistake etc. to carry out bank note all the time, the display in such as, operated by personnel portion 250 at the end of the extraction of 20 1,000 yuan notes.Therefore, three box corresponding with the 3rd denomination box 140C (with reference to Fig. 4) show 283 by the extraction of step S210 ~ 260 of Figure 11, and that is the storage number before beginning 2500 is deducted 20 numerical value obtained 2480 and be shown as present situation and receive number.Show in 281 grades at the first box corresponding with other denominations box 140, owing to not extracting out, so front original number is extracted in numerical value display out.And, all the time the pump-and-treat system of the bank note such as mistake is not had to terminate, so the surrounding pattern of surrounding pattern in the display of each box and box group display 270G, box group display 280G, device display 290G, also shown by the fixed display mode of storage number (the determination mode shown in Fig. 6) of box.
On the other hand, represent that the number extracting 1,000 Japanese yen paper currencies out to storage mouth 110 is 20 at Figure 13, but result is during being retracted to storage mouth 110 by 20 1,000 Japanese yen paper currencies, the display mode that there occurs blocking when bank note is extracted out or in course of conveying or take out of when waiting wrong.The bank note S that there occurs such mistake is classified into according to this error category to reject box 150 or block box 180 and carries out carrying and taking care of (Figure 11: step S214).So the above-mentioned mistake such as to take out of, for denominations box 140, is now that the determination of the storage number of the bank note S in the 3rd denomination box 140C brings interference, therefore, this situation is shown as follows in fig. 13.
The display mode box management data as shown in Figure 9 of the box-like condition display 260 in the operated by personnel portion 250 shown in Figure 12, Figure 13 decides, in this box management data, by there occurs counting or the presumption of the number in the step S214 of Figure 11 of the bank note S of mistake, in the field of the RB3 corresponding with the 3rd denomination box 140C, misdata is (having).According to counting and presumption, counting/estimation data is upgraded, as mentioned above if often block one by one, then by counting the number of blocking bank note during identification part 120, accumulating the data of counting (K), determining the data of data accumulation good (OK).Further, now, be classified into and reject box 150 or blocking box 180, the number of conveying/keeping carries out counting to determine as described above.Then, by storage number complete for the counting of bank note S that there occurs mistake with the rejection box 150 of its conveying destination or block in field corresponding to box 180, renewal storage is carried out as number data.In addition, number data in the field of the RB3 corresponding with the 3rd denomination box 140C become and deduct from the storage number (2480) of the 3rd denomination box 140C of the result as extraction 20 the storage number (2470) that the complete storage number (such as 10) of the above-mentioned counting of bank note S that there occurs mistake obtains, and upgrade and store these data.In fig .9, with the field rejecting AB4 corresponding to box 150, although wrong as described above, but illustrated by number counting (K) and determine that data are the situation of good (OK).Now, as the above-mentioned storage number (2480) of the 3rd denomination box 140C of the result of extraction 20 be do not make a mistake time determined storage number.
If cannot carry out there occurs the counting of the bank note S of mistake as multiple are taken out of, bank note treatment device control part 190 is according to taking the number that sensor detection time by time, first sensor 142 etc. estimate the bank note S that there occurs mistake of bank note in identification part 120 out of.Further, in the box management data of Fig. 9, the data of accumulation presumption (S) in counting/estimation data, determine that data accumulation can not the data of (NG), upgrade as described above and store these data.About the 3rd denomination box 140C, and in counting/estimation data, accumulate the data estimating (S), determine data accumulation can not the data of (NG) time display mode correspondingly, determine the display mode of Figure 13 as described below.
First, bank note treatment device control part 190 carries out carrying the presumption of keeping storage number (such as 5) to estimate to rejecting box 150 to being estimated as classification as described above.By this presumption storage number (5) in the field of the AB4 corresponding with the rejection box 150 of the conveying destination that there occurs wrong bank note S, carry out renewal as number data to store, showing in 284 at the 4th box corresponding with rejecting box 150, carrying out numerical value display as shown in Figure 13.Now, because number data are presumed value, thus with reject the surrounding pattern that the 4th box corresponding to box 150 show 284 and become the presumption mode shown in Fig. 6.In addition, the number that three box corresponding with the 3rd denomination box 140C shows 283 shows, as shown in Figure 13, the storage number (2475) that above-mentioned presumption storage number (5) that deducts the bank note S that there occurs mistake from the storage number (2480) of the 3rd denomination box 140C of the result as extraction 20 obtains is become.Now, the three box above-mentioned subtraction that show 283 shown by corresponding with the 3rd denomination box 140C is received number and is received number (5) according to the presumption of bank note S that there occurs mistake and obtain, and therefore becomes presumed value.Therefore, the surrounding pattern that the 3rd corresponding with the 3rd denomination box 140C box shows 283 becomes the presumption mode shown in Fig. 6.
In addition, box group display 270G is because comprise the 3rd box display 283 that number is presumption, so the number of the first box display the 281 ~ three box display 283 also comprises presumption number, therefore, the surrounding pattern of box group display 270G becomes the presumption mode shown in Fig. 6.At this moment, although box group display 270G and the box group display 280G comprising the 4th box display 284 comprises the 3rd box display 283 and the 4th box display 284 that number is presumption, but the number of these two box displays and consistent with the storage number (2480) of the 3rd denomination box 140C of the result as extraction 20, determine.In addition, by being carried to denominations box 140 by the bank note S rejecting storage in box 150, can be used in the utilization of ATM10.Therefore, the surrounding pattern of box group display 280G becomes the determination mode shown in Fig. 6.Device display 290G too.In addition, if the number being accommodated in the bank note S rejected in box 150 due to mistake can be counted, the number then extracted out from the 3rd denomination box 140C and received number and determine, so the box-like condition display 260 of Figure 13 is except the 3rd box display 283 and the 4th box display 284, at box group display 270G, its surrounding pattern becomes the determination mode of Fig. 6.
A-4. bank note containing process:
Then, bank note containing process is described.Bank note containing process is after the running of ATM10 starts, by via storage mouth 110 stored in bank note S be received into process in denominations box 140.Under the control of main control section 300 (Fig. 2), perform bank note containing process by bank note treatment device control part 190 (and each portion of the bank note treatment device 100 controlled by bank note treatment device control part 190).When client indicates execution cash stored in transaction via client operating portion 240, perform stored in process and bank note containing process.Stored in process, extract from storage mouth 110 the bank note S that client puts into storage mouth 110 out, be transported to identification part 120 via transport path L2, identified by identification part 120.The bank note S normally identified by identification part 120 is transported in temporary transient reserve part 130 via transport path L3, L4 and receives, the normal bank note S identified is turned back to storage mouth 110 via transport path L3, L6, L7.When completing stored in process, from bank note treatment device control part 190, this result being informed to main control section 300, showing in client operating portion 240.When client confirm in client operating portion 240 display stored in the amount of money after, send storage instruction from the main control section 300 pairs of bank note treatment device control parts 190, start bank note containing process.Figure 14 is the process flow diagram of the flow process representing bank note containing process.
When starting bank note containing process, extract the bank note S (step S310) of a storage in temporary transient reserve part 130 (with reference to Fig. 4) out, via transport path L5, L6, L2, the bank note S of extraction is transported to identification part 120, carries out the identification of bank note S and the reading (step S320) of sequence number by identification part 120 from the bank note S carried.Afterwards, according to the recognition result of identification part 120, via transport path L3, L8, bank note S is carried/is received into (step S330) in the denominations box 140 of corresponding denomination.In addition, storage mouth 110 is returned to via transport path L3, L6, L7 by by the abnormal bank note S identified in identification part 120.
In the extraction of this bank note S and conveying, storage, whether bank note treatment device control part 190 is while detect bank note S by first sensor 142 (with reference to Fig. 5) and be accommodated in one by one in denominations box 140, and detect according to the driving condition of conveying mechanism 170 has inerrancy namely block or reject during the conveying of bank note S.And, whether storage/the conveying detecting bank note S according to this testing result is one by one (step S332), if it is determined that be wrong, then corresponding bank note S is transported to blocking box 180 or supplementary recycling box 160 carry out keeping (step S334).
In step S334, the step S134 filled up in process with above-mentioned bank note is identical with the step S214 in bank note pump-and-treat system, when to the denominations box 140 corresponding with denomination conveying keeping bank note S, carry out counting or the presumption of the number of this bank note S, upgrade the box management data shown in storage figure 9.Then step S334, the step S310 before turning back to, often extracting out one by one and receiving/carry and above-mentioned detection after carrying out.
When being judged in step S332 to have carried out often extracting out one by one and receiving/carry, for the denominations box 140 of storage destination becoming bank note S in step S330 before, the filling number of this denominations box 140 of bank note treatment device control part 190 store/manage is added one (step S340).Then, about this denominations box 140, bank note treatment device control part 190 upgrades each box and stores its storage number, the box data (step S350) shown in control chart 9.
Afterwards, judging whether the storage process about all bank note S of storage in temporary transient reserve part 130 completes (step S360), when being judged to also not complete (step S360: no), again performing the process from step S310 to S350.When judging to complete about the storage process of all bank note S (step S360: yes), bank note containing process completes.When bank note containing process completes, from bank note treatment device control part 190, storage result is informed to main control section 300, cash completes stored in transaction.
Even if during above-mentioned bank note containing process, also by performing step S334, bank note treatment device control part 190 upgrades the box management data shown in control chart 9 at any time.Thereby, it is possible to carry out the box-like condition display 260 shown in Figure 12 and Figure 13.The box-like condition display 260 in the operated by personnel portion 250 during bank note containing process is below described.Figure 15 is the situation of the box-like condition display 260 represented when not having the storage process of the beginning bank note such as above-mentioned mistake all the time and does not have the box-like condition at the end of the storage process of the bank note such as mistake to show the key diagram of the situation of 260 all the time.Figure 16 creates above-mentioned mistake etc. in the process of bank note containing, the key diagram of the situation of the box-like condition display 260 at the end of bank note containing process.In fig .15, show 260 identical with the box-like condition of above-mentioned Figure 12, show 281 grades by the first box of correspondence and the denominations box 140 of each denomination, the bank note of rejecting box 150 etc. have been received to number and carried out numerical value display.About the surrounding pattern in box display, be also fixedly determine that mode (with reference to Fig. 6) shows by the storage number of box.The box management data of the Fig. 9 before being started by bank note containing process decides the display mode of the display of these numbers, surrounding pattern, in the display mode of Figure 15 (A), the box management data of Fig. 9 really given data is all good (OK), is also all good (not having) about access data and misdata.Counting/estimation data is not for having data.
Figure 15 (B) does not have mistake to wait bank note containing process, the display in such as, operated by personnel portion 250 at the end of the storage of 10 5,000 Japanese yen paper currencies all the time.Thus, second box corresponding with the second denomination box 140B (with reference to Fig. 4) shows the extraction that 282 pass through step S310 ~ 350 of Figure 14, and the storage number 1200 before starting is added that 1210 of 10 numerical value obtained are shown as present situation storage number.Show in 281 grades at the first box corresponding with other denominations box 140, owing to there is no bank note containing, so front original number is extracted in numerical value display out.And, because do not have mistake to wait bank note containing process to terminate all the time, so the surrounding pattern of surrounding pattern in the display of each box and box group display 270G, box group display 280G, device display 290G, also shown by the fixed display mode of storage number (the determination mode shown in Fig. 6) of box.
On the other hand, the storage number illustrating 5,000 Japanese yen paper currencies is in figure 16 10, but result is during 5,000 Japanese yen paper currencies of storage 10, there occurs in course of conveying or box storage time the mistake such as blocking time display mode.The bank note S that there occurs such mistake is categorized into according to this error category and rejects box 150 or blocking box 180 carries out carrying and taking care of (Figure 14: step S334).And above-mentioned Figure 13 is same, this situation is shown as follows so above-mentioned mistake, for denominations box 140, is now that the determination of the storage number of the bank note S in the second denomination box 140B brings interference, therefore.
The display mode of the box-like condition display 260 in the operated by personnel portion 250 shown in Figure 15 and Figure 16 is decided by the box management data shown in Fig. 9, about this box management data, owing to there occurs counting or the presumption of the number of bank note S in the step S334 of Figure 14 of mistake, carry out more new management as described above.Figure 16 (C) is the box-like condition display 260 of the state of the storage number estimated to blocking box 180, and as shown in the figure, the surrounding pattern that six box corresponding with blocking box 180 shows 286 becomes the presumption mode shown in Fig. 6.The display numerical value of the 6th box display 286 becomes presumption storage number (such as 2).In addition, the number that the second corresponding with the second denomination box 140B box shows 282 shows to be become the above-mentioned presumption deducting the bank note S that there occurs mistake from the storage number (1210) of the second denomination box 140B of the result as storage 10 and receives the storage number (1208) that number (such as 2) obtains.Now, corresponding with the second denomination box 140B the second box above-mentioned subtraction shown shown by 282 is received number and is received number (2) according to the presumption of bank note S that there occurs mistake and obtain, so become presumed value.Thus, the surrounding pattern that the second corresponding with the second denomination box 140B box shows 282 becomes the presumption mode shown in Fig. 6.In addition, as the above-mentioned storage number (1210) of the second denomination box 140B of the result of storage 10 be do not make a mistake time determined storage number.
In addition, box group display 270G comprises the second box display 282 that number is presumption, so the number of the first box display the 281 ~ three box display 283 also comprises presumption number, therefore, the surrounding pattern of box group display 270G becomes the presumption mode shown in Fig. 6.At this moment, box group display 270G and the box group display 280G comprising the 3rd box display 283 comprises the 3rd box display 283 that number is presumption, and therefore surrounding pattern becomes the presumption mode shown in Fig. 6.And, box group display 280G and the device display 290G comprising the 6th box display 286 comprises the 6th box display 286,6th box display 286 is corresponding with the blocking box 180 of untapped bank note S in the utilization (bank note is extracted out and received) for being accommodated in ATM10, and therefore its surrounding pattern becomes the presumption mode shown in Fig. 6.In addition, if the number being accommodated in the bank note S in blocking box 180 due to mistake can be counted, the number then received to denominations box 140 is determined, so the box-like condition display 260 of Figure 16 is except the second box display 282 and the 6th box display 286, for box group display 270G, box group display 280G, device display 290G, its surrounding pattern becomes the determination mode of Fig. 6.
A-5. detailed survey process:
Then, detailed survey process is described.Detailed survey process is in predetermined timing, after such as through between predetermined on-stream period or the timing carrying out that bank note is filled up to denominations box 140 etc., in order to grasp the remaining sum of the bank note in device, the process determining number is counted to the bank note S of storage in denominations box 140.Under the control of main control section 300 (Fig. 3), perform detailed survey process by bank note treatment device control part 190 (and each portion of the bank note treatment device 100 controlled by bank note treatment device control part 190).By staff, the supplementary recycling box 160 of sky is set in bank note treatment device 100, accepts the pressing operation of the detailed survey processing execution switch 256 (with reference to Fig. 7) carried out via operated by personnel portion 250, start detailed survey process.Operation as mentioned above via staff performs detailed survey process, in the present embodiment, according to the presence or absence that the determination of the storage number to the bank note S in denomination classification box 140 brings the box of interference to access, selects the object box of detailed survey process as described later.That is, the check processing accessed with or without box and detailed survey process are closely related, and therefore first check processing are described.
Figure 17 is the process flow diagram of the flow process of the check processing represented with or without box access.This check processing may exist under the situation to the access of denomination classification box 140 grade, such as from opening illustrated back gate 12 until close during, repeated by bank note treatment device control part 190.In this check processing, first bank note treatment device control part 190 detects with or without box access (step S410) to each denominations box 140 by the second sensor 144 (with reference to Fig. 5) of denominations box 140, if it is determined that be not access, then end process.On the other hand, if it is determined that for there being box to access, then bank note treatment device control part 190 denominations box 140, the denominations box 140 (step S420) that namely has box to access of determining to have the second sensor 144 access being detected.Then, for this specific denominations box 140, upgrade the box management data (step S430) shown in storage figure 9, end process.At Fig. 9, in the field of the RB2 corresponding with the second denomination box 140B, illustrate make it determine data are the state of NG, this becomes at above-mentioned step S420, has box to access for the second denomination box 140B, upgrade store this result.Figure 18 is the key diagram of the situation of the box-like condition display 260 represented when to detect in the second denominations box 140B that box accesses.
As shown in the figure, show in 282 at the second box corresponding with the second denomination box 140B that box accesses being detected, its surrounding pattern and Fig. 9 really given data NG are corresponding, and what become Fig. 6 does not determine mode, and the surrounding pattern that the box corresponding with the box beyond this shows becomes the determination mode of Fig. 6.Further, the box group display 270G comprising the second box display 282 not determining mode and the box group display 280G comprising these, device display 290G, what its surrounding pattern also all became Fig. 6 does not determine mode.In addition, in the box corresponding with each box shows, numerical value display is carried out to the storage number in this moment, but in the second box display 282, bringing the box of interference to access along with detecting to the determination of the storage number of bank note S, becoming undetermined storage number.
While with reference to the result of above-mentioned check processing, carry out detailed survey process as follows.Figure 19 is the process flow diagram of the flow process representing detailed survey process first half.Figure 20 is the process flow diagram of the flow process representing detailed survey process latter half.
When staff starts detailed survey process via the operation of detailed survey processing execution switch 256 (Fig. 7), bank note treatment device control part 190 reads in the box management data (step S510) shown in Fig. 9.Then, the box-like condition display display of 260 of the box management data read in based on this and the prompting (step S520) of the box of detailed survey object is carried out.The box-like condition display 260 of such display adopts any one display mode in above-mentioned Figure 10, Figure 12 ~ 13, Figure 15 ~ 16, Figure 18.
If receive number to determine in each denominations box 140, then box-like condition display 260 is as Figure 10, Figure 12, Figure 15, by determining mode to show that the first box shows the surrounding pattern of each box display of 281 grades.If receiving number in any one denominations box 140 is presumption number, then box-like condition display 260 is as shown in Figure 13 and Figure 16, be only the box display (such as the second box display 282) of presumption number to storage number, show its surrounding pattern by presumption mode.If detected that box accesses in any one denominations box 140, then box-like condition display 260 as shown in figure 18, only to the box display (such as the second box display 282) detecting that box accesses, by not determining that mode shows its surrounding pattern.That is, about box-like condition display 260, even if distinguish use access with the mistake owing to not there is above-mentioned blocking and rejection and box therefore receive number fixed denominations box 140 there occurs above-mentioned mistake but count bring the number of the bank note S of this mistake after fixed denominations box 140, to have estimated the denominations box 140 of receiving number due to above-mentioned mistake and detected that the first box that these each boxes of denominations box 140 that box accesses are corresponding shows the display mode of the surrounding pattern of 281 etc., each box is shown and receives number.
And, even if therefore receive number in the mistake owing to not there is above-mentioned blocking and recovery and box access determined or there occurs above-mentioned mistake but after counting the number of the bank note S bringing this mistake in fixed situation (with reference to Figure 10, Figure 12, Figure 15), bank note treatment device control part 190, by determining the surrounding pattern that mode shows the first box and shows 281 grades, does not point out detailed survey object box thus.In addition, even if due to above-mentioned mistake presumption storage number, if but with accommodated collecting number and identical with the collecting number of denominations box 140 before mistake (with reference to Figure 13, Figure 16) of box of the bank note S bringing this presumption, then bank note treatment device control part 190 shows by presumption mode the surrounding pattern that the first box shows 281 grades, does not point out detailed survey object box thus.On the other hand, about the denominations box 140 (with reference to Figure 18) detecting that box accesses, this denominations box 140, by not determining the surrounding pattern that mode shows the first box and shows 281 grades, is prompted for detailed survey object box by bank note treatment device control part 190 thus.Now, surrounding pattern can be made to carry out light-emitting flash to point out.
Bank note treatment device control part 190, after the box-like condition display 260 that display is above-mentioned, carries out standby wait staff and starts to count detailed survey (step S525).Staff observes the prompting situation of the detailed survey object box represented by above-mentioned box-like condition display 260, whole counter switch display 262 of operating personnel's operating portion 250 of application drawing 7 or counter switch display 264, or print switch display 266.Bank note treatment device control part 190 starts detailed survey process according to this switching manipulation.
In step S520, if illustrate by above-mentioned determination mode or presumption mode the surrounding pattern that the first box shows 281 etc., then staff is set to nothing by needing the denominations box 140 of detailed survey process, operation print switch display 266.So the box-like condition display 260 of display in operated by personnel portion 250 is undertaken printing (step S527) by outside printer or detail form treating apparatus 210 by bank note treatment device control part 190, terminates detailed survey process.Now, box-like condition display 260 can be sent to principal computer 400.
In step S520, if do not determine by above-mentioned the surrounding pattern that mode illustrates the first box and shows 281 grades, then staff is not determining, in the denominations box 140 that the display of mode is corresponding, to be set to and to need detailed survey process with this, operation count switch display 264.So, the denominations box 140 corresponding with not determining the display of mode is chosen as detailed survey object by bank note treatment device control part 190, from this denominations box 140, specifically extract bank note S one by one out from showing 282 corresponding the second denomination box 140B with the second box shown in Figure 18 and carry (step S530) termly, read by identification part 120 and obtain identification and the sequence number (step S540) of the denomination of this bank note S.When normally being identified by identification part 120, be received into by bank note S in supplementary recycling box 160 (step S550), bank note treatment device control part 190 stores after the detailed survey number of this denomination is increased by 1 at every turn.In addition, when identifying by identification part 120 is abnormal, bank note S being accommodated in and rejecting in box 150.
Then, determine whether extract out from the denominations box 140 becoming detailed survey object and delivered all bank note S (step S555), repeat the process of step S530 ~ 550 until carry out affirmative judgement at this.At the end of the extraction conveying being judged to be all bank note S (step S555: yes), perform following process successively: the bank note S reclaiming storage is turned back to the denominations box 140 becoming detailed survey object, in order to carry out number detailed survey, extract a piece of paper coin S out from supplementary recycling box 160 to carry out carrying (step S560) at every turn, read by identification part 120 and obtain this bank note S denomination identifying and sequence number (step S570), return storage bank note S (step S580) to the denominations box 140 of detailed survey object.And, when the reading of step S570, the bank note S normally identified by identification part 120 is returned the denominations box 140 being received into detailed survey object, and, the detailed survey number of this denomination is at every turn increased by one by bank note treatment device control part 190, and this number is received into number in denominations box 140 and detailed survey number stores as actual the returning of bank note S.When identifying by identification part 120 is abnormal, bank note S being received into and rejecting box 150, the number of this rejection bank note is got rid of outside above-mentioned detailed survey number.
Then, determine whether extract out from supplementary recycling box 160 and delivered all recovery storage bank note (step S585), repeat the process of step S560 ~ 580 until carry out affirmative judgement here, the detailed survey process for the denominations box 140 of detailed survey object completes.Like this, when the detailed survey process of the denominations box 140 for the detailed survey object of pointing out in step S520 completes, bank note treatment device control part 190 prints this detailed survey result, and this detailed survey result is sent to principal computer 400.In addition, about the box-like condition display 260 in operated by personnel portion 250, by become detailed survey object owing to there being box to access the second denomination box 140B corresponding to the surrounding pattern of the second box display 282 (with reference to Figure 18), never determine that its display mode changes to by mode as the first box display 281 and determine mode.The processed group of above-mentioned step S530 ~ 585 is a series of process about its collecting number of denominations box 140 detailed survey, therefore hereinafter referred to as box unit detailed survey process (step S600).
On the other hand, in step S520, when by operated by personnel, whole counter switch shows 262, bank note treatment device control part 190 performs detailed survey process to all denominations boxes 140.Such as, the situation of running ATM10 may be there is, to carry out the situation of equipment utilization to the mode that all denominations boxes 140 carry out detailed survey process according to each scheduled period.In these cases, the presence or absence of the prompting of the detailed survey object box carried out with the display showing 260 by box-like condition has nothing to do, the whole counter switch display 262 of operated by personnel.If when indicating detailed survey process for all denominations boxes 140 like this, bank note treatment device control part 190 as shown in figure 20, for a denominations box 140, such as performs above-mentioned a series of box unit detailed survey process (step S610) to the first denomination box 140A.Further, when completing the box unit detailed survey process of all denominations boxes 140 (step S620), bank note treatment device control part 190 prints this detailed survey result, and sends it to principal computer 400.In addition, bank note treatment device control part 190, for box-like condition display 260, makes the surrounding pattern of the first box display the 281 ~ three box display 283 for determining mode.
As described above, in the ATM10 of the present embodiment, the bank note S carrying out processing is received into the first denomination box 140A ~ the 3rd denomination box 140C of each denomination, extracts bank note S when concluding the business out from each box and receive.The ATM10 of the present embodiment detects and the determination of the storage number of the paper of above-mentioned denominations box 140 is brought to the special event of the mistake of interference etc., specifically detects with or without blocking, rejects or box storage (Fig. 8: step S134, Figure 11: step S214, Figure 14: step S334, Figure 17: step S410).And, the ATM10 of the present embodiment manages present situation storage number (Fig. 9) of the bank note S occurred before above-mentioned special event respectively for the first denomination box 140A ~ the 3rd denomination box 140C of each denomination, by the storage situation of the bank note S in the first denomination box 140A ~ the 3rd denomination box 140C, according to each classification box, carry out showing (Fig. 6 etc.) as the first box display the 281 ~ three box display 283 by box-like condition display 262.
When the storage situation of display first denomination box 140A ~ the 3rd denomination box 140C, for owing to not there is special event present situation storage number fixed denominations box 140, determine mode to show by box storage number is fixed the surrounding pattern that first box corresponding with this box shows the 281 ~ three box and show the upper end side of 283.In addition, the undetermined denominations box 140 of number is received for owing to there occurs special event present situation, mode is not determined to show the surrounding pattern that first box corresponding with this box shows the 281 ~ three box and show the upper end side of 283 by box storage number is not confirmable, that is, the ATM10 of the present embodiment is for present situation storage number fixed denominations box 140 and the undetermined denominations box 140 of present situation storage number, distinguish and use its display mode, each classification box is presented to the bank note containing situation (Fig. 6 in each denominations box 140 by different display modes, Figure 18).Therefore, according to the ATM10 of the present embodiment, for the staff taking on detailed survey process, easily and definitely can identify that the storage number of the bank note S of which the denominations box 140 in the first denomination box 140A ~ the 3rd denomination box 140C is for determine, the storage number of the bank note S of which denominations box 140 is not determined.Therefore, the fixed denominations box 140 of storage number for bank note S, get rid of from the candidate of detailed survey processing selecting and do not perform detailed survey process (Figure 19: step S525), the undetermined denominations box 140 of storage number can be chosen as the execution object of detailed survey process.As a result, according to the ATM10 of the present embodiment, self quantity of the denominations box 140 carrying out detailed survey process can be reduced, so the time required for detailed survey process more can be shortened.
In addition, in the ATM10 of the present embodiment, when showing the storage situation of the bank note S of the first denomination box 140A ~ the 3rd denomination box 140C by the first box display the 281 ~ three box display 283 of box-like condition display 260, to the storage number of each box display bank note S.Therefore, for the staff taking on detailed survey process, the storage number of the present situation of denominations box 140 easily can be identified for each box.
In addition, at the ATM10 of the present embodiment, the rejection box 150 being used for receiving the bank note S causing rejection is provided separately with denominations box 140, if there occurs rejection, by this rejection bank note by conveying mechanism 170 classified storage in rejection box 150.And, about the data management (Fig. 9) of the storage number of the bank note S in denominations box 140, except management is except the storage number of bank note rejecting storage in box 150, the storage number having deducted this storage number is managed as to the storage number that relevant denominations box 140 occurs to reject, these storage numbers is presented in the first box display the 281 ~ four box display 284 of each box of box-like condition display 260.Therefore, according to the ATM10 of the present embodiment, staff can be made to identify the number rejecting bank note.For blocking be also the same.
Further, the ATM10 of the present embodiment is counted by identification part 120 or first sensor 142 number at the rejection bank note rejecting storage in box 150 or estimates.Further, by distinguish at the counting of number and presumption of rejecting storage in box 150 due to produce reject storage number may the display mode of surrounding pattern of the first box display the 281 ~ three corresponding to undetermined denominations box 140 and display 283.Now, if counted the number of storage in rejection box 150, then this storage number and the present situation storage number due to the undetermined denominations box 140 of generation rejection storage number possibility are determined.Therefore, the undetermined denominations box 140 of storage number possibility is rejected for owing to producing, determine to process as storage number, by determining mode to show that the first box shows the surrounding pattern of 281 grades, and from the selection candidate of detailed survey process, this denominations box can be got rid of.Therefore, the quantity becoming the denominations box 140 of the object of detailed survey process becomes less, so can shorten the time required for detailed survey process further.
In addition, when having estimated this storage number when counting the storage number rejecting box 150, show the surrounding pattern (Fig. 6, Figure 13) about receiving the first box display the 281 ~ three box display 283 of the undetermined denominations box 140 of number possibility owing to occurring to reject by presumption mode.The storage number of denominations box 140 corresponding to box display being shown surrounding pattern like this by presumption mode becomes the number deduced based on above-mentioned presumption number.But, the presumption storage number of rejection box 150 is consistent with the storage number rejecting the denominations box 140 before occurring with the storage number sum owing to there is the undetermined denominations box 140 of rejection storage number possibility, rejects bank note and stays in rejection box 150 and can not be taken outside device.Therefore, according to the ATM10 of the present embodiment, denominations box 140 corresponding to the box being shown surrounding pattern by presumption mode is shown, also get rid of from the selection candidate of detailed survey process, make the quantity of the denominations box 140 carrying out detailed survey process become less, thus the time required for detailed survey process can be shortened.
Be explained above embodiments of the present invention, but the present invention can not be defined in such embodiment, can implement various mode in the scope not departing from its aim.Such as, in the box-like condition display 260 shown in Figure 16, staff is after having pressed the second box display 282 shown by presumption mode, if pressing counter switch display 264, then can show 282 corresponding the second denomination box 140B as detailed survey object using with the second box of presumption mode, carry out the detailed survey process of this box.
Symbol description
10: automatic trading apparatus (ATM)
12: back gate
100: bank note treatment device
110: storage mouth
120: identification part
130: temporarily reserve part
140: denominations box
140A: the first denomination box
140B: the second denomination box
140C: the three denomination box
142: first sensor
144: the second sensors
150: reject box
160: supplement recycling box
162: separation vessel
163: supplement recoverer
164: supplement rejection portion
170, conveying mechanism
180: blocking box
190: bank note treatment device control part
194: test section
210: detail form treating apparatus
220: bankbook processing device
230: Coin processor
240: client operating portion
250: operated by personnel portion
252: initial picture
254: bank note filling switch
256: detailed survey processing execution switch
258: maintenance switch
259: use and start switch
260: box-like condition display
262: all counter switch displays
264: counter switch shows
266: print switch shows
270G: box group shows
280G: box group shows
281: the first box displays
282: the second box displays
283: the three box displays
284: the four box displays
285: the five box displays
286: the six box displays
290G: device shows
300: main control section
400: principal computer
192: detailed survey/pipage control portion
S: bank note
L1 ~ L10: transport path
Claims (amendment according to treaty the 19th article)
1. (after revising) a kind of bill handling device, it processes the paper of multiple classification, it is characterized in that,
Possess:
Multiple classification box, it carries out preparation to receive paper according to each classification of above-mentioned paper, and carries out the extraction of the paper of this storage;
Relevant transport path is carried in the extraction of the paper carried to the storage of each above-mentioned classification box with paper and extract out from each above-mentioned classification box;
Classification information obtaining section, it counts the number of the paper carried in above-mentioned transport path, while obtain the classification information determining paper classification according to the paper of this conveying;
Special event detection portion, it detects the situation occurred determination of the paper storage number of above-mentioned classification box being brought to the special event of interference for each above-mentioned classification box;
Box management department, the counting number of its paper obtained according to above-mentioned classification information obtaining section, the present situation storage number of the paper before the above-mentioned special event of each above-mentioned classification box management is occurred; And
Display part, it shows the storage situation of the paper of above-mentioned classification box to each classification box,
This display part distinguishes use first display mode, second display mode and the 3rd display mode, above-mentioned storage situation is shown to each classification box, first display mode is about owing to not there is above-mentioned special event, the display mode of the fixed box of above-mentioned present situation storage number of each above-mentioned box, second display mode is about owing to there occurs above-mentioned special event, the display mode of the undetermined box of above-mentioned present situation storage number of each above-mentioned box, 3rd display mode does not determine about the above-mentioned present situation storage number owing to there occurs each above-mentioned box of above-mentioned special event, but the display mode of the box that can estimate.
2. (after revising) bill handling device according to claim 1, is characterized in that,
Above-mentioned present situation storage number is included in above-mentioned storage situation and shows by above-mentioned display part, and above-mentioned classification box has the second sensor that the first sensor detected storage and extraction of whether having carried out each bank note and the lid detecting above-mentioned classification box have been opened.
3. (after revising) bill handling device according to claim 1 and 2, is characterized in that,
Possess:
Non-classification box, it prepares respectively with above-mentioned classification box, can receive the paper causing above-mentioned special event via above-mentioned transport path;
Division, the paper causing above-mentioned special event is sorted in above-mentioned non-classification box via above-mentioned transport path and receives by it,
Above-mentioned box management department is when being accommodated in the paper causing above-mentioned special event in above-mentioned non-classification box by above-mentioned division, being undertaken counting or estimate the storage number obtained to above-mentioned non-classification box by the storage number of the above-mentioned non-classification box of above-mentioned classification information obtaining section subtend, is by any storage number obtained in counting or estimating to each above-mentioned classification box management from the above-mentioned storage number of the storage number obtained after above-mentioned present situation storage number deducts the above-mentioned storage number obtained about above-mentioned non-classification box and the paper that causes above-mentioned special event to receive above-mentioned non-classification box.
4. the bill handling device according to any one of claims 1 to 3, is characterized in that,
Possess:
Detailed survey handling part, it performs detailed survey process, namely paper is extracted out from above-mentioned classification box, while carry the paper of this extraction while carry out number counting and the obtaining of above-mentioned classification information by above-mentioned classification information obtaining section at above-mentioned transport path, the number of the paper of the classification about each above-mentioned classification information determined by each above-mentioned classification box for the extraction object becoming paper;
Detailed survey process instruction unit, above-mentioned present situation storage number is shown as undetermined above-mentioned classification box to above-mentioned second display mode by it, indicates above-mentioned detailed survey handling part to perform above-mentioned detailed survey process.
5. bill handling device according to claim 4, is characterized in that,
When the paper causing above-mentioned special event being received in above-mentioned non-classification box by above-mentioned division, above-mentioned detailed survey process instruction unit, for the above-mentioned classification box generation of above-mentioned special event being detected by above-mentioned special event detection portion, suppresses the instruction of the above-mentioned detailed survey process of execution to above-mentioned detailed survey handling part.
Illustrate or state (amendment according to treaty the 19th article)
Claim 1: the content of the item recorded in the description when adding application is modified.This correction is based on the record of 0032 ~ 0033 paragraph of instructions during application.
Claim 2: the content of the item recorded in the description when adding application is modified.This amendment is based on the record of 0028 paragraph of instructions during application.
Claim 3: the content of the item recorded in the description when adding application is modified.This amendment is based on the record of 0039 ~ 0043 paragraph of instructions during application.

Claims (5)

1. a bill handling device, it processes the paper of multiple classification, it is characterized in that,
Possess:
Multiple classification box, it carries out preparation to receive paper according to each classification of above-mentioned paper, and accepts the extraction of the paper of this storage;
Relevant transport path is carried in the extraction of the paper carried to the storage of each above-mentioned classification box with paper and extract out from each above-mentioned classification box;
Classification information obtaining section, it counts the number of the paper carried in above-mentioned transport path, while obtain the classification information determining paper classification according to the paper of this conveying;
Special event detection portion, it detects the situation occurred determination of the paper storage number of above-mentioned classification box being brought to the special event of interference for each above-mentioned classification box;
Box management department, the counting number of its paper obtained according to above-mentioned classification information obtaining section, the present situation storage number of the paper before the above-mentioned special event of each above-mentioned classification box management is occurred; And
Display part, it shows the storage situation of the paper of above-mentioned classification box to each classification box,
This display part distinguishes use first display mode and the second display mode, above-mentioned storage situation is shown to each classification box, first display mode is about owing to not there is above-mentioned special event, the display mode of the fixed box of above-mentioned present situation storage number of each above-mentioned box, second display mode is about owing to there occurs above-mentioned special event, the display mode of the undetermined box of above-mentioned present situation storage number of each above-mentioned box.
2. bill handling device according to claim 1, is characterized in that,
Above-mentioned present situation storage number is included in above-mentioned storage situation and shows by above-mentioned display part.
3. bill handling device according to claim 1 and 2, is characterized in that,
Possess:
Non-classification box, it prepares respectively with above-mentioned classification box, can receive the paper causing above-mentioned special event via above-mentioned transport path;
Division, the paper causing above-mentioned special event is sorted in above-mentioned non-classification box via above-mentioned transport path and receives by it,
Above-mentioned box management department is when being accommodated in the paper causing above-mentioned special event in above-mentioned non-classification box by above-mentioned division, undertaken counting or estimate the storage number obtained to above-mentioned non-classification box by the storage number of the above-mentioned non-classification box of above-mentioned classification information obtaining section subtend, number is received as above-mentioned present situation using receiving the storage number obtained after number deducts this storage number from above-mentioned present situation, each above-mentioned classification box is managed
Above-mentioned display part distinguishes above-mentioned second display mode about the undetermined box of above-mentioned present situation storage number by situation about being counted by the storage number of the above-mentioned non-classification box of above-mentioned classification information obtaining section subtend and the situation having estimated above-mentioned storage number, shows above-mentioned storage situation to each classification box.
4. the bill handling device according to any one of claims 1 to 3, is characterized in that,
Possess:
Detailed survey handling part, it performs detailed survey process, namely paper is extracted out from above-mentioned classification box, while carry the paper of this extraction while carry out number counting and the obtaining of above-mentioned classification information by above-mentioned classification information obtaining section at above-mentioned transport path, the number of the paper of the classification about each above-mentioned classification information determined by each above-mentioned classification box for the extraction object becoming paper;
Detailed survey process instruction unit, above-mentioned present situation storage number is shown as undetermined above-mentioned classification box to above-mentioned second display mode by it, indicates above-mentioned detailed survey handling part to perform above-mentioned detailed survey process.
5. bill handling device according to claim 4, is characterized in that,
When the paper causing above-mentioned special event being received in above-mentioned non-classification box by above-mentioned division, above-mentioned detailed survey process instruction unit, for the above-mentioned classification box generation of above-mentioned special event being detected by above-mentioned special event detection portion, suppresses the instruction of the above-mentioned detailed survey process of execution to above-mentioned detailed survey handling part.
CN201280072321.1A 2012-04-10 2012-04-10 Bill handling device Expired - Fee Related CN104221063B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2012/002480 WO2013153572A1 (en) 2012-04-10 2012-04-10 Paper sheet processing device

Publications (2)

Publication Number Publication Date
CN104221063A true CN104221063A (en) 2014-12-17
CN104221063B CN104221063B (en) 2017-08-25

Family

ID=49327188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201280072321.1A Expired - Fee Related CN104221063B (en) 2012-04-10 2012-04-10 Bill handling device

Country Status (4)

Country Link
JP (1) JP5844885B2 (en)
CN (1) CN104221063B (en)
IN (1) IN2014MN02222A (en)
WO (1) WO2013153572A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105303685A (en) * 2015-11-10 2016-02-03 昆山古鳌电子机械有限公司 Paper processing device with prompting function
TWI738850B (en) * 2016-09-16 2021-09-11 日商富士電機股份有限公司 Paper money processing device

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104867227B (en) * 2014-02-25 2017-09-15 日立金融设备系统(深圳)有限公司 The method of counting of self-service device and self-service device remaining sum
WO2015182729A1 (en) * 2014-05-30 2015-12-03 日立オムロンターミナルソリューションズ株式会社 Automatic transaction device and method for managing state thereof
JP2016048481A (en) * 2014-08-27 2016-04-07 グローリー株式会社 Paper sheet processing device
CN105989664A (en) * 2015-02-12 2016-10-05 日立金融设备系统(深圳)有限公司 Self-service device and counting method thereof
JP6346113B2 (en) * 2015-03-20 2018-06-20 富士通フロンテック株式会社 Automatic transaction equipment
JP2017102495A (en) * 2015-11-30 2017-06-08 日立オムロンターミナルソリューションズ株式会社 Transaction processing system and transaction processing apparatus
JP6997606B2 (en) * 2017-12-05 2022-01-17 グローリー株式会社 Paper leaf processing equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09223261A (en) * 1996-02-19 1997-08-26 Fujitsu Ltd Money receiving and paying processor and balance counter correction method in money receiving and paying processor
JP2007156710A (en) * 2005-12-02 2007-06-21 Oki Electric Ind Co Ltd Money reception/payment management device and system
CN101425196A (en) * 2007-10-31 2009-05-06 黄金富 Bank note transporting box for verifying carrier identity by finger print
CN101872506A (en) * 2009-04-27 2010-10-27 日立欧姆龙金融系统有限公司 Paper money processing device
CN101887614A (en) * 2009-05-15 2010-11-17 冲电气工业株式会社 Cash handling apparatus
CN101923743A (en) * 2009-03-25 2010-12-22 光荣株式会社 Currency processing apparatus and distribution method thereof
CN102222385A (en) * 2011-07-28 2011-10-19 南通远控自动化技术有限公司 Collection box

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5528019B2 (en) * 2009-07-09 2014-06-25 日立オムロンターミナルソリューションズ株式会社 Scrutiny system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09223261A (en) * 1996-02-19 1997-08-26 Fujitsu Ltd Money receiving and paying processor and balance counter correction method in money receiving and paying processor
JP2007156710A (en) * 2005-12-02 2007-06-21 Oki Electric Ind Co Ltd Money reception/payment management device and system
CN101425196A (en) * 2007-10-31 2009-05-06 黄金富 Bank note transporting box for verifying carrier identity by finger print
CN101923743A (en) * 2009-03-25 2010-12-22 光荣株式会社 Currency processing apparatus and distribution method thereof
CN101872506A (en) * 2009-04-27 2010-10-27 日立欧姆龙金融系统有限公司 Paper money processing device
CN101887614A (en) * 2009-05-15 2010-11-17 冲电气工业株式会社 Cash handling apparatus
CN102222385A (en) * 2011-07-28 2011-10-19 南通远控自动化技术有限公司 Collection box

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105303685A (en) * 2015-11-10 2016-02-03 昆山古鳌电子机械有限公司 Paper processing device with prompting function
TWI738850B (en) * 2016-09-16 2021-09-11 日商富士電機股份有限公司 Paper money processing device

Also Published As

Publication number Publication date
CN104221063B (en) 2017-08-25
JPWO2013153572A1 (en) 2015-12-17
IN2014MN02222A (en) 2015-07-17
JP5844885B2 (en) 2016-01-20
WO2013153572A1 (en) 2013-10-17

Similar Documents

Publication Publication Date Title
CN104221063A (en) Paper sheet processing device
CN101908242B (en) Papers treatment device
JP5680893B2 (en) Banknote transaction processing device
CN101894413B (en) Automatic transaction apparatus
JP2010108197A (en) Automatic transaction device
JP2009295132A (en) Automatic transaction device
JP2011059744A (en) Automatic cash transaction device
RU2650744C2 (en) Paper sheet control apparatus, paper sheet processing system and paper sheet control method
JP5480040B2 (en) Automatic transaction equipment
KR20120012116A (en) An ATM with deposit amount correction function and the service method of using the same
JP6006165B2 (en) Transaction processing apparatus and method for controlling transaction processing apparatus
JP2008052486A (en) Automatic transaction apparatus
KR101011873B1 (en) Bill Recycling Machine
JP5176357B2 (en) Cash deposit / withdrawal system and cash deposit / withdrawal apparatus used therefor
JP6844129B2 (en) Cash processing device
CN104821035B (en) Automated teller machine, state management method, and management system
JP5018108B2 (en) Cash deposit and withdrawal device
JP6452976B2 (en) Cash processing equipment
WO2013153573A1 (en) Paper sheet processing device
JP2018081385A (en) Cash processing apparatus
JP2010086441A (en) Paper sheet conveying electronic equipment and cash automatic transaction device
JP5115166B2 (en) Cash deposit and withdrawal device
JP7435133B2 (en) cash handling equipment
JP6277747B2 (en) Deposit / withdrawal device and deposit / withdrawal program
JP6208007B2 (en) Cash deposit / withdrawal machine, sales collection method, and program

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170825

Termination date: 20200410