[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN104156050A - Task monitoring method and electronic device - Google Patents

Task monitoring method and electronic device Download PDF

Info

Publication number
CN104156050A
CN104156050A CN201410406067.5A CN201410406067A CN104156050A CN 104156050 A CN104156050 A CN 104156050A CN 201410406067 A CN201410406067 A CN 201410406067A CN 104156050 A CN104156050 A CN 104156050A
Authority
CN
China
Prior art keywords
task
electronic equipment
dump energy
complete
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410406067.5A
Other languages
Chinese (zh)
Other versions
CN104156050B (en
Inventor
苏寅
张渊毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lenovo Beijing Ltd
Original Assignee
Lenovo Beijing Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lenovo Beijing Ltd filed Critical Lenovo Beijing Ltd
Priority to CN201410406067.5A priority Critical patent/CN104156050B/en
Publication of CN104156050A publication Critical patent/CN104156050A/en
Application granted granted Critical
Publication of CN104156050B publication Critical patent/CN104156050B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Debugging And Monitoring (AREA)
  • Power Sources (AREA)

Abstract

The embodiment of the invention provides a task monitoring method and an electronic device. The method includes the steps that a set command is acquired, wherein the set command comprises a first time parameter; a response to the set command is made and a first task is set according to the first time parameter; according to the first time parameter, a monitoring period is determined; in the monitoring period, dump energy of the electronic device and at least one second task before the first task is executed are monitored; according to a control strategy corresponding to the dump energy, responses to the second tasks are made, and therefore the first task set by the electronic device according to the set command can be completely executed. When the dump energy of the electronic device is low, power consumption of the task set for a user and other tasks are monitored, the condition that dump energy of the electronic device is insufficient, so that the set task for the user can not be finished and is interrupted beyond expectation of the user can be avoided, and user experience is improved.

Description

The method of Mission Monitor and electronic equipment
Technical field
The embodiment of the present invention relates to task management field, and more specifically, relates to method and the electronic equipment of Mission Monitor.
Background technology
On the electronic equipments such as mobile phone, panel computer, some are operated task such as call, video recording, recording, countdown, alarm clock, recovery system of triggering etc. by user, need electronic equipment to have enough electric weight to support completing of these tasks.
Yet, the increase to electronic equipment viscosity along with electronic apparatus application quantity and people, and the increasing of electronic equipment running background program, battery power consumption speed is also increasing.Can user, when using electronic equipment, often can run into owing to not supported set task to carry out anticipation for dump energy, or the electric weight causing according to the deviation of current information anticipation is not enough and cannot complete the situation of set task.For example, call, recording or system are recovered to proceed to a half and are shut down suddenly; Electric weight exhausts and causes quarter-bell or countdown inefficacy etc.And this tasks interrupt situation outside user expection can seriously have influence on people's information communication, work efficiency, living arrangement etc., even have influence on the normal use of mobile terminal.
The electric weight of current mobile device adopts display mode graphical or that quantize, and the dump energy showing is not often real surplus electric weight, and can this can make user due to the deficiency of experience, to dump energy, support the anticipation of set task to produce deviation.
Therefore, depart from the electric weight display mode of specific tasks, can make user when setting some task, ignore the set task of anticipation whether supported to(for) dump energy.Thereby cause the interruption of set task outside user's expection, affect the experience of user on electronic equipment.
Summary of the invention
The embodiment of the present invention provides a kind of method and electronic equipment of Mission Monitor, can avoid electronic equipment dump energy to be not enough to the task that completing user is set, and the situation that causes task to expect outer interruption user.
First aspect, a kind of Mission Monitor method is provided, and described method is applied in electronic equipment, and described method comprises: obtain and set instruction, described setting instruction comprises very first time parameter, and described setting instruction is used to indicate described electronic equipment according to described very first time setting parameter first task; Respond described setting instruction, according to first task described in described very first time setting parameter; According to described very first time parameter, determine storage and monitoring time segment; In described storage and monitoring time segment, monitor the dump energy of described electronic equipment and described first task at least one second task before complete; According to control strategy response described at least one second task corresponding with described dump energy, so that the described first task that described electronic equipment is set according to described setting instruction can be complete.
In conjunction with first aspect, in its first implementation, described at least one second task of control strategy response that described basis is corresponding with described dump energy, comprise: when the dump energy of described electronic equipment is less than predetermined threshold value, adopts low-power consumption mode to respond and process described at least one second task; Or when the dump energy of described electronic equipment is greater than predetermined threshold value, adopt normal power consumption mode to respond and process described at least one second task, when the dump energy of described electronic equipment being detected and be less than described predetermined threshold value, conversion low-power consumption mode respond and process described at least one second task.
In conjunction with first aspect and above-mentioned implementation thereof, in the second implementation of first aspect, described according to described very first time parameter, determine storage and monitoring time segment after, also comprise: the dump energy of determining described electronic equipment, and determine when described storage and monitoring time segment finishes the electric weight that complete described first task needs; When the dump energy of described electronic equipment is not enough to support the complete described first task of described electronic equipment, prompting user described in first task cannot complete.
In conjunction with first aspect and above-mentioned implementation thereof, in the third implementation of first aspect, at least one second task before the described dump energy of monitoring described electronic equipment in described storage and monitoring time segment and described first task are complete, comprise: in described storage and monitoring time segment, at least one in the process of carrying out described at least one the second task constantly, determined the dump energy of described electronic equipment; When the dump energy of described electronic equipment is not enough to support the complete described first task of described electronic equipment, prompting user described in first task cannot complete.
In conjunction with first aspect and above-mentioned implementation thereof, in the 4th kind of implementation of first aspect, when carrying out described first task, described at least one second task comprises described first task, at least one second task before the described dump energy of monitoring described electronic equipment in described storage and monitoring time segment and described first task are complete, comprising: dump energy and the described first task of in described storage and monitoring time segment, monitoring described electronic equipment.
Second aspect, provides a kind of electronic equipment, comprising: acquiring unit, and for obtaining setting instruction, described setting instruction comprises very first time parameter, described setting instruction is used to indicate described electronic equipment according to described very first time setting parameter first task; Response unit, for responding described setting instruction, according to first task described in described very first time setting parameter; Determining unit, for determining storage and monitoring time segment according to described very first time parameter; Monitoring unit, for monitoring the dump energy of described electronic equipment and described first task at least one second task before complete in described storage and monitoring time segment; Described response unit, according to control strategy response described at least one second task corresponding with described dump energy, so that the described first task that described electronic equipment is set according to described setting instruction can be complete.
In conjunction with second aspect, in the first implementation of second aspect, described response unit specifically for: when the dump energy of described electronic equipment is less than predetermined threshold value, adopt low-power consumption mode respond and process described at least one second task; Or when the dump energy of described electronic equipment is greater than predetermined threshold value, adopt normal power consumption mode to respond and process described at least one second task, when the dump energy of described electronic equipment being detected and be less than described predetermined threshold value, conversion low-power consumption mode respond and process described at least one second task.
In conjunction with second aspect and above-mentioned implementation thereof, in the second implementation of second aspect, described electronic equipment also comprises display unit, described determining unit is also for the dump energy of determining described electronic equipment, and determine when described storage and monitoring time segment finishes the electric weight that complete described first task needs; When the dump energy of described electronic equipment is not enough to support the complete described first task of described electronic equipment, by first task described in described display unit prompting user, cannot complete.
In conjunction with second aspect and above-mentioned implementation thereof, in the third implementation of second aspect, in described storage and monitoring time segment, at least one in the process of carrying out described at least one the second task constantly, determined the dump energy of described electronic equipment; When the dump energy of described electronic equipment is not enough to support the complete described first task of described electronic equipment, by first task described in described display unit prompting user, cannot complete.
In conjunction with second aspect and above-mentioned implementation thereof, in the 4th kind of implementation of second aspect, when described electronic equipment is carried out described first task, described at least one second task comprises described first task, and described monitoring unit is specifically for dump energy and the described first task of monitoring described electronic equipment in described storage and monitoring time segment.
The embodiment of the present invention is by when electronic equipment dump energy is lower, the task that user is set, and the power consumption of other tasks detects and management and control, thereby can avoid electronic equipment dump energy to be not enough to the task that completing user is set, and the situation that causes task to expect outer interruption user improves user and experiences.
Accompanying drawing explanation
Fig. 1 is the process flow diagram of the Mission Monitor method of one embodiment of the invention.
Fig. 2 is the process flow diagram of the Mission Monitor method of one embodiment of the invention.
Fig. 3 is the schematic diagram that presents anticipation execution result of one embodiment of the invention.
Fig. 4 is the schematic block diagram of the electronic equipment of one embodiment of the invention.
Fig. 5 is the schematic block diagram of the electronic equipment of another embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is a part of embodiment of the present invention, rather than whole embodiment.Embodiment based in the present invention, the every other embodiment that those of ordinary skills obtain under the prerequisite of not making creative work, should belong to the scope of protection of the invention.
Electronic equipment (Electronic Equipment), can comprise terminal device (Terminal Equipment) mobile terminal (Mobile Terminal), subscriber equipment (UE, User Equipment), mobile subscriber equipment etc., can be through wireless access network (for example, RAN, Radio Access Network) communicate with mobile network, also can pass through access point (Access Point, AP) accessing WLAN (Wireless Local Area Network, WLAN), certainly, can be also the stand-alone device that does not access any network.Electronic equipment can be mobile terminal, as mobile phone (or being called " honeycomb " phone) with have the computing machine of mobile terminal, for example, can be portable, pocket, hand-held, mobile device built-in computer or vehicle-mounted etc.
Fig. 1 is the process flow diagram of the Mission Monitor method of one embodiment of the invention.The method of Fig. 1 is carried out by the mobile terminal with processor, storer, display.
101, obtain and set instruction, set instruction and comprise very first time parameter, set instruction and be used to indicate electronic equipment according to very first time setting parameter first task.
102, instruction is set in response, according to very first time setting parameter first task.
103, according to very first time parameter, determine storage and monitoring time segment.
104, in storage and monitoring time segment, monitor the dump energy of electronic equipment and first task at least one second task before complete.
105, according to the control strategy corresponding with dump energy, respond at least one second task, so that electronic equipment can be complete according to the first task of setting instruction setting.
The embodiment of the present invention is by when electronic equipment dump energy is lower, the first task that user is set and the power consumption of other tasks detect and management and control, thereby can avoid electronic equipment dump energy to be not enough to the first task that completing user is set, and cause task to expect and improve the situation that outer interruption maybe cannot complete user and experience user.
First, electronic equipment detects the operation from user, and this operation triggers sets instruction, and electronic equipment obtains after this setting instruction, according to this instruction, sets first task.Particularly, first task can be such as call, video recording, recording, countdown, alarm clock, recovery system etc.User's operation of setting first task can be that user enters the operation interface of this first task or sets interface, and for example, for call task, user's operation can be to click for opening the button of dialing interface; For alarm clock, user operation can be the sound operation of time of setting alarm clock.
Alternatively, above task can be divided into carrying out after the task of at once carrying out after user sets and Preset Time of task, for example at once carrying out of task can comprise call, video recording, recording etc., and carrying out after Preset Time of task can comprise quarter-bell, default system upgrade task, default recording task etc.Should be understood that some task both can be after setting carries out at once, also can after the time, carry out at user preset.
Different according to setting of task, corresponding very first time parameter is also different.Particularly, very first time parameter can comprise: the time that the first task of setting starts, the duration of first task etc.For example, according to user's operation, can set the quarter-bell of 6 the next morning, this quarter-bell sounds and continues 1 minute, again for example, can set 2 hours and to someone, call afterwards, and this call continues 3 minutes.Should be understood that the start time that also can only set first task, or only set the duration of first task.
Electronic equipment is set after first task according to setting instruction, can also determine the monitoring period according to setting the very first time parameter comprising in instruction.Particularly, can by set first task time be carved into the complete moment of first task and be defined as monitoring the period.Wherein the complete moment of first task can be determined according to very first time parameter.For example, current time is 22:00, sets the quarter-bell of 6 the next morning, and this quarter-bell continues 1 minute, monitors so the period can be defined as 22:00 to 6:01 the next morning.Again for example, set first task, for call 5 minutes, is monitored the time period that the period can be defined as starting to dial in to end of conversation so.
Alternatively, as an embodiment, according to the control strategy corresponding with dump energy, respond at least one second task, comprising: when the dump energy of electronic equipment is less than predetermined threshold value, adopt low-power consumption mode to respond and process at least one second task; Or when the dump energy of electronic equipment is greater than predetermined threshold value, adopt normal power consumption mode to respond and process at least one second task, when the dump energy of electronic equipment being detected and be less than predetermined threshold value, conversion low-power consumption mode responds and processes at least one second task.
Within the monitoring period, electronic equipment can real-time monitoring equipment current residual electric weight, and at least one second task of current execution, and according to the power consumption of control strategy control execution second task corresponding with dump energy, so that electronic equipment can complete set first task.Should be understood that except the real-time monitoring to the dump energy of electronic equipment and the second task, also can, in any one or more moment of monitoring in the period, the dump energy of electronic equipment and the second task be monitored.
Particularly, the corresponding relation of dump energy and control strategy can preset, and control strategy changes along with the variation of dump energy.For example, when the dump energy that electronic equipment detected is lower than 30% time, response the second task, adopts low-power consumption mode to carry out or move to the second task.That is to say, before second task of execution, determine and need to adopt low-power consumption mode to carry out or move the second task.
Again for example, the dump energy that electronic equipment detected is 40%, is greater than default 30% threshold value, adopt normal power consumption mode to carry out or operation the second task, when dump energy is reduced to 30%, the second task, remain unfulfilled execution, the low-power consumption mode of converting responds and processes the second task.
As a concrete example, when user has set first task, the dump energy of electronic equipment is lower than 30%, user triggers the second task during this time, such as displaying video, running game etc., electronic equipment can be by reducing the resolution of displaying video, screen intensity, and the modes such as FR reduce the power consumption speed of the second task.
In addition, predetermined threshold value can also be in the dump energy for electronic equipment, to exclude the electric weight that can support first task estimated and predefined.Wherein, electronic equipment is estimated for the electric weight that can support first task can be based on completing the required basic electric weight of this first task, do not carry out the power consumption of other tasks, for example maintain the basic electric weight of electronic equipment standby, should understand, the setting of this threshold value can be a little more than above-mentioned basic electric weight, to reserve certain electric weight more than needed.As a concrete example, when user has set first task, the dump energy of electronic equipment is 30%, it is 10% that electronic equipment has been estimated the required basic electric weight of first task, in the dump energy of electronic equipment, excluding the electric weight more than needed completing after the required basic electric weight of first task of estimating is 20%, for example, when electronic equipment detects this electric weight more than needed and is reduced to predetermined threshold value (10%), can be by reducing the resolution of displaying video, screen intensity, the modes such as FR reduce the power consumption speed of the second task.
Alternatively, as an embodiment, after determining storage and monitoring time segment according to very first time parameter, also comprise: determine the dump energy of electronic equipment, and determine when storage and monitoring time segment finishes, the electric weight that complete first task needs; When the dump energy of electronic equipment is not enough to support the complete first task of electronic equipment, prompting user first task cannot complete.
Electronic equipment is after user has set first task, in time period before completing to first task, the dump energy of detected electrons equipment in real time, when having determined that electric weight that first task needs is lower than dump energy, electronic equipment can present information, with reminding user current residual electric weight, be not enough to first task, further reminding user charges to guarantee that first task can normally move or complete.
Alternatively, as an embodiment, in storage and monitoring time segment, monitor the dump energy of electronic equipment and first task at least one second task before complete, comprise: in storage and monitoring time segment, at least one in the process of carrying out at least one the second task constantly, determined the dump energy of electronic equipment; When the dump energy of electronic equipment is not enough to support the complete first task of electronic equipment, prompting user first task cannot complete.
Particularly, in the process of the second tasks carrying, the second task power consumption declines the dump energy of electronic equipment more quickly, when dump energy drops to while being not enough to support that first task is complete, electronic equipment can present information, with reminding user current residual electric weight, be not enough to first task, further reminding user charges to guarantee that first task can normally move or complete.
In addition,, when user operates the interface of triggering setting first task, whether the current residual electric weight that can estimate electronic equipment can complete first task, and estimation results is presented.For example, when user opens dialing interface, electronic equipment can be determined the supported air time of dump energy according to the power consumption speed of current residual electric weight and call, and the air time that this is estimated is presented to user.Again for example, when user's setting alarm clock sounds the time, electronic equipment can detect current residual electric weight, and estimating the alarm clock time of sounding that current time sets to user maintains the required electric weight of the normal operation of electronic equipment, determine whether current residual electric weight can support that alarm clock sounds on time, if estimated, can sound, can point out or not point out user this result, if estimating quarter-bell when the time comes cannot sound, can point out user, and further reminding user charges so that dump energy supports that quarter-bell sounds on time.Similarly, if first task for can be by completing program and showing of task, electronic equipment can be estimated the ratio that current residual electric weight can support that first task completes, and user is pointed out.
Should understand, the mode of estimating of first task completeness and presentation mode need to mate with the particular type of first task, yet first task can have a lot of types, the embodiment of the present invention is not limited to above-described embodiment estimating and presentation mode for first task completeness.
Alternatively, as an embodiment, when carrying out first task, at least one second task comprises first task, in storage and monitoring time segment, monitor the dump energy of electronic equipment and first task at least one second task before complete, comprising: dump energy and the first task of in storage and monitoring time segment, monitoring electronic equipment.
That is to say, the goal task of first task for setting according to setting instruction, the second task is after first task is set, and to interior performed task of complete period of first task, within this period, may have a plurality of the second tasks carryings.When first task is performed, first task can be equal at least one second task, and at least one second task comprises first task.
Give a concrete illustration, setting first task is to call 5 minutes afterwards for 3 hours, triggering in the middle of this 3 hours 05 minutes processes/carrying out of task is the second task, because first task is called also and must carried out in 3 hours 05 minutes, so first task can wait second task that is all when carrying out.And the in the situation that of not having other tasks to be triggered/to carry out in 3 hours 05 minutes, calling of task is the second unique task.
Because first task can wait and be all the second task when carrying out, first task is monitored too in storage and monitoring time segment, specifically can, with reference to the method for supervising of above-mentioned the second task, repeat no more herein.
The embodiment of the present invention is by when electronic equipment dump energy is lower, the task that user is set, and the power consumption of other tasks detects and management and control, thereby can avoid electronic equipment dump energy to be not enough to the task that completing user is set, and the situation that causes task to expect outer interruption user improves user and experiences.
Fig. 2 is the process flow diagram of the Mission Monitor method of one embodiment of the invention.
201, detect the operation that user sets first task.
First, electronic equipment detect from user for setting the operation of first task, particularly, first task can be the continuation task that users such as call, video recording, recording, countdown, alarm clock, recovery system can trigger.For setting user's operation of first task, can be that user enters the operation interface of this first task or sets interface, for example, for call task, user's operation can be to click for opening the button of dialing interface, presents the dialing interface as shown in (1) in Fig. 3; For alarm clock, user operation can be the sound operation of time of setting alarm clock, and the quarter-bell as shown in (3) in Fig. 3 is set interface.
202, determine the anticipation execution result of first task.
As an optional step, when user operates the interface of triggering setting first task, whether the current residual electric weight that can estimate electronic equipment can complete first task, and this anticipation execution result can comprise that first task can complete, first task cannot complete, the completed percentage of first task is, operating time of first task etc.Particularly, electronic equipment can detect current residual electric weight, and has estimated the required electric weight of first task, thereby determines whether current residual electric weight can support completing of first task.For example, when user opens dialing interface, electronic equipment can be determined the supported air time of dump energy according to the power consumption speed of current residual electric weight and call.Again for example, when user's setting alarm clock sounds the time, electronic equipment can detect current residual electric weight, and estimates the alarm clock time of sounding that current time sets to user and maintain the required electric weight of the normal operation of electronic equipment, determines whether current residual electric weight can support that alarm clock sounds on time.
203, present anticipation execution result.
Anticipation execution result determining first task, can present this anticipation execution result, to point out user's first task whether can complete, or the time that first task can be lasting etc.Particularly, as an example, first task is quarter-bell, if estimating quarter-bell when the time comes, electronic equipment cannot sound, can point out user, and further reminding user charges so that dump energy supports that quarter-bell sounds on time, as shown in (3) in Fig. 3.As another example, first task is dialing, and electronic equipment can be presented to the air time of estimating user, as shown in (1) in Fig. 3.For example first task is system upgrade again, if electronic equipment is estimated upgrading, cannot complete, and can point out user, and as shown in (2) in Fig. 3, and further reminding user charges.
Should understand, the mode of estimating of first task completeness and presentation mode need to mate with the particular type of first task, yet first task can have a lot of types, the embodiment of the present invention is not limited to above-described embodiment estimating and presentation mode for first task completeness.In addition, should also be understood that shown in Fig. 3 to be only several way of example that present and remind, the mode of prompting and the position presenting are not limited to the example in Fig. 3.
204, monitoring in real time
Electronic equipment is after user has set first task, in time period before completing to first task, the dump energy of detected electrons equipment in real time, and the power consumption of the second task during this period of time happening suddenly, and control the power consumption that reduces the second task, so that electronic equipment can complete set first task.Should be understood that except the real-time monitoring to the power consumption of the dump energy of electronic equipment and the second task, any one or more moment that also can be within the above-mentioned time period are to monitoring the power consumption of the dump energy of electronic equipment and the second task.
205, battery saving mode is carried out the second task
When the dump energy of electronic equipment is less than predetermined threshold value, adopt battery saving mode to carry out at least one second task.Particularly, predetermined threshold value can be for the dump energy of electronic equipment and predefined, for example, when the dump energy that electronic equipment detected is lower than 30% time, for the second task the first task of setting except user, adopt battery saving mode to carry out or move.As a concrete example, when user has set first task, the dump energy of electronic equipment is 40%, user triggers the second task during this time, such as displaying video, running game etc., when dump energy being detected lower than 30% time, electronic equipment can be by reducing the resolution of displaying video, screen intensity, the modes such as FR reduce the power consumption speed of the second task.In addition, predetermined threshold value can also be in the dump energy for electronic equipment, to exclude the electric weight that can support first task estimated and predefined.Wherein, electronic equipment is estimated for the electric weight that can support first task can be based on completing the required basic electric weight of this first task, do not carry out the power consumption of other tasks, for example maintain the basic electric weight of electronic equipment standby, should understand, the setting of this threshold value can be a little more than above-mentioned basic electric weight, to reserve certain electric weight more than needed.As a concrete example, when user has set first task, the dump energy of electronic equipment is 30%, it is 10% that electronic equipment has been estimated the required basic electric weight of first task, in the dump energy of electronic equipment, excluding the electric weight more than needed completing after the required basic electric weight of first task of estimating is 20%, for example, when electronic equipment detects this electric weight more than needed and is reduced to predetermined threshold value (10%), can be by reducing the resolution of displaying video, screen intensity, the modes such as FR reduce the power consumption speed of the second task.
206, reminding user cannot complete first task.
Electronic equipment is after user has set first task, in time period before completing to first task, the dump energy of detected electrons equipment in real time, when having determined that electric weight that first task needs is lower than dump energy, electronic equipment can present information, with reminding user current residual electric weight, be not enough to first task, further reminding user charges to guarantee that first task can normally move or complete.Concrete alerting pattern can, with reference to above-mentioned steps 203, repeat no more herein.
Fig. 4 is the schematic block diagram of the electronic equipment of one embodiment of the invention.Electronic equipment 400 shown in Fig. 4 comprises acquiring unit 401, response unit 402, determining unit 403 and monitoring unit 404.
Acquiring unit 401 obtains sets instruction, sets instruction and comprises very first time parameter, sets instruction and is used to indicate electronic equipment according to very first time setting parameter first task; Instruction is set in response unit 402 responses, according to very first time setting parameter first task; Determining unit 403 is determined storage and monitoring time segment according to very first time parameter; Monitoring unit 404 is monitored the dump energy of electronic equipment and first task at least one second task before complete in storage and monitoring time segment; Response unit 402 responds at least one second task according to the control strategy corresponding with dump energy, so that electronic equipment can be complete according to the first task of setting instruction setting.
The embodiment of the present invention is by electronic equipment 400 dump energies when lower, the task that user is set, and the power consumption of other tasks detects and management and control, thereby can avoid electronic equipment dump energy to be not enough to the task that completing user is set, and the situation that causes task to expect outer interruption user improves user and experiences.
Alternatively, as an embodiment, response unit 402 specifically for: when the dump energy of electronic equipment is less than predetermined threshold value, adopt low-power consumption mode to respond and process at least one second task; Or when the dump energy of electronic equipment is greater than predetermined threshold value, adopt normal power consumption mode to respond and process at least one second task, when the dump energy of electronic equipment being detected and be less than predetermined threshold value, conversion low-power consumption mode responds and processes at least one second task.
Particularly, the corresponding relation of dump energy and control strategy can preset, and control strategy changes along with the variation of dump energy.For example, when the dump energy that electronic equipment detected is lower than 30% time, response the second task, adopts low-power consumption mode to carry out or move to the second task.That is to say, before second task of execution, determine and need to adopt low-power consumption mode to carry out or move the second task.
Again for example, the dump energy that electronic equipment detected is 40%, is greater than default 30% threshold value, adopt normal power consumption mode to carry out or operation the second task, when dump energy is reduced to 30%, the second task, remain unfulfilled execution, the low-power consumption mode of converting responds and processes the second task.
As a concrete example, when user has set first task, the dump energy of electronic equipment is lower than 30%, user triggers the second task during this time, such as displaying video, running game etc., electronic equipment can be by reducing the resolution of displaying video, screen intensity, and the modes such as FR reduce the power consumption speed of the second task.
In addition, predetermined threshold value can also be in the dump energy for electronic equipment, to exclude the electric weight that can support first task estimated and predefined.Wherein, electronic equipment is estimated for the electric weight that can support first task can be based on completing the required basic electric weight of this first task, do not carry out the power consumption of other tasks, for example maintain the basic electric weight of electronic equipment standby, should understand, the setting of this threshold value can be a little more than above-mentioned basic electric weight, to reserve certain electric weight more than needed.As a concrete example, when user has set first task, the dump energy of electronic equipment is 30%, it is 10% that electronic equipment has been estimated the required basic electric weight of first task, in the dump energy of electronic equipment, excluding the electric weight more than needed completing after the required basic electric weight of first task of estimating is 20%, for example, when electronic equipment detects this electric weight more than needed and is reduced to predetermined threshold value (10%), can be by reducing the resolution of displaying video, screen intensity, the modes such as FR reduce the power consumption speed of the second task.
Alternatively, as an embodiment, electronic equipment also comprises display unit 405, determining unit 403 also for: determine the dump energy of electronic equipment, and determine when storage and monitoring time segment finishes, the electric weight that complete first task needs; When the dump energy of electronic equipment is not enough to support the complete first task of electronic equipment, by display unit 405 prompting user first tasks, cannot complete.
Electronic equipment 400 is after user has set first task, in time period before completing to first task, the dump energy of detected electrons equipment 400 in real time, when having determined that electric weight that first task needs is lower than dump energy, electronic equipment 400 can present information by display unit 405, with reminding user current residual electric weight, be not enough to first task, further reminding user charges to guarantee that first task can normally move or complete.
Alternatively, as an embodiment, Power Management Unit 402 also for: electronic equipment also comprises display unit 405, determining unit 403 also for: in storage and monitoring time segment, at least one in the process of carrying out at least one the second task constantly, determined the dump energy of electronic equipment; When the dump energy of electronic equipment is not enough to support the complete first task of electronic equipment, by display unit 405 prompting user first tasks, cannot complete.
Particularly, in the process of the second tasks carrying, the second task power consumption declines the dump energy of electronic equipment more quickly, when dump energy drops to while being not enough to support that first task is complete, electronic equipment can present information, with reminding user current residual electric weight, be not enough to first task, further reminding user charges to guarantee that first task can normally move or complete.
In addition,, when user operates the interface of triggering setting first task, whether the current residual electric weight that can estimate electronic equipment can complete first task, and estimation results is presented.For example, when user opens dialing interface, electronic equipment can be determined the supported air time of dump energy according to the power consumption speed of current residual electric weight and call, and the air time that this is estimated is presented to user by display unit 405.Again for example, when user's setting alarm clock sounds the time, electronic equipment can detect current residual electric weight, and estimating the alarm clock time of sounding that current time sets to user maintains the required electric weight of the normal operation of electronic equipment, determine whether current residual electric weight can support that alarm clock sounds on time, if estimated, can sound, can point out or not point out user this result, if estimating quarter-bell when the time comes cannot sound, can point out users by display unit 405, and further reminding user charges so that dump energy supports that quarter-bell sounds on time.Similarly, if first task for can be by completing program and showing of task, electronic equipment can be estimated the ratio that current residual electric weight can support that first task completes, and points out by 405 couples of users of display unit.
Should understand, the mode of estimating of first task completeness and presentation mode need to mate with the particular type of first task, yet first task can have a lot of types, the embodiment of the present invention is not limited to above-described embodiment estimating and presentation mode for first task completeness.
Alternatively, as an embodiment, when carrying out first task, at least one second task comprises first task, and monitoring unit 404 is specifically for dump energy and the first task of monitoring electronic equipment in storage and monitoring time segment.
That is to say, the goal task of first task for setting according to setting instruction, the second task is after first task is set, and to interior performed task of complete period of first task, within this period, may have a plurality of the second tasks carryings.When first task is performed, first task can be equal at least one second task, and at least one second task comprises first task.
Give a concrete illustration, setting first task is to call 5 minutes afterwards for 3 hours, triggering in the middle of this 3 hours 05 minutes processes/carrying out of task is the second task, because first task is called also and must carried out in 3 hours 05 minutes, so first task can wait second task that is all when carrying out.And the in the situation that of not having other tasks to be triggered/to carry out in 3 hours 05 minutes, calling of task is the second unique task.
Because first task can wait and be all the second task when carrying out, first task is monitored too in storage and monitoring time segment, specifically can, with reference to the method for supervising of above-mentioned the second task, repeat no more herein.
The embodiment of the present invention is by when electronic equipment dump energy is lower, the task that user is set, and the power consumption of other tasks detects and management and control, thereby can avoid electronic equipment dump energy to be not enough to the task that completing user is set, and the situation that causes task to expect outer interruption user improves user and experiences.
Fig. 5 is the schematic block diagram of the electronic equipment of another embodiment of the present invention.The electronic equipment 500 of Fig. 5 comprises processor 51, storer 52, display 53, and processor 51, storer 52 and display 53 are connected by bus system 54.
Storer 52 makes processor 51 carry out the instruction of following operation for storing: obtain and set instruction, set instruction and comprise very first time parameter, set instruction and be used to indicate electronic equipment 500 according to very first time setting parameter first task; Instruction is set in response, according to very first time setting parameter first task; According to very first time parameter, determine storage and monitoring time segment; In storage and monitoring time segment, monitor the dump energy of electronic equipment 500 and first task at least one second task before complete; According to the control strategy corresponding with dump energy, respond at least one second task, so that electronic equipment 500 can be complete according to the first task of setting instruction setting.
The embodiment of the present invention is by when electronic equipment dump energy is lower, the task that user is set, and the power consumption of other tasks detects and management and control, thereby can avoid electronic equipment dump energy to be not enough to the task that completing user is set, and the situation that causes task to expect outer interruption user improves user and experiences.
In addition, electronic equipment 500 can also comprise radiating circuit 55, receiving circuit 56 and antenna 57 etc.Processor 51 is controlled the operation of electronic equipment 500, and processor 51 can also be called CPU (Central Processing Unit, CPU (central processing unit)).Storer 52 can comprise ROM (read-only memory) and random access memory, and provides instruction and data to processor 51.A part for storer 52 can also comprise nonvolatile RAM (NVRAM).In concrete application, radiating circuit 55 and receiving circuit 56 can be coupled to antenna 57.Each assembly of electronic equipment 500 is coupled by bus system 54, and wherein bus system 54, except comprising data bus, can also comprise power bus, control bus and status signal bus in addition etc.But for the purpose of clearly demonstrating, in the drawings various buses are all designated as to bus system 54.
The method that the invention described above embodiment discloses can be applied in processor 51, or is realized by processor 51.Processor 51 may be a kind of integrated circuit (IC) chip, has the processing power of signal.In implementation procedure, each step of said method can complete by the integrated logic circuit of the hardware in processor 51 or the instruction of form of software.Above-mentioned processor 51 can be general processor, digital signal processor (DSP), special IC (ASIC), ready-made programmable gate array (FPGA) or other programmable logic device (PLD), discrete gate or transistor logic device, discrete hardware components.Can realize or carry out disclosed each method, step and logic diagram in the embodiment of the present invention.General processor can be that microprocessor or this processor can be also the processors of any routine etc.Step in conjunction with the disclosed method of the embodiment of the present invention can directly be presented as that hardware decoding processor is complete, or complete with the hardware in decoding processor and software module combination.Software module can be positioned at random access memory, and flash memory, ROM (read-only memory), in the storage medium of this area maturations such as programmable read only memory or electrically erasable programmable storer, register.This storage medium is positioned at storer 52, and the information in processor 51 read memories 52 completes the step of said method in conjunction with its hardware.
Alternatively, as an embodiment, processor 51 specifically for: when the dump energy of electronic equipment is less than predetermined threshold value, adopt low-power consumption mode to respond and process at least one second task; Or when the dump energy of electronic equipment is greater than predetermined threshold value, adopt normal power consumption mode to respond and process at least one second task, when the dump energy of electronic equipment being detected and be less than predetermined threshold value, conversion low-power consumption mode responds and processes at least one second task.
Alternatively, as an embodiment, processor 51 also for: determine the dump energy of electronic equipment, and determine when storage and monitoring time segment finishes, the electric weight that complete first task needs; When the dump energy of electronic equipment is not enough to support the complete first task of electronic equipment, prompting user first task cannot complete.
Alternatively, as an embodiment, processor 51 also for: in storage and monitoring time segment, monitor the dump energy of electronic equipment and first task at least one second task before complete, comprise: in storage and monitoring time segment, at least one in the process of carrying out at least one the second task constantly, determined the dump energy of electronic equipment; When the dump energy of electronic equipment is not enough to support the complete first task of electronic equipment, prompting user first task cannot complete.
Alternatively, as an embodiment, when carrying out first task, at least one second task comprises first task, and processor 51 is specifically for dump energy and the first task of monitoring electronic equipment in storage and monitoring time segment.
Should be understood that processor 51 can carry out task management and power management, can carry out the function of the response unit 402 shown in above-mentioned Fig. 4, determining unit 403 and monitoring unit 404.And can carry out the method in above-mentioned Fig. 1.
The embodiment of the present invention is by when electronic equipment dump energy is lower, the task that user is set, and the power consumption of other tasks detects and management and control, thereby can avoid electronic equipment dump energy to be not enough to the task that completing user is set, and the situation that causes task to expect outer interruption user improves user and experiences.
Should understand, in various embodiment of the present invention, the size of the sequence number of above-mentioned each process does not also mean that the priority of execution sequence, and the execution sequence of each process should determine with its function and internal logic, and should not form any restriction to the implementation process of the embodiment of the present invention.
Those of ordinary skills can recognize, unit and the algorithm steps of each example of describing in conjunction with embodiment disclosed herein, can realize with the combination of electronic hardware or computer software and electronic hardware.These functions are carried out with hardware or software mode actually, depend on application-specific and the design constraint of technical scheme.Professional and technical personnel can specifically should be used for realizing described function with distinct methods to each, but this realization should not thought and exceeds scope of the present invention.
Those skilled in the art can be well understood to, and for convenience and simplicity of description, the specific works process of the system of foregoing description, device and unit, can, with reference to the corresponding process in preceding method embodiment, not repeat them here.
In the several embodiment that provide in the application, should be understood that disclosed system, apparatus and method can realize by another way.For example, device embodiment described above is only schematic, for example, the division of described unit, be only that a kind of logic function is divided, during actual realization, can have other dividing mode, for example a plurality of unit or assembly can in conjunction with or can be integrated into another system, or some features can ignore, or do not carry out.Another point, shown or discussed coupling each other or direct-coupling or communication connection can be by some interfaces, indirect coupling or the communication connection of device or unit can be electrically, machinery or other form.
The described unit as separating component explanation can or can not be also physically to separate, and the parts that show as unit can be or can not be also physical locations, can be positioned at a place, or also can be distributed in a plurality of network element.Can select according to the actual needs some or all of unit wherein to realize the object of the present embodiment scheme.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, can be also that the independent physics of unit exists, and also can be integrated in a unit two or more unit.
If described function usings that the form of SFU software functional unit realizes and during as production marketing independently or use, can be stored in a computer read/write memory medium.Understanding based on such, the part that technical scheme of the present invention contributes to prior art in essence in other words or the part of this technical scheme can embody with the form of software product, this computer software product is stored in a storage medium, comprise that some instructions are with so that a computer equipment (can be personal computer, server, or the network equipment etc.) carry out all or part of step of method described in each embodiment of the present invention.And aforesaid storage medium comprises: USB flash disk, portable hard drive, ROM (read-only memory) (ROM, Read-Only Memory), the various media that can be program code stored such as random access memory (RAM, Random Access Memory), magnetic disc or CD.
The above; be only the specific embodiment of the present invention, but protection scope of the present invention is not limited to this, is anyly familiar with those skilled in the art in the technical scope that the present invention discloses; can expect easily changing or replacing, within all should being encompassed in protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain of described claim.

Claims (10)

1. a Mission Monitor method, is characterized in that, described method is applied in electronic equipment, and described method comprises:
Obtain and set instruction, described setting instruction comprises very first time parameter, and described setting instruction is used to indicate described electronic equipment according to described very first time setting parameter first task;
Respond described setting instruction, according to first task described in described very first time setting parameter;
According to described very first time parameter, determine storage and monitoring time segment;
In described storage and monitoring time segment, monitor the dump energy of described electronic equipment and described first task at least one second task before complete;
According to control strategy response described at least one second task corresponding with described dump energy, so that the described first task that described electronic equipment is set according to described setting instruction can be complete.
2. method according to claim 1, is characterized in that, described at least one second task of control strategy response that described basis is corresponding with described dump energy, comprising:
When the dump energy of described electronic equipment is less than predetermined threshold value, adopts low-power consumption mode to respond and process described at least one second task; Or
When the dump energy of described electronic equipment is greater than predetermined threshold value, adopt normal power consumption mode to respond and process described at least one second task, when the dump energy of described electronic equipment being detected and be less than described predetermined threshold value, conversion low-power consumption mode respond and process described at least one second task.
3. method according to claim 2, is characterized in that, described according to described very first time parameter, determine storage and monitoring time segment after, also comprise:
Determine the dump energy of described electronic equipment, and determine when described storage and monitoring time segment finishes, the electric weight that complete described first task needs;
When the dump energy of described electronic equipment is not enough to support the complete described first task of described electronic equipment, prompting user described in first task cannot complete.
4. method according to claim 2, is characterized in that, at least one second task before the described dump energy of monitoring described electronic equipment in described storage and monitoring time segment and described first task are complete, comprising:
In described storage and monitoring time segment, at least one in the process of carrying out described at least one the second task constantly, determined the dump energy of described electronic equipment;
When the dump energy of described electronic equipment is not enough to support the complete described first task of described electronic equipment, prompting user described in first task cannot complete.
5. method according to claim 1, is characterized in that, when carrying out described first task, described at least one second task comprises described first task,
At least one second task before the described dump energy of monitoring described electronic equipment in described storage and monitoring time segment and described first task are complete, comprising: dump energy and the described first task of in described storage and monitoring time segment, monitoring described electronic equipment.
6. an electronic equipment, comprising:
Acquiring unit, for obtaining setting instruction, described setting instruction comprises very first time parameter, described setting instruction is used to indicate described electronic equipment according to described very first time setting parameter first task;
Response unit, for responding described setting instruction, according to first task described in described very first time setting parameter;
Determining unit, for determining storage and monitoring time segment according to described very first time parameter;
Monitoring unit, for monitoring the dump energy of described electronic equipment and described first task at least one second task before complete in described storage and monitoring time segment;
Described response unit, according to control strategy response described at least one second task corresponding with described dump energy, so that the described first task that described electronic equipment is set according to described setting instruction can be complete.
7. electronic equipment according to claim 6, described response unit specifically for:
When the dump energy of described electronic equipment is less than predetermined threshold value, adopts low-power consumption mode to respond and process described at least one second task; Or
When the dump energy of described electronic equipment is greater than predetermined threshold value, adopt normal power consumption mode to respond and process described at least one second task, when the dump energy of described electronic equipment being detected and be less than described predetermined threshold value, conversion low-power consumption mode respond and process described at least one second task.
8. electronic equipment according to claim 7, described electronic equipment also comprises display unit, described determining unit also for:
Determine the dump energy of described electronic equipment, and determine when described storage and monitoring time segment finishes, the electric weight that complete described first task needs;
When the dump energy of described electronic equipment is not enough to support the complete described first task of described electronic equipment, by first task described in described display unit prompting user, cannot complete.
9. electronic equipment according to claim 7, described electronic equipment also comprises display unit, described determining unit also for:
In described storage and monitoring time segment, at least one in the process of carrying out described at least one the second task constantly, determined the dump energy of described electronic equipment;
When the dump energy of described electronic equipment is not enough to support the complete described first task of described electronic equipment, by first task described in described display unit prompting user, cannot complete.
10. electronic equipment according to claim 9, when described electronic equipment is carried out described first task, described at least one second task comprises described first task,
Described monitoring unit is specifically for dump energy and the described first task of monitoring described electronic equipment in described storage and monitoring time segment.
CN201410406067.5A 2014-08-18 2014-08-18 The method of Mission Monitor and electronic equipment Active CN104156050B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410406067.5A CN104156050B (en) 2014-08-18 2014-08-18 The method of Mission Monitor and electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410406067.5A CN104156050B (en) 2014-08-18 2014-08-18 The method of Mission Monitor and electronic equipment

Publications (2)

Publication Number Publication Date
CN104156050A true CN104156050A (en) 2014-11-19
CN104156050B CN104156050B (en) 2017-03-01

Family

ID=51881573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410406067.5A Active CN104156050B (en) 2014-08-18 2014-08-18 The method of Mission Monitor and electronic equipment

Country Status (1)

Country Link
CN (1) CN104156050B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106095057A (en) * 2016-06-03 2016-11-09 板牙信息科技(上海)有限公司 The multistage idle method of a kind of mobile unit and mobile unit
CN106211286A (en) * 2016-06-29 2016-12-07 努比亚技术有限公司 A kind of control method and mobile terminal
CN106303096A (en) * 2015-06-10 2017-01-04 联想(北京)有限公司 Electronic equipment and the method adjusting power management policy thereof
CN107197103A (en) * 2017-07-06 2017-09-22 三星电子(中国)研发中心 The power saving progress control method and device of intelligent terminal
CN108733334A (en) * 2018-03-13 2018-11-02 广东欧珀移动通信有限公司 Image quality parameter adjusting method, device, terminal and storage medium
CN109710166A (en) * 2018-12-26 2019-05-03 努比亚技术有限公司 A kind of displaying method of terminal, terminal and computer readable storage medium
CN111198607A (en) * 2018-11-20 2020-05-26 浙江宇视科技有限公司 Method and device for managing power consumption of electronic equipment
CN111212326A (en) * 2020-01-14 2020-05-29 咪咕视讯科技有限公司 Video playing method, electronic equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110159931A1 (en) * 2009-12-29 2011-06-30 International Business Machines Corporation Time-Related Power Systems
US20110291660A1 (en) * 2010-05-26 2011-12-01 Cellnet Innovations, Inc. System and Method for Low Battery Detection
CN102369647A (en) * 2011-09-14 2012-03-07 华为技术有限公司 Power supply managment method and device of mobile terminal
CN103019825A (en) * 2012-12-24 2013-04-03 北京小米科技有限责任公司 Method and device for controlling applications
CN103500002A (en) * 2013-09-17 2014-01-08 小米科技有限责任公司 Method, device and terminal equipment for managing application program

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110159931A1 (en) * 2009-12-29 2011-06-30 International Business Machines Corporation Time-Related Power Systems
US20110291660A1 (en) * 2010-05-26 2011-12-01 Cellnet Innovations, Inc. System and Method for Low Battery Detection
CN102369647A (en) * 2011-09-14 2012-03-07 华为技术有限公司 Power supply managment method and device of mobile terminal
CN103019825A (en) * 2012-12-24 2013-04-03 北京小米科技有限责任公司 Method and device for controlling applications
CN103500002A (en) * 2013-09-17 2014-01-08 小米科技有限责任公司 Method, device and terminal equipment for managing application program

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106303096B (en) * 2015-06-10 2020-12-18 联想(北京)有限公司 Electronic equipment and method for adjusting power management strategy thereof
CN106303096A (en) * 2015-06-10 2017-01-04 联想(北京)有限公司 Electronic equipment and the method adjusting power management policy thereof
CN106095057B (en) * 2016-06-03 2019-02-01 上海新案数字科技有限公司 A kind of multistage idle method and mobile unit of mobile unit
CN106095057A (en) * 2016-06-03 2016-11-09 板牙信息科技(上海)有限公司 The multistage idle method of a kind of mobile unit and mobile unit
CN106211286A (en) * 2016-06-29 2016-12-07 努比亚技术有限公司 A kind of control method and mobile terminal
CN106211286B (en) * 2016-06-29 2019-10-08 努比亚技术有限公司 A kind of control method and mobile terminal
CN107197103A (en) * 2017-07-06 2017-09-22 三星电子(中国)研发中心 The power saving progress control method and device of intelligent terminal
CN108733334A (en) * 2018-03-13 2018-11-02 广东欧珀移动通信有限公司 Image quality parameter adjusting method, device, terminal and storage medium
CN108733334B (en) * 2018-03-13 2020-06-09 Oppo广东移动通信有限公司 Image quality parameter adjusting method, device, terminal and storage medium
CN111198607A (en) * 2018-11-20 2020-05-26 浙江宇视科技有限公司 Method and device for managing power consumption of electronic equipment
CN111198607B (en) * 2018-11-20 2022-11-25 浙江宇视科技有限公司 Method and device for managing power consumption of electronic equipment
CN109710166A (en) * 2018-12-26 2019-05-03 努比亚技术有限公司 A kind of displaying method of terminal, terminal and computer readable storage medium
CN111212326A (en) * 2020-01-14 2020-05-29 咪咕视讯科技有限公司 Video playing method, electronic equipment and storage medium

Also Published As

Publication number Publication date
CN104156050B (en) 2017-03-01

Similar Documents

Publication Publication Date Title
CN104156050A (en) Task monitoring method and electronic device
CN108491065B (en) Portable electronic device and method of operation therein
CN105573465B (en) Electronic device and method of controlling power of electronic device
CN112997134B (en) Application icon display method and device, storage medium and electronic equipment
US20150084778A1 (en) System and method to estimate duration of battery (dis)charging of an electronic device and provide smart charging alerts based on device usage pattern
US11502529B2 (en) Battery charging method employing historical data
CN110554762A (en) Method and terminal for controlling application program
CN110442386A (en) A kind of BMC starting method, system, electronic equipment and computer storage medium
CN108377484B (en) Bluetooth controller power consumption control method and device
CN103501390A (en) Mobile terminal with reminding function and reminding realization method thereof
CN106959857A (en) The application control method and apparatus of a kind of electronic equipment
CN104063316A (en) Application testing method and device
CN111290565A (en) Doze mode control method, device, terminal and storage medium
CN110837456A (en) Control method and device and electronic equipment
CN106292989A (en) A kind of information processing method and electronic equipment
CN104750575A (en) Restoring method and device for mobile terminal operating system
CN106303096B (en) Electronic equipment and method for adjusting power management strategy thereof
CN113947827A (en) Method and device for adjusting running power consumption of door lock, electronic equipment and storage medium
CN107357654B (en) Method and device for controlling over-frequency working state of CPU
CN102427491B (en) Device and method for automatically reminding user to restart electronic device
CN111176958A (en) Information monitoring method, system and storage medium
CN106843440B (en) A kind of mobile terminal restarts control method, device and mobile terminal
CN106055392B (en) Using processing method, test method and the terminal behind entrance backstage
CN106293796B (en) A kind of information processing method and electronic equipment
WO2018053916A1 (en) Application download method, device and terminal, and computer storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant