CN104060738B - Reserved cast-in-place band assembled integral concrete floor - Google Patents

Reserved cast-in-place band assembled integral concrete floor Download PDF

Info

Publication number
CN104060738B
CN104060738B CN201410304312.1A CN201410304312A CN104060738B CN 104060738 B CN104060738 B CN 104060738B CN 201410304312 A CN201410304312 A CN 201410304312A CN 104060738 B CN104060738 B CN 104060738B
Authority
CN
China
Prior art keywords
concrete
floor
cast
reserved
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410304312.1A
Other languages
Chinese (zh)
Other versions
CN104060738A (en
Inventor
刘明
冷连志
许硕娟
马荣全
苗冬梅
范新海
王广林
陈昕
周博
李明泽
张新
郑奕霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianda Engineering Detection Consulting Co ltd
Shenyang Jianzhu University
China Construction Eighth Engineering Division Co Ltd
Original Assignee
SHENYANG JIANDA ENGINEERING DETECTION CONSULTING Co Ltd
Shenyang Jianzhu University
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENYANG JIANDA ENGINEERING DETECTION CONSULTING Co Ltd, Shenyang Jianzhu University, China Construction Eighth Engineering Division Co Ltd filed Critical SHENYANG JIANDA ENGINEERING DETECTION CONSULTING Co Ltd
Priority to CN201410304312.1A priority Critical patent/CN104060738B/en
Publication of CN104060738A publication Critical patent/CN104060738A/en
Application granted granted Critical
Publication of CN104060738B publication Critical patent/CN104060738B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention belongs to field of civil engineering, refer more particularly to xoncrete structure and assembled arthitecutral structure. Reserved cast-in-place band assembled integral concrete floor is by prefabricated concrete floor and cast-in-place concrete strip two parts. Wherein floor pre-erection comprises reinforcing bar and the built-in fitting of concrete and internal configurations thereof. Precast slab only need be reserved groove or the plate seam that size is less, improve the prefabricated rate of floor, can reduce situ wet operation, accelerate on-the-spot installation rate, strengthened the globality of floor, simultaneously by lay pipeline in reserved groove or plate seam, reduce slab thickness, reduce concrete amount, and then alleviated dead load, reduced the geological process of structure.

Description

Reserved cast-in-place band assembled integral concrete floor
Technical field
The invention belongs to field of civil engineering, refer more particularly to assembled arthitecutral structure and xoncrete structure.
Background technology
In current prefabricated concrete structure, laminated floor slab can reduce a modulus with it, reduces wet trade, increases work efficiency, and the advantage that shortens construction period has obtained application comparatively widely. But current laminated floor slab, except prefabrication rate is on the low side, remains in following problem: 1), for improving rigidity and the bearing capacity of prefabricated board, meet installation demand, set up truss bars; 2) for arranging that pipeline strengthens the thickness of overlapping layers. For this reason, cause concrete amount to increase to some extent compared with Bars In Poured Concrete Slab with amount of reinforcement, construction costs improves, and dead load also makes structural earthquake effect strengthen when increase.
Summary of the invention
The present invention is in order to make up the defect of existing concrete superimposed sheet, provide that a kind of thickness of slab is equal to cast-in-place concrete floor, prefabricated rate is higher, globality is stronger, concrete amount still less, reserved cast-in-place band assembled integral floor that dead load is lighter.
In order to solve above-mentioned key technical problem, the present invention is achieved by the following scheme:
Reserved cast-in-place band assembled integral concrete floor is made up of prefabricated concrete floor and cast-in-place concrete strip two parts, wherein prefabricated concrete floor comprises reinforcing bar and the built-in fitting of concrete and internal configurations thereof, and reserved cast-in-place band place poured in place concrete forms cast-in-place concrete strip.
Advantage of the present invention is: reserved cast-in-placely only need reserve with assembled integral concrete floor groove or the plate seam that size is less, improve the prefabricated rate of floor, can reduce situ wet operation, accelerate on-the-spot installation rate, strengthened the globality of floor, simultaneously by lay pipeline in reserved groove or plate seam, reduce slab thickness, reduce concrete amount, and then alleviated dead load, reduced the geological process of structure.
(4) brief description of the drawings
Accompanying drawing 1 and accompanying drawing 2 are schematic diagrames of the present invention, and wherein accompanying drawing 1 is not less than the floor of 140mm for design thickness, and accompanying drawing 2 is less than the floor of 140mm for design thickness.
(5) detailed description of the invention
Below in conjunction with drawings and Examples to the present invention's detailed explanation in addition.
The present invention is not less than the floor of 140mm for design thickness, be split as and be not more than 1200mm*1200mm plate, reserved groove between plate, in groove, reinforcing bar connects, pre-erection adopts produce in factory or nomadic Mold Making, forms assembled integral concrete floor by scene casting concrete in groove. Groove bottom concrete thickness of slab is not less than 60mm, and the height of groove is not less than 80mm, as shown in Figure 1.
Be less than the floor of 140mm for design thickness, be split as and be not more than 1200mm*1200mm plate, the plate seam that between plate, reserved width is 100mm-300mm, between plate seam, reinforcing bar connects, pre-erection adopts produce in factory or nomadic Mold Making, form assembled integral concrete floor by scene at preformed plate seam place casting concrete, as shown in Figure 2.
In the time of produce in factory, according to the reserved cast-in-place band of the corresponding mould of relevant parameter utilization of design position, installation form, layout reinforcing bar and casting concrete. Pre-erection of the present invention is after produce in factory completes, by prefabricated board rigid support, the reserved cast-in-place prefabricated board with both sides, position is fixed, after being transported to scene, lift by crane installation, lay after pipeline at preformed plate seam or groove by design, preformed plate seam or groove are carried out to cast in situs, form cast-in-place band, form assembled integral concrete floor.

Claims (1)

1. reserved cast-in-place band assembled integral concrete floor, formed by prefabricated concrete floor and cast-in-place concrete strip two parts, it is characterized in that prefabricated concrete floor comprises reinforcing bar and the built-in fitting of concrete and internal configurations thereof, reserved cast-in-place band place poured in place concrete forms cast-in-place concrete strip, be not less than the floor of 140mm for design thickness, be split as and be not more than 1200mm*1200mm plate, reserved groove between plate, groove bottom concrete thickness of slab is not less than 60mm, the height of groove is not less than 80mm, and in groove, reinforcing bar connects; Be less than the floor of 140mm for design thickness, be split as and be not more than 1200mm*1200mm plate, the plate of reserved width 100mm-300mm seam between plate, between plate seam, reinforcing bar connects.
CN201410304312.1A 2014-06-30 2014-06-30 Reserved cast-in-place band assembled integral concrete floor Expired - Fee Related CN104060738B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410304312.1A CN104060738B (en) 2014-06-30 2014-06-30 Reserved cast-in-place band assembled integral concrete floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410304312.1A CN104060738B (en) 2014-06-30 2014-06-30 Reserved cast-in-place band assembled integral concrete floor

Publications (2)

Publication Number Publication Date
CN104060738A CN104060738A (en) 2014-09-24
CN104060738B true CN104060738B (en) 2016-05-18

Family

ID=51548652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410304312.1A Expired - Fee Related CN104060738B (en) 2014-06-30 2014-06-30 Reserved cast-in-place band assembled integral concrete floor

Country Status (1)

Country Link
CN (1) CN104060738B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638455A (en) * 2016-12-15 2017-05-10 长春工程学院 Composite Z-shaped precast reinforced concrete bunding protective wall
CN107020696A (en) * 2017-05-24 2017-08-08 深圳市鹏城建筑集团有限公司 A kind of processing method of the precast slab with plane built-in fitting
CN108343184A (en) * 2018-02-02 2018-07-31 广州市第二市政工程有限公司 The floor construction method that tongue and groove hollow pre-fabricated panels and well word Cast-in-situ Beam are combined
CN109339326A (en) * 2018-12-06 2019-02-15 三筑工科技有限公司 Indoor pipeline arranging system and building
CN109457852A (en) * 2018-12-18 2019-03-12 三筑工科技有限公司 Floor piece ventilation duct structure and aeration structure
CN111075081B (en) * 2020-02-21 2021-11-12 中建八局第一建设有限公司 Laminated slab and construction method thereof
CN111576705A (en) * 2020-05-29 2020-08-25 上海宝冶集团有限公司 Splitting method for reducing specification of assembled laminated slab
CN112144720B (en) * 2020-10-12 2021-08-13 天元建设集团有限公司 Staggered joint buckling type prefabricated concrete floor system and construction method thereof
CN114575510A (en) * 2020-11-30 2022-06-03 周俏 Prefabricated floor slab and installation method thereof
CN114622492B (en) * 2022-04-02 2023-11-10 中国水利水电第七工程局有限公司 Ultrahigh hollow thin-wall pier large-section diaphragm plate and construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100467761C (en) * 2002-04-30 2009-03-11 邱则有 Steel reinforced concrete stereo load-carrying construction roof
CN101260695A (en) * 2003-09-15 2008-09-10 邱则有 Light weight tire shuttering member for cast-in-situ concrete
RU2285772C1 (en) * 2005-09-09 2006-10-20 Николай Павлович Селиванов Composite floor panel for skeleton-type building (variants)
CN103572873B (en) * 2012-07-20 2016-03-02 初明进 Assembled integral floor and construction method thereof
CN204001331U (en) * 2014-06-30 2014-12-10 沈阳建筑大学 Reserved cast-in-place band assembled integral concrete floor

Also Published As

Publication number Publication date
CN104060738A (en) 2014-09-24

Similar Documents

Publication Publication Date Title
CN104060738B (en) Reserved cast-in-place band assembled integral concrete floor
CN202194059U (en) Prestressed reinforced concrete multi-ribbed hollow superposed box girder
CN103883051B (en) A kind of assembled plate-beam connecting node and construction method thereof
CN105971159B (en) A kind of masonry shell mechanism in 3D printing reinforced masonry shear wall
CN207878747U (en) A kind of laminated floor slab prefabricated board
CN103572873B (en) Assembled integral floor and construction method thereof
CN201738443U (en) Prefabricated concrete double-overlapping beam
CN104895230A (en) Post-cast belt for precast composite floor slabs and construction method of post-cast belt
CN101649656A (en) Overlapped shear wall with prefabricated part and cast-in-situ part and manufacturing method thereof
CN106760101A (en) A kind of prefabricated superimposed sheet
CN103953147A (en) Two-way sandwich panel for split mounting type reinforcing bar girder
CN204001333U (en) Prestressing force two-way ribs composite floor plate
CN204356996U (en) The U-shaped beam of prefabricated reinforced concrete with horizontal steel diaphragm
CN204001331U (en) Reserved cast-in-place band assembled integral concrete floor
CN203393880U (en) Enhanced type reinforced concrete laminated floor slab
CN110359614A (en) A kind of compound laminated floor slab and its construction method based on unidirectional longitudinal system
CN104234088A (en) Post-cast strip structure of prefabricated double-layer laminate basement external wall panel and construction procedure
CN104294752A (en) Hollow slab bridge structure with end floor beams and construction method thereof
CN109695289B (en) Crack-resistant prefabricated superposed balcony slab and construction method thereof
CN203499082U (en) Hidden connecting beam for side steel plate rib concrete composite floor slabs
CN204691033U (en) A kind of superposed beam prefabricated units for integral precast groined type building cover structure
CN203440966U (en) Section steel plate rib concrete composite floor slab
CN204163232U (en) Double layer hollow reinforce concrete wall
CN206110423U (en) Water integral reinforced concrete floor slab of seam assembly after reservation
CN203654596U (en) Close type embedded light-weight filling block prestressed-concrete light-duty superimposed plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160414

Address after: At 110179 Shenyang Road, Liaoning Province Hunnan New District No. 7-2 layer

Applicant after: SHENYANG JIANDA ENGINEERING DETECTION CONSULTING Co.,Ltd.

Applicant after: SHENYANG JIANZHU University

Applicant after: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd.

Address before: 110168 Liaoning province Shenyang Hunnan Hunnan Road No. 9

Applicant before: SHENYANG JIANZHU University

Applicant before: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd.

Applicant before: SHENYANG JIANDA ENGINEERING DETECTION CONSULTING Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518