[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

BE562773A - - Google Patents

Info

Publication number
BE562773A
BE562773A BE562773DA BE562773A BE 562773 A BE562773 A BE 562773A BE 562773D A BE562773D A BE 562773DA BE 562773 A BE562773 A BE 562773A
Authority
BE
Belgium
Prior art keywords
formwork
concrete
mortar
scaffolding
construction
Prior art date
Application number
Other languages
French (fr)
Publication of BE562773A publication Critical patent/BE562773A/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

       

   <Desc/Clms Page number 1> 
 



   La présente invention est relative à un nouveau procédé pour la construction de structures en béton et d'édifices en   général,,,   Ce procédé   cdmsiste   à préparer, dans une usine ou autre installation industrielle, les éléments nécessaires pour former le coffrage destiné à la réalisation de la structure en béton; 

 <Desc/Clms Page number 2> 

 à diriger sur le terrain ur   @@@@iaudage   métallique   tubulaire':   suivant le contour du plan de la construction à édifier, en pla- çant les traverses constituant l'armature au niveau de chaque étage; à placer sur celles-ci des éléments de coffrage constitués par des châssis recouverts d'une plaque métallique ou en bois   comme élément de support de la dalle en béton ;

   àinstaller en   dehors du périmètre   du.,dit   échafaudage métallique, par un moyen facile à réaliser sur place, le coffrage préfabriqué destiné à la formation des poutres et en dessous de celui-ci le coffrage   destiné à la formation des colonnes ; àrecouvrir sur place les   espaces laissés libres entre les éléments ci-avant, en les   recou-   vrant de planches ou panneaux en bois, de manière adonner un ni- veau continu à l'ensemble ainsi constitué; à couler du mortier de façon à remplir l'ensemble et, une fois celui-ci durci, à reti- rer les éléments constitutifs du coffrage et- de l'échafaudage métallique. 



   Le coffrage ainsi disposé et supporté par l'échafaudage métallique tubulaire permet d'assembler toute la structure de la construction en une fois et d'effectuer son remplissage en une seule opération continue, ce qui offre un avantage   considé-   rable en ce qui concerne l'économie de temps et de main-d'oeuvre. 



   A titre d'exemple, l'on peut indiquer qu'une construc- tion de huit étages, par les moyens connus actuellement, nécessi- te 80 jours pour son achèvement, tandis qu'avec le procédé in- diqué ci-avant, dix jours seulement seraient suffisants. Il con- vient également de signaler à ce sujet qu'actuellement le coffra- ge s'effectue sur le chantier, en établissant en premier lieu celui pour la première dalle et ensuite, en prenant celle-ci pour base, on établit le coffrage de la seconde et ainsi de sui- te jusqu'à ce que tous les étages constituant l'immeuble ou la construction soient achevés. 



   Ce procédé implique une série d'opérations prenant beau- 

 <Desc/Clms Page number 3> 

 coup de temps, car pendant que l'on remplit une première dalle, on ne peut pas continuer l'exécution du coffrage de la seconde, avec pour résultat une perte de temps et également un manque d' organisation dans le travail, Le procédé suivant   3,'invention   élimine avec succès ces inconvénients. 



   Il est évident que le coffrage préfabriqué conçu pour for- mer des dalles, des poutres et des colonnes de dimensions   oorres-   pondant à   l'exécution   de structures "standard", permet l'utili- sation sans difficultés ni inconvénients pour la construction de bâtiments successifs ou simultanés, suivant les équipes dont . le constructeur dispose.

   D'autre part, il est logique, au point de vue organisation du travail dans le chantier, d'utiliser sui- /c'est-à-dire/ vant les besoins des groupes d'ouvriers   spécialisés,.-/-   en premier lieu ceux qui s'occupent de l' édification de   l'échafau-   dage métallique tubulaire, qui sont suivis par ceux ajustant le coffrage préfabriqué et finalement par ceux qui remplissent, en une seule opération contenue, toute la structure de la con- struction à édifier. 



   D'autres détails .et .particularités de l'invention res- sortiront de la description ci-après, donnée à titre non limi- tatif et en se référant aux dessins annexés, dans les quels : 
La figure 1 est une vue en perspective schématique de l'échafaudage métallique tubulaire monté pour la construction d'une structure à cinq étages. 



   La figure 2 est une vue en perspective correspondant à la figure 1, représentant le placement des châssis destinés à former les dalles. 



   La figure 3 est une vue en perspective et à très gran- de échelle du montage des caissons pour la formation des poutres. 



   La figure 4 est une vue en perspective et à plus gran- de échelle du coffrage nécessaire pour la formation des colonnes. 



   La figure 5 est une vue en perspective d'un des châssis   @   

 <Desc/Clms Page number 4> 

 recouvert de lames métalliques ou en bois. 



   La figure 6 est une vue de détail, à grande échelle, du recouvrement sur place des espaces laissés libres. 



   Dans ce dessin, la référence 1 désigne les montants de l'échafaudage tubulaire métallique sur lequel sont disposés, sur ses traverses 2, des châssis recouverts de plaques métalli-   @     que/ou   en bois 4. Des caissons 5 destinés à former les poutres sont fixés en des endroits appropriés et l'on y adjoint les cof- frages pour la formation des colonnes 6. Une fois ce montage achevé, on recouvre les espaces laissés libres 7, 7', sur pla- ce, au moyen de panneaux en bois 8 de façon à niveler l'ensem- ble.   On/Procède   alors au remplissage du béton et on laisse celui- ci se solidifier, après quoi on retire tous les éléments pré- cités. 



   Il doit être entendu que l'invention n'est en aucune fa- /réalisation/ çon limitée aux formes de / . ci-avant et que bien des modifi- cations peuvent y être apportées, sans sortir du cadre du pré- sent brevet,. 

**ATTENTION** fin du champ DESC peut contenir debut de CLMS **.



   <Desc / Clms Page number 1>
 



   The present invention relates to a new process for the construction of concrete structures and buildings in general ,,, This process involves preparing, in a factory or other industrial installation, the elements necessary to form the formwork intended for the realization. concrete structure;

 <Desc / Clms Page number 2>

 to direct on the ground ur @@@@ tubular metal iaudage ': according to the outline of the plan of the construction to be built, by placing the crossbars constituting the reinforcement at the level of each floor; placing on them formwork elements consisting of frames covered with a metal or wooden plate as a supporting element for the concrete slab;

   to install outside the perimeter of the., said metal scaffolding, by a means easy to achieve on site, the prefabricated formwork intended for the formation of the beams and below it the formwork intended for the formation of the columns; to cover on the spot the spaces left free between the above elements, by covering them with wooden boards or panels, so as to give a continuous level to the whole thus constituted; pouring mortar so as to fill the assembly and, once the latter has hardened, removing the constituent elements of the formwork and of the metal scaffolding.



   The formwork thus arranged and supported by the tubular metal scaffolding makes it possible to assemble the whole structure of the construction at once and to carry out its filling in a single continuous operation, which offers a considerable advantage in terms of saving time and manpower.



   By way of example, it can be indicated that an eight-storey construction, by the means known at present, requires 80 days for its completion, while with the method indicated above, ten only days would be sufficient. It should also be pointed out in this regard that currently the formwork is carried out on the site, by first establishing that for the first slab and then, taking this as a base, the formwork of the second and so on until all floors constituting the building or construction are completed.



   This process involves a series of operations taking a lot of

 <Desc / Clms Page number 3>

 time, because while filling a first slab, we can not continue the execution of the formwork of the second, resulting in a loss of time and also a lack of organization in the work. 3, the invention successfully eliminates these drawbacks.



   It is obvious that the prefabricated formwork designed to form slabs, beams and columns of dimensions corresponding to the execution of "standard" structures, allows the use without difficulty or inconvenience for the construction of buildings. successive or simultaneous, depending on the teams including. the manufacturer has.

   On the other hand, it is logical, from the point of view of the organization of the work in the site, to use following- / that is to say / before the needs of the groups of specialized workers, .- / - first take place those who deal with the erection of the tubular metal scaffolding, who are followed by those adjusting the prefabricated formwork and finally by those who fill, in a single contained operation, the whole structure of the construction to. to build.



   Other details and .particularities of the invention will emerge from the description below, given without limitation and with reference to the accompanying drawings, in which:
Figure 1 is a schematic perspective view of the tubular metal scaffold mounted for the construction of a five-storey structure.



   FIG. 2 is a perspective view corresponding to FIG. 1, showing the placement of the frames intended to form the slabs.



   FIG. 3 is a perspective view on a very large scale of the assembly of the caissons for the formation of the beams.



   Figure 4 is a perspective view on a larger scale of the formwork required for the formation of the columns.



   Figure 5 is a perspective view of one of the frames @

 <Desc / Clms Page number 4>

 covered with metal or wooden slats.



   FIG. 6 is a detailed view, on a large scale, of the on-site covering of the spaces left free.



   In this drawing, the reference 1 designates the uprights of the tubular metal scaffolding on which are arranged, on its crosspieces 2, frames covered with metal / or wooden plates 4. Boxes 5 intended to form the beams are arranged. fixed in suitable places and we add the formwork for the formation of the columns 6. Once this assembly is completed, we cover the spaces left free 7, 7 ', on site, by means of wooden panels 8 so as to level the whole. The concrete is then filled and it is allowed to solidify, after which all the aforementioned elements are removed.



   It should be understood that the invention is in no way limited to the forms of /. above and that many modifications can be made to it, without departing from the scope of the present patent.

** ATTENTION ** end of DESC field can contain start of CLMS **.


    

Claims (1)

REVENDICATIONS 1. Procédé d'exécution pour la construction de structu- res en béton dans des édifices en général,caractérisé en ce qu' il consiste à préparer, dans des usines ou installations indus- trielles, tous les éléments de coffrages nécessaires, y compris dos châssis recouverts de plaques métalliques ou en bois; à ef- fectuer le montage sur le terrain d'un échafaudage métallique tubulaire suivant les limites de la construction; à poser sur les traverses constituant cet échafaudage les--dits châssis des- tinés à la formation des dalles; à fixer par des moyens appro- priés les caissons qui formeront les poutres et, fixés à ceux- ci, les éléments de coffrage destinés à former les colonnes; à recouvrir les espaces laissés libres de façon à niveler ensem- ble; CLAIMS 1. Method of execution for the construction of concrete structures in buildings in general, characterized in that it consists in preparing, in factories or industrial installations, all the necessary formwork elements, including back. frames covered with metal or wooden plates; to carry out the erection on the ground of a tubular metal scaffolding according to the limits of the construction; to place on the sleepers constituting this scaffolding - said frames intended for forming the slabs; fixing by suitable means the caissons which will form the beams and, fixed thereto, the shuttering elements intended to form the columns; to cover the spaces left free so as to level together; à remplir de béton ou de mortier les coffrages et, une fois <Desc/Clms Page number 5> ce béton ou mortier solidifié, à enlever les éléments du coffra- ge ainsi que l'échafaudage précité. to fill the formwork with concrete or mortar and, once <Desc / Clms Page number 5> this solidified concrete or mortar, to remove the elements of the casing as well as the aforementioned scaffolding. 2. Procédé suivant là revendication 1, caractérisé en ce qu'on monte le coffrage total pour tout un édifice, même si celui-ci est constitué de plusieurs étages et en ce qu'on pro- cède à la coulée du mortier ou béton en une seule opération con- tinue jusqu'à achèvement de la-dite structure. 2. Method according to claim 1, characterized in that the total formwork is assembled for an entire building, even if it consists of several floors and in that the mortar or concrete is poured in. a single operation continues until completion of said structure. 3, Procédé d'exécution pour l'édification de structures en béton dans des édifices en général, tel . que décrit ci- avant ou conforme aux dessins annexés.. 3, Method of execution for the erection of concrete structures in buildings in general, such. as described above or in accordance with the accompanying drawings.
BE562773D BE562773A (en)

Publications (1)

Publication Number Publication Date
BE562773A true BE562773A (en)

Family

ID=184251

Family Applications (1)

Application Number Title Priority Date Filing Date
BE562773D BE562773A (en)

Country Status (1)

Country Link
BE (1) BE562773A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL9000138A (en) * 1990-01-19 1991-08-16 Cornelis Spee Adjoining dwelling construction method - includes concrete base, support beams and interconnected uprights

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL9000138A (en) * 1990-01-19 1991-08-16 Cornelis Spee Adjoining dwelling construction method - includes concrete base, support beams and interconnected uprights

Similar Documents

Publication Publication Date Title
EP3310973A1 (en) Construction of the prefabricated column and beam type
US4434600A (en) Method for fixing the ends of concrete columns in concrete bases and device for carrying out said method
BE562773A (en)
JP3342891B2 (en) Construction method of horizontal beam erected on columnar structure
EP0080398B1 (en) Industrial building supporting structure constituted of prefabricated reinforced concrete elements
JPH04330168A (en) Construction method for building with basement equipped with steel pipe pile foundation
KR100894141B1 (en) Construction method and construction of construction and civil engineering structures using panels
FR2564875A1 (en) Novel rapid method for constructing buildings, using pumped materials, by means of permanent multi-dimensional, self-shuttering reinforcements and of a scaffolding assembly having various uses
JP2895782B2 (en) REINFORCED CONCRETE CONSTRUCTION OF BEAMS AND COLUMNS AND METHOD OF CONSTRUCTION
FR2938856A1 (en) PREFABRICATED CONCRETE PANEL, AND METHOD FOR IMPLEMENTING SUCH PANEL IN FLOOR FRAMEWORK
JPH0352918Y2 (en)
JP2606860B2 (en) Casting method of foundation and earth concrete
JP4347195B2 (en) Construction method of viaduct foundation using steel pipe column joint element
BE843363A (en) PROCEDURE AND DEVICE FOR THE RENOVATION OF BUILDINGS BY CASTING CONCRETE SLABS ON EXISTING FLOORS
EP0363544B1 (en) Reinforced concrete modular structure for the construction of buildings
JP2001026975A (en) Construction method for lining plate for side ditch on farm road
JPS632486Y2 (en)
JPH0416574B2 (en)
JP3312945B2 (en) Construction method of concrete structure
JPH11172701A (en) Method for constructing masonry wall
JPH07103583B2 (en) Construction method for large span underground structure
JP2811211B2 (en) Flat slab construction method
FR2694335A1 (en) Method of forming underground parking facility - includes steps of cutting galleries, in underground excavation, with arches between walls supported on piles
JPH0674590B2 (en) Block for building legal framework and method for building legal framework
BE1016362A6 (en) Reinforced concrete wall constructing method for realizing e.g. swimming pool, involves positioning vertical bars inside holes of formwork blocks, and positioning horizontal bars extending at level of ground