AU774917B2 - Method for controlling the operation of a switching device - Google Patents
Method for controlling the operation of a switching device Download PDFInfo
- Publication number
- AU774917B2 AU774917B2 AU65666/00A AU6566600A AU774917B2 AU 774917 B2 AU774917 B2 AU 774917B2 AU 65666/00 A AU65666/00 A AU 65666/00A AU 6566600 A AU6566600 A AU 6566600A AU 774917 B2 AU774917 B2 AU 774917B2
- Authority
- AU
- Australia
- Prior art keywords
- predefined
- closing operation
- operation sequence
- opening
- sequences
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H9/00—Details of switching devices, not covered by groups H01H1/00 - H01H7/00
- H01H9/54—Circuit arrangements not adapted to a particular application of the switching device and for which no provision exists elsewhere
- H01H9/56—Circuit arrangements not adapted to a particular application of the switching device and for which no provision exists elsewhere for ensuring operation of the switch at a predetermined point in the ac cycle
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H9/00—Emergency protective circuit arrangements for limiting excess current or voltage without disconnection
- H02H9/001—Emergency protective circuit arrangements for limiting excess current or voltage without disconnection limiting speed of change of electric quantities, e.g. soft switching on or off
- H02H9/002—Emergency protective circuit arrangements for limiting excess current or voltage without disconnection limiting speed of change of electric quantities, e.g. soft switching on or off limiting inrush current on switching on of inductive loads subjected to remanence, e.g. transformers
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Driving Mechanisms And Operating Circuits Of Arc-Extinguishing High-Tension Switches (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Feedback Control In General (AREA)
- Operating, Guiding And Securing Of Roll- Type Closing Members (AREA)
- Power-Operated Mechanisms For Wings (AREA)
- Control Of Eletrric Generators (AREA)
- Crystals, And After-Treatments Of Crystals (AREA)
- Massaging Devices (AREA)
Abstract
A method for controlling the closing operation of a switching device, disposed on a electrical network connected to an inductive component, comprising the following steps: acquiring first data related to the electrical characteristics of said inductive component and said network; based on said first data, selecting, on predefined first storage means containing opening and closing operation sequences, a first predefined opening operation sequence; based on said first predefined opening operation sequence, selecting, on said first storage means, a first predefined closing operation sequence. <IMAGE>
Description
WO 01/16975 PCTEP00/07172 METHOD FOR CONTROLLING THE OPERATION OF A SWITCHING
DEVICE
DESCRIPTION
The present invention relates to a method for controlling the operation of a switching device. More particularly the present invention relates to a method for controlling the opening/closing operation of a switching device disposed on an electrical network, which is connected to an inductive component, such as a transformer, a reactance and the like.
Many examples of methods for controlling the operation of switching devices io such as a circuit breakers, disconnectors and the like are reported in the state of the art. So, it is well known that switching devices generally operate in response to commands, either automatic or manual that are sent from a control and monitoring panel. This means that operation can take place in a "random" manner in relation to the parameters of the electrical network (either tri-phase or mono-phase) the switching devices are connected to. Performing closing/opening operation asynchronously in relation to the electrical network parameters, generates very often electrical transients and/or electrical arcing phenomena, such as the so called "pre-strikes" or "re-strikes", that are generally extremely damaging.
These undesired effects arc obviously present when a switching device is disposed on a electrical network connected to an inductive component. After an opening operation is performed, a residual flux is present in the magnetic core of the inductive component. The quantity of residual flux depends on the hysteresis cycle, which characterises the magnetic core of the inductive component.
Unfortunately, said quantity is not constant but it varies due to various reasons such as, for example, the presence of stray capacitances. This fact implies that the quantity of residual flux still present in the magnetic core can be unknown.
Therefore, the subsequent closing operation, with an "asynchronous" switching device, can be performed in relation to a magnetic state, which can be very 1 CONRMAON COTFP WO 01/16975 PCT/EP00O/07172 different from the one actually present in the magnetic component. So, high current transients (called "in-rush currents"), which are characterised by very high magnetisation currents (ten-twenty times the rated current) with strong harmonic content, can arise. The presence of high current transients causes power peaks, the management of which is very difficult to perform. So, for example, in low power networks it is necessary to provide for many generators in parallel, in order to avoid network instability problems. Also in emergency network it is necessary to connect the present transformers once at time, waiting often for the lowering of the current transients. In secondary distribution to networks many problems can arise due to the failure of protection fuses.
Moreover the presence of a strong harmonic content, particularly of the 2 d order, leads to a lower Power Quality (PQ) of the whole network. The presence of a strong harmonic content can also arise problems in the management of the network protection.
In order to minimise these damaging transient effects, many methods of the state of the art provide for performing the electrical operation in a "synchronous" manner. The operation is then performed in relation to the network parameters, which is to say to determine, for example in the case of a three-phase network, sequences of optima operating moments. Each of these sequences, hereinafter defined as an "operation sequence", is a sequence of moments in which voltage and/or current of each phase reaches desired values. Each operation sequence can be performed independently for each pole of the switching device.
In case of switching devices connected to inductive components, solutions are known in which the choice of an optimal operation sequence is actually predefined.
For example, US patent 5,119,260 offers a choice of the optimal operation in relation to the opening operation only. The moments, which are out of phase by a fixed amount of time in relation to the passage through the current zero, are ABB00117/WO pre-set as optimal. This situation is entirely unsuitable for other types of operations, such as the closing operation.
Other solutions allow one to choose the optimal operation sequence in a relation to the type of operation only without taking the load into account. For example, US patent 5,361,184 takes the current zeros as the optimal moments for opening operations and the voltage zeros as the optimal moments for closing operations, irrespective of the type of load.
Also this type of solutions is unsuitable because it does not take in account the specific problems arising when an inductive component is connected to the network.
Other methods propose as optima for a closing operation sequence, the moments in which the voltage reaches its maximum. Even if this solution represents a technical progress in relation to the previous solutions described, is unsuitable and unable to drastically reduce the current transients. In fact, the mentioned variations of the inductive flux are not taken into account.
:i In conclusion, one may assert that the known solutions of the state of the art, .while achieving the task for which they were designed, do not guarantee the effective reduction of the current transients when switching device operations are performed in presence of inductive components.
20 The aim of the present invention is to provide a method for controlling the opening/closing operations of a switching device, disposed on a electrical network connected to an inductive component, which allows to reduce S drastically the mentioned transient effects.
As part of this task, one embodiment of the present invention provides a method, which allows reducing the so called "in-rush currents" to negligible values if compared with the rated current, so as to improve the power quality of the electrical network and to avoid other mentioned problems.
3 \\nmlb-fileshoni\Pryana\Kcpspeci\666-OO doc 10/05/04 ABBOO 17/WO Another object of an embodiment is to provide a method, which allows drastically reducing the low order current harmonics, so as to improve the functionality and management of the network protection devices.
A further object of an embodiment is to provide a method, which can be easily realised using processing systems of common use.
Thus, the present invention provides a method for controlling the closing operation of a switching device, said switching device being disposed on a electrical network, said electrical network being connected to an inductive component, comprising the following steps: a) acquiring first data related to the electrical characteristics of said inductive component and said electrical network; b) based on said first data, selecting, on predefined first storage means containing predefined opening and closing operation sequences, a first predefined opening operation sequence; c) based on said first predefined opening operation sequence, selecting, on I: said first storage means, a first predefined closing operation sequence.
According to a further aspect of the invention there is provided a control device for executing the above method characterised in that it comprises: -said predefined first storage means containing said opening/closing zo operation sequences; and -second predefined storage means for memorising said first data related to electrical characteristics of said network and said inductive component; and -a processing unit which, following a trip command, selects one of the ooo•• predefined opening/closing operation sequences; and -detecting and alarm means for acquiring and checking said second data related to the execution of an opening operation; and -detecting means for acquiring said third data related to the electrical transients due to the execution of a closing operation.
4 \\melb_fies\homeS\Priyan ka\Kccp\spcct\6S 666-O.doc 10/05104 ABB00117/WO Further characteristics and advantages of the invention shall emerge more clearly from the description of preferred but not exclusive embodiments of the method as in the invention, illustrated purely by way of example and without limitation in the attached drawings, in which: Figure 1 is a diagram illustrated the sequence of steps executed by the method as in the invention; Figure 2 is a diagram related to a preferred but not limiting embodiment of the method as in the invention; Figure 3 is a diagram related to a further preferred but not limiting embodiment of the method as in the invention; Figure 4 is a diagram related to a further preferred but not limiting embodiment of a control device implementing the method as in the invention.
*e ee* e 4a \\Jwlb-ficI\b\P iyanka\Kctp\specC6S666-OOdoc 10/05/04 WO 01/16975 PCT/EP00/07172 With reference to the mentioned figures, the method as in the present invention comprises the step a) (reference 1) of acquiring first data (dotted arrow 2) related to the electrical characteristics of the inductive component and of the electrical network. First data 2 comprise preferably data related to the type of connection of the inductive component to the electrical network and/or data related to the state of the neutral connection of the electrical network and/or data related to the network impedance voltage, rated voltage and rated power. At step b) (reference a first predefined opening operation sequence (reference 4) is selected. The predefined opening operation sequence, which is a predefined io sequence of moments in which voltage and/or currents reaches desired values for performing the opening operation), is selected on predefined first storage means 5, containing predefined opening/closing operation sequences.
First storage means 5 can be predefined tables or libraries or other means, electronic or not, for memorising information. First data 2, which can be memorised on predefined second storage means (not illustrated in figure are in practice used to address the first storage means 5. Second storage means can be of the same type of the first storage means 5 previously described.
At step c) (reference 6 of figure 2) a first predefined closing operation sequence is selected on the first storage means 5. The selection of the predefined closing operation sequence, which is a predefined sequence of moments in which voltage reaches desired values for performing the closing operation), is performed based on the predefined opening operation sequence selected at step Said predefined sequence is, in practice, used to address the first storage means 5 in order to select the most proper closing operation sequence.
This solution is particularly advantageous because, known the parameters of the inductive component connected to the network after the acquisition of the first data at step it is possible to select the opening sequence so as to reach, after its execution, a known magnetic state of the inductive component. Based on the knowledge of said magnetic state, one can select the most proper closing WO 01/16975 PCT/EPOO/07172 operating sequence in order to reduce the mentioned transient phenomena. In practice one or more closing operation sequences are predefined taking into account a possible magnetisation state of the inductive component. They are selected depending on the magnetisation state into which the previous opening operation sequence is foreseen to bring the inductive component.
The first storage means 5 contain, among said predefined closing operation sequences, at least a general purpose predefined closing operation sequence.
Said general purpose predefined closing operation sequence is used when, for various reasons that will be described hereinafter, the magnetisation state of said inductive component is unknown in order to maintain, in any case, the transients, due to the closing operation, below a threshold level. An example of said general purpose predefined closing operation sequence is a sequence of moments in which the phase voltage reaches its maximum.
A first case, wherein said general purpose predefined closing operation sequence can be used, is for example when the inductive component is installed for the first time on the network. In this case, because the inductive component is not energised yet, the magnetisation state is actually unknown. So, the first closing operation, can be performed using said general purpose closing operation sequence. Current transients are then surely present but they will be maintained under a safe level (for example 2-3 times the rated current). The execution of the mentioned general purpose closing sequence 6 have also the aim of bringing the inductive component in a state from which the method, as in the present invention, can be applied more easily. In practice, in this case, its execution can be considered a step of the "start-up" procedure to be run, when an inductive component has been just installed.
Referring to figure 2, another advantageous embodiment of the method as in the present invention, in which said general purpose predefined closing operation sequence can be used, is disclosed. After step b) (reference said embodiment uiIIpi-Is (1icclluc 8) tie sicp uf cACt;uiiig saiu fiiSt preueiiieu upcig WO 01/16975 PCT/EPOO/07172 operation sequence 3. Then, (reference the method provides for acquiring and checking second data (dotted arrow 22) related to the correct/incorrect execution of the first opening operation sequence 3 are acquired and checked.
Second data 22 can be, for example, logic signals acquired from detecting and alarm means 21 that can be preferably represented by logic controls and/or sensors checking if the opening operation sequences has been actually performed on the foreseen moments. In case the first opening operation sequence 3 has been executed correctly then (reference 4) a predefined closing operation sequence is chosen from the first storage means 5, basing of said first opening operation sequence (reference On the contrary, if the first opening operation sequence 3 has not been executed correctly, the general purpose predefined closing operation sequence is selected from the first storage means (reference 6).
This embodiment of the method as in the present invention has the advantage of allowing checking if the opening operation of the switching device is determined by the selected sequence or by events not desired, such as, for example, a protection tripping event. In this case, the quantity of residual flux present in the core of the magnetic current would be unknown: closing with a sequence of moments selected basing on the previous opening sequence could not be a correct choice.
Referring to figure 3, a further embodiment of the method as in the present invention is presented. In this embodiment, after the selection of a predefined closing operation sequence, it is provided (reference 30), the execution of said first predefined selected closing operation sequence. Then (reference 31), third data (dotted arrow 32) are acquired from detecting means 33 that can be represented, for example, by current and/or voltage transducers. Third data 32 are related to the amplitude of the electrical transients due to the execution of the first predefined closing operation sequence at step 30. If the value of third data .JL, IAC.CU a Pr, Ud -IiU III.sII IU t LII,II, at i ,p a lulitc1L Il III- Oj .%J1 .UIUL.
WO 01/16975 PCT/EP00/07172 sequence is determined for possible use in the next closing operation. The closing operation sequence can be one or those already predefined on the first storage means 5 or, alternatively, calculated from the previous by incremental calculations 35, using for example iterative mathematical methods.
Steps 30-34 can be repeated, if data 32 exceed said threshold again, determining, at every loop, a new further closing operation sequence. This embodiment is particularly advantageous because it uses an adaptive approach for choosing the most appropriate closing operating sequence. In practice, it is chosen the closing operation sequence, which does not cause transients to overcome a predefined i0 threshold.
The method as in the present invention has proven to be actually effective in reducing the current transients to negligible values, if compared to the inductive component rated current, particularly in three-phase applications such as power transformers disposed on medium voltage distribution networks. A reduction of the transient effects of more the 70% has been measured in this kind of applications. Moreover also the harmonic content has been measured at negligible values, so as allowing an easy and less expensive protection management.
The method as in the present invention can also be implemented easily adopting processing systems of common use. With reference to figure 4, a diagram of a control device 39 implementing the method as in the present invention is presented. It can be noticed an electrical network 40 (either mono-phase or three-phase) on which a switching device 41 and an inductive component 42 are connected. Preferably the control device 39 (see the dotted line) comprises, connected to a processing unit 43, said detecting means 33 for acquiring said third data 32 and detecting and said alarm means 21 for acquiring said second data 22. The processing unit 43 can be represented by a microprocessor controller able, following a trip command, to select a opening and/or closing operation sequence. The control device coinprises said firisi. Sioiage icans ABBOO 117/WO containing said opening/closing operation sequences and said second storage means (reference 50) for memorising said first data 2. First and second storage means can be comprise in the processing unit 43 (as describe in figure 4) or be connected separately.
The foregoing description of preferred embodiments of the present invention has been presented for purposes of illustration. It is not intended to be exhaustive or to limit the invention to the precise form disclosed and obviously many modifications and variations are possible in light of the above teaching.
In practice many variations may suggest themselves to those skilled in the art to within the scope of the invention disclosed herein.
In the claims which follow and in the preceding description of the invention, except where the context requires otherwise due to express language or necessary implication, the word "comprise" or variations such as "comprises" or "comprising" is used in an inclusive sense, i.e. to specify the presence of the stated features but not to preclude the presence or addition of further features in various embodiments of the invention.
It is to be understood that, if any prior art publication is referred to herein, such reference does not constitute an admission that the publication forms a part of S the common general knowledge in the art, in Australia or any other country.
9 10/05/04\rrlbfiles\homS\Priyanka\Kcep\speci\65666-OO.dc 10/05/04
Claims (14)
1. A method for controlling the closing operation of a switching device, said switching device being disposed on a electrical network, said electrical network being connected to an inductive component, comprising the following steps: a) acquiring first data related to the electrical characteristics of said inductive component and said network; b) based on said first data, selecting, on predefined first storage means containing opening and closing operation sequences, a first predefined opening operation sequence; c) based on said first predefined opening operation sequence, selecting, on said first storage means, a first predefined closing operation sequence.
2. A method according to claim 1 characterised in that said first data related to the electrical characteristics comprises: s15 -data related to the type of connection of said inductive component to said electrical network; and/or -data related to the state of the neutral connection of said electrical network; and/or -data related to the network impedance voltage, rated voltage and rated power.
3. A method according to claim 1 or claim 2, characterised in that said predefined opening sequences are predefined sequences of moments in which voltage and/or current reaches desired values.
4. A method according to any one of the previous claims, characterised in that said predefined closing sequences are predefined sequences of moments in which voltage reaches desired values.
A method according to claim 4, characterised in that at least one or more of said predefined closing operation sequences is a general purpose predefined closing operation sequence, said general purpose predefined closing operation 10/05/04\nclb_files\homel\Priyanka\Keep\speci5666-0.doc 10/05/04 ABB00117/WO sequence being used when the magnetisation state of said inductive component is unknown and being predefined in order to maintain transients, due to a closing operation, below a threshold level.
6. A method according to claim 4, characterised in that at least one or more of said predefined closing sequences takes into account the magnetisation state of said inductive component.
7. A method according to any one of the previous claims, characterised in that it comprises the following steps: -executing said first predefined opening operation sequence; and -acquiring and checking second data, related to said opening operation sequence; and alternatively -if said first opening operation sequence has been correctly executed, selecting the corresponding first predefined closing operation sequence; or -if said first opening operation sequence has not been correctly executed, selecting said general purpose predefined closing operation sequence.
8. A method according to any one of the previous claims, characterised in that it comprises the following steps: -executing said first predefined closing operation sequence; and -acquiring and checking third data, related to the amplitude of the transients due to the execution of said first predefined closing operation sequence; and -if said third data exceed a predefined threshold, determining a further closing operation sequence for possible use in the next closing operation.
9. A method according to claim 8, characterised in that said further closing operation is predefined and selected on said first storage means.
10. A method according to claim 8, wherein said further closing operation is determined by incremental calculations.
11. A method according to claim 6, characterised in that said general purpose predefined closing operation sequence is used at the starting-up of said inductive component. 11 10/o0lo4\'mlb files homeS\Piyanka\Kp\spec?\65666-O doc 10/05/04 ABB00117/WO
12. A control device for executing a method according to any one of the previous claims, characterised in that it comprises: -said predefined first storage means containing said opening/closing operation sequences; and -second predefined storage means for memorising said first data related to electrical characteristics of said network and said inductive component; and -a processing unit which, following a trip command, selects one of the predefined opening/closing operation sequences; and -detecting and alarm means for acquiring and checking said second data 0o related to the execution of an opening operation; and -detecting means for acquiring said third data related to the electrical transients due to the execution of a closing operation.
13. A method as claimed in any one of claims 1 to 12 and substantially as herein described with reference to the accompanying drawings.
14. A control device as claimed in claim 12, and substantially as herein described with reference to the accompanying drawings. Dated this 10th day of May 2004 ABB T D TECHNOLOGIES LTD. 2 By their Patent Attorneys GRIFFITH HACK Fellows Institute of Patent and Trade Mark Attorneys of Australia 4o 0 a 90000 12 10/0/04\OWclb-file\hOme\Priywnka\Kccp\spi\6666OO.doc 05/04
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP99202828A EP1081727B1 (en) | 1999-09-01 | 1999-09-01 | Method for controlling the operation of a switching device |
EP99202828 | 1999-09-01 | ||
PCT/EP2000/007172 WO2001016975A1 (en) | 1999-09-01 | 2000-07-25 | Method for controlling the operation of a switching device |
Publications (2)
Publication Number | Publication Date |
---|---|
AU6566600A AU6566600A (en) | 2001-03-26 |
AU774917B2 true AU774917B2 (en) | 2004-07-15 |
Family
ID=8240593
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU65666/00A Ceased AU774917B2 (en) | 1999-09-01 | 2000-07-25 | Method for controlling the operation of a switching device |
Country Status (8)
Country | Link |
---|---|
US (1) | US6693777B1 (en) |
EP (1) | EP1081727B1 (en) |
AT (1) | ATE310315T1 (en) |
AU (1) | AU774917B2 (en) |
CA (1) | CA2383768A1 (en) |
DE (1) | DE69928393T2 (en) |
ES (1) | ES2252912T3 (en) |
WO (1) | WO2001016975A1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2270561T3 (en) * | 1999-12-23 | 2007-04-01 | Abb Technology Ag | DEVICE TO CONTROL THE OPENING / CLOSURE OPERATION OF AN ELECTRICAL SWITCH AND RELATED METHOD. |
US20060012931A1 (en) * | 2004-07-15 | 2006-01-19 | Engel Joseph C | Three-pole circuit interrupter |
EP1819022B1 (en) * | 2006-02-08 | 2015-09-23 | ABB Technology AG | Establishing switchyard zones of a high or medium voltage switchyard |
EP3358588A1 (en) | 2017-02-02 | 2018-08-08 | ABB Schweiz AG | Three-phase circuit breaker with phase specific switching |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4105697A1 (en) * | 1991-02-21 | 1992-08-27 | Elektro App Werke Veb | Synchronised safety vacuum switching panel with individual magnetic drives - each having control unit deriving signals from movement, drive and load parameters for comparison with reference values |
WO1999000811A1 (en) * | 1997-06-25 | 1999-01-07 | Nkt Research Center A/S | A method of connecting and disconnecting an ac voltage to/from a load, as well as a switch comprising a relay |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5734207A (en) * | 1994-05-06 | 1998-03-31 | Miklinjul Corporation | Voltage polarity memory system and fuse-switch assembly usable therewith |
FR2773638B1 (en) * | 1998-01-12 | 2000-04-07 | Gec Alsthom T & D Sa | METHOD FOR SYNCHRONOUS CLOSING OF CIRCUIT BREAKER |
-
1999
- 1999-09-01 ES ES99202828T patent/ES2252912T3/en not_active Expired - Lifetime
- 1999-09-01 EP EP99202828A patent/EP1081727B1/en not_active Expired - Lifetime
- 1999-09-01 DE DE69928393T patent/DE69928393T2/en not_active Expired - Lifetime
- 1999-09-01 AT AT99202828T patent/ATE310315T1/en not_active IP Right Cessation
-
2000
- 2000-07-25 US US10/069,722 patent/US6693777B1/en not_active Expired - Lifetime
- 2000-07-25 CA CA002383768A patent/CA2383768A1/en not_active Abandoned
- 2000-07-25 WO PCT/EP2000/007172 patent/WO2001016975A1/en active IP Right Grant
- 2000-07-25 AU AU65666/00A patent/AU774917B2/en not_active Ceased
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4105697A1 (en) * | 1991-02-21 | 1992-08-27 | Elektro App Werke Veb | Synchronised safety vacuum switching panel with individual magnetic drives - each having control unit deriving signals from movement, drive and load parameters for comparison with reference values |
WO1999000811A1 (en) * | 1997-06-25 | 1999-01-07 | Nkt Research Center A/S | A method of connecting and disconnecting an ac voltage to/from a load, as well as a switch comprising a relay |
Also Published As
Publication number | Publication date |
---|---|
DE69928393D1 (en) | 2005-12-22 |
ATE310315T1 (en) | 2005-12-15 |
CA2383768A1 (en) | 2001-03-08 |
ES2252912T3 (en) | 2006-05-16 |
EP1081727A1 (en) | 2001-03-07 |
EP1081727B1 (en) | 2005-11-16 |
AU6566600A (en) | 2001-03-26 |
WO2001016975A1 (en) | 2001-03-08 |
DE69928393T2 (en) | 2006-07-27 |
US6693777B1 (en) | 2004-02-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU650830B2 (en) | Solid state current controlled interrupter | |
US7880343B2 (en) | Drive isolation transformer controller and method | |
US20040169987A1 (en) | Electronic relay controller | |
US20030123212A1 (en) | Control system for electrical switchgear | |
AU774917B2 (en) | Method for controlling the operation of a switching device | |
CN114204532A (en) | Distribution circuit for reducing starting impact current of transformer in radar system | |
US6911810B2 (en) | Reduction of energization transients in a three phase Y-connected load | |
GB2294166A (en) | AC electric power switching arrangement; avoiding inrush currents in inductive loads | |
CN211744147U (en) | Control device for closing and cutting off no-load transformer at specified phase | |
RU2093943C1 (en) | Method for reducing making current during repeated on/off switching of transformer | |
JP2792182B2 (en) | Overcurrent limiting device | |
EP4401255A1 (en) | Solid-state circuit breaker and control method therefor | |
JPH10164754A (en) | Rush current preventing device for single-phase transformer | |
JPH11225432A (en) | Transformer rush current reduction method | |
JP2986424B2 (en) | Voltage controller | |
RU2340028C1 (en) | Method of short circuit current limitation in main | |
EP1890214A1 (en) | Signal generation unit and method to generate a data signal in a control unit of a power system device | |
SU1614069A1 (en) | Method of setting under voltage a power line with shunt reactors | |
JP2005192318A (en) | Throw-in method of three-phase transformer, and device thereof | |
JPH05153796A (en) | Switching method for commercial power operation and inverter operation of motor | |
GB2515912A (en) | Switching power transformers | |
SU1614139A1 (en) | Method of controlling power supply system of arc steel-melting furnace | |
CN110535110A (en) | Extra-high-voltage alternating current transformer option principle control method and device | |
JP2020181729A (en) | Transformer device and power-on method thereof | |
JPS60207418A (en) | Device for protecting main circuit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FGA | Letters patent sealed or granted (standard patent) | ||
PC | Assignment registered |
Owner name: ABB SCHWEIZ AG Free format text: FORMER OWNER(S): ABB T & D TECHNOLOGY LTD |
|
MK14 | Patent ceased section 143(a) (annual fees not paid) or expired |