AU2018420117B2 - Dual electrohydraulic vehicle for tunnelling and roof reinforcement - Google Patents

Dual electrohydraulic vehicle for tunnelling and roof reinforcement Download PDF

Info

Publication number
AU2018420117B2
AU2018420117B2 AU2018420117A AU2018420117A AU2018420117B2 AU 2018420117 B2 AU2018420117 B2 AU 2018420117B2 AU 2018420117 A AU2018420117 A AU 2018420117A AU 2018420117 A AU2018420117 A AU 2018420117A AU 2018420117 B2 AU2018420117 B2 AU 2018420117B2
Authority
AU
Australia
Prior art keywords
vehicle
fortification
chassis
drilling
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU2018420117A
Other versions
AU2018420117A1 (en
Inventor
Fernando Misael DIAZ LOPEZ
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Resemin SA
Original Assignee
Resemin SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Resemin SA filed Critical Resemin SA
Publication of AU2018420117A1 publication Critical patent/AU2018420117A1/en
Application granted granted Critical
Publication of AU2018420117B2 publication Critical patent/AU2018420117B2/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • E21B7/025Rock drills, i.e. jumbo drills
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • E21B7/022Control of the drilling operation; Hydraulic or pneumatic means for activation or operation
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/04Supports for the drilling machine, e.g. derricks or masts specially adapted for directional drilling, e.g. slant hole rigs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • E21D20/006Machines for drilling anchor holes and setting anchor bolts having magazines for storing and feeding anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/08Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
    • E21B19/087Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods by means of a swinging arm

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Steering-Linkage Mechanisms And Four-Wheel Steering (AREA)
  • Tunnel Furnaces (AREA)
  • Fittings On The Vehicle Exterior For Carrying Loads, And Devices For Holding Or Mounting Articles (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention relates to a dual electrohydraulic vehicle for use in the stages of tunnelling and roof reinforcement in underground mining. The vehicle comprises two electrohydraulic systems, one for face drilling and another for rock support (also called roof reinforcement), which are joined to the vehicle by the front part of the chassis. The dual vehicle reduces the amount of equipment involved in the mining cycle, reducing inventory costs for spare parts, maintenance costs and operation costs, as well as dead time during the transport of equipment, thereby increasing productive time.

Description

DUAL ELECTROHYDRAULIC VEHICLE FOR TUNNEL DEVELOPMENT AND ROOF FORTIFICATION
Technical Field A dual electro-hydraulic vehicle, capable of performing tunnel development and roof fortification work; applicable in underground mining. The self-propelled vehicle consists of a front chassis with two wheels and a rear chassis with two wheels, which are linked together by a central joint.
Background of the Invention - State of the Art The present disclosure is related to electro-hydraulic vehicles that perform mineral exploitation works in the mining sector. It is important to take into consideration that this equipment performs a series of processes in a cyclical manner known as the mining cycle, which are described below:
It starts with Process 1: related to the development of the tunnel, using electro-hydraulic front face drilling vehicles - Figure 1, Figure 2 and Figure 6 - which are responsible for drilling horizontally into the rock in the direction desired by geology area in charge of the mine. Continuing with Process 2 within this cycle is the so-called blasting activity; in this process the dynamite is loaded and installed in the holes made by the electro-hydraulic front face o drilling vehicles (Process 1). The next step after installation is the detonation of the dynamite, thus ending the blasting process. Process 3 is the hauling of rocks outside the tunnel. This can be done by a low-profile front loader called Scoop and a mining truck. Once the working area is cleared and cleaned Process 4 called roof support - Figure 3, Figure 4 and Figure 7 - is started using a fourth model of electro-hydraulic vehicles with the necessary accessories to fortify the tunnel roofs, with this last process the mining cycle is complete.
Having described the mining stages, it is clear that several electro-hydraulic vehicles are required; where at least one electro-hydraulic vehicle is needed for the front face drilling and another for the roof fortification stage, increasing the amount of equipment according to the size of the tunnel section. As more vehicles become part of the mining site fleet, the transfer time, inventory costs, maintenance costs, labor costs and related indirect costs will increase. In addition, the mining process times are increased with the movement of all related vehicles within the mining cycle. Therefore, the less equipment working in the mining cycle, the shorter the mining time will be, making it more productive.
16726059_1 (GHMatters) P114478.AU
As background of electro-hydraulic vehicles performing work in underground mining and tunnel development, front face drilling vehicles are known to exist as demonstrated in the patent EP0203907 entitled "Drill wagon for drilling excavation and rockbolt holes". In the same line, some models can be found in the current market such as: Troidon 66 (manufacturer Resemin), Boomer S1D (manufacturer Atlas Copco), and Axera DD310 (manufacturer Sandvik). However, these machines only have the capacity to perform the front face drilling stage which has been described as process 1 of the mining cycle.
On the other hand, it is known that there are other electro-hydraulic vehicles with the capacity to develop the process of roof fortification or support described as process 4 in the mining cycle. There is a patent US4229124 entitled "Automatic RoofBolting system for mines", which, refers to a jumbo model that has an OEM design,and is used specifically for roof fortification or support. In the market, the most accepted brands of this type of equipment are the manufacturers Bolter 88 (manufacturer Resemin), Boltec H235 (manufacturer Atlas Copco), Robolt SD310 (manufacturer Sandvik), which, like the mentioned patent, can only be used in the support stage.
Finally, it is necessary to point out that in underground mining the types of electro-hydraulic drilling and roof fortification vehicles are known as "Jumbos". An example of this is patent CA2879241 Al, entitled "Drill positioning system forjumbo carrier unit". In the claims we will use this term for a better description.
Summary of the Disclosure In broad terms, the present invention discloses a single dual electro-hydraulic vehicle capable of performing both the front face drilling process (see for example Figure 1) and the roof fortification process(see for example - Figure 3) for application in construction and underground mining.
The disclosure provides a dual electro-hydraulic vehicle with the capacity to perform the development of tunnels or front face drilling works as well as to perform roof fortification works, includes: a front face drilling unit which consists of a telescopic arm, a simple or telescopic beam, where the simple beam consists of a single beam having the necessary dimensions to use 10-, 12-, 14- or 16- foot drill rods and the telescopic beam consists of two beams assembled on top of each other with the ability to expand and contract, and a hydraulic drill which moves along the beam when the front-end is drilled; and a roof support and fortification
16726059_1 (GHMatters) P114478.AU unit consisting of a second telescopic arm, two guide beams arranged in parallel where the first one supports and moves the drilling equipment capable of performing mechanized drilling and the second guide beam supports and moves the bolting equipment in charge of inserting a bolt in the previously mechanized hole.
The vehicle that is the subject of the invention consists of a heavy-duty articulated chassis (30), 4WD, self-propelled with a diesel engine (36), with oscillating front and rear axles, two telescopic arms the first one capable of performing the front face drilling process (31) comprising a beam, which can be simple or telescopic (32), wherein the simple beam consists of a single beam having the necessary dimensions to use 10-, 12-,14- or 16- foot drill rods according to the client's needs, while the telescopic beam consists of two parallel and aligned beams assembled on top of each other having the property of extending and contracting which allows for different length dimensions making possible to use different lengths of drilling rods. This system works in a horizontal position and has a parallelism system, which allows that when lifting or lowering the arm, the guide beam (32) and the hydraulic drill (33) mounted on it, not to lose the horizontal position. The second arm (34) is responsible for carrying out the mechanized fortification of the roof (figure 3), having two parallel beams and two hydraulic drills the first hydraulic drill being used to mechanize the drilling and the second drill being used to insert the bolt or anchor in the hole previously mechanized by the first drill. A pivoting support, which is regulated so that when pivoting, both drills and the cartridge launcher tube are concentric. A cartridge launcher tube that is a complement to the process, the application of which is to inject resin and cement cartridges into the previously mechanized hole; after that the helical type anchor bolt is inserted. In addition, it has a semiautomatic bolt feeding system (40), that makes the work of roof support and rock fortification safer and faster, avoiding the operator to manually feed the equipment with bolts to perform the support. Both telescopic arms are installed on the front of the chassis - Figure 8.
Through this disclosure, the problems or difficulties mentioned in the state of the art are ameliorated, such as reducing the fleet of electro-hydraulic vehicles involved in the mining cycle (specifically, in the process 1 of tunnel development and the process 4 of support and fortification of roofs in underground mining or civil construction), which would reduce the costs of inventory for spare parts, maintenance costs of equipment maintenance and operating labor, among other indirect costs. In addition, production times for the mining cycle will be improved by using and moving a single piece of equipment for both tunnel development and roof fortification, instead of using a different piece of equipment for each process.
16726059_1 (GHMatters) P114478.AU
Also disclosed herein is a dual electro-hydraulic vehicle with the capacity to perform the development of tunnels or front face drilling works as well as to perform roof fortification works, includes: a front face drilling unit which comprises of a telescopic arm, a simple or telescopic beam, where the simple beam comprises of a single beam having the necessary dimensions to use 10-, 12-, 14- or 16- foot drill rods and the telescopic beam comprises two beams assembled on top of each other with the ability to expand and contract, and a hydraulic drill which moves along the beam when the front-end is drilled; and a roof support and fortification unit comprises a second telescopic arm, two guide beams arranged in parallel where the first one supports and moves the drilling equipment capable of performing mechanized drilling and the second guide beam supports and moves the bolting equipment in charge of inserting a bolt in the previously mechanized hole.
Brief Description of the Drawings In order to facilitate the understanding of the characteristics of the invention, a set of drawings is attached to the present descriptive report, in which the following has been represented for illustrative and not restrictive purposes:
- FIGURE 1 shows an electro-hydraulic front face drilling vehicle, in proper working position (jacks extended) performing the front face drilling stage to continue the advance and development of the tunnel (indicated as Process 1 within the mining cycle - Figure 5). The vehicle is a front face drilling vehicle of the Resemin brand and model Troidon 55. - FIGURE 2 shows an electro-hydraulic tunnel development vehicle, also called a jumbo front face drilling vehicle. This vehicle consists of a front chassis and a rear chassis, linked together by a central joint. There is a telescopic arm (12) on the front chassis which is used to move and position the beam (13) either simple or telescopic to perform the front face drilling operation, this must always maintain the horizontal position. The beam is used to advance the hydraulic drill (14) when drilling. In the rear chassis there is the diesel engine (15) and the transmission box having the function of moving the equipment; an electro-hydraulic unit (16) also known as Power Pack, which is driven by electric energy from the mine or worksite, transmitted to the equipment by means of the electric cable reel (17). - FIGURE 3 shows an electro-hydraulic bolter vehicle, in proper working position, performing the work of roof fortification or also called rock support within a mining tunnel
16726059_1 (GHMatters) P114478.AU
(Process 4 within the mining cycle - Figure 5). It can be observed that previously the roof of the tunnel has been supported with helical bolts and continues with the advance every 1.2 meters. For this case; this vehicle is a Resemin Bolter model 88. - FIGURE 4 shows an electro-hydraulic vehicle for roof fortification in tunnels. This vehicle consists of a front chassis and a rear chassis, linked together by a central joint. On the front chassis it has an extendable telescopic arm (21), with a bolting column, composed by two guide beams (22) having the function of guiding and advancing the drilling and bolting, on each beam, it has a hydraulic drill (23), to make the holes and another one for bolting; in parallel it has a cartridge launcher tube. Also in the lower part of the chassis it has two front wheels (24) for moving the equipment. In the rear chassis, there is the diesel engine (25), coupled to the transmission box (26) which is in charge of transmitting the power to the front and rear differentials and these to the respective wheels to provide displacement to the equipment. It also has an electro hydraulic unit (27), which is composed of an electric motor and an axial piston pump, also called Power Pack, which is fed by electric energy from the mine that is sent through the cable reel (28). - FIGURE 5 shows the mining cycle, specifying 4 main processes. Process 1 is the development of the tunnel front, which as a first step is the drilling of the rock, for this work the front face drilling electrohydraulic vehicles are used. The Process 2 is the blasting; this is a work of installation of the dynamite in the holes made by the front face drilling equipment. Process 3 is the hauling or cleaning process, where the rocks resulting from the blasting are dragged to the outside of the tunnel, and Process 4 is the fortification of the roof and support, which consists of placing anchor bolts on the tunnel roofs to prevent the collapse or fall of rocks where the electro-hydraulic vehicles of support and roof fortification work. According to the previous explanation, in the world market two vehicles are used, one for each process (front face drilling and development of the tunnel and roof fortification) so the reason for this invention is to present in only one vehicle the application of both processes. - FIGURE 6 shows the electro-hydraulic vehicle subject of the invention, exposing in this figure one of the two telescopic boom arms extended to the upper right side and with the front (42) and rear (43) positioning cylinders extended in working position; which is in charge of the front face drilling process and tunnel development. - FIGURE 7 shows the electro-hydraulic vehicle subject of the invention with one of the two telescopic booms in the working position and showing the reach and working area
16726059_1 (GHMatters) P114478.AU depending on the size of the bolt to be used. The equipment can be available for 7-, 8 ,10- foot bolts. This process is called rock fortification or roof support. - FIGURE 8 shows the electro-hydraulic vehicle subject of the invention, consisting of two chassis, which are articulated with each other by means of a vertical axle (30). On the front chassis, there are two Boom arms, the first telescopic Boom arm for the front face drilling application (31), having two guide beams (32) in a telescopic way, in charge of advancing the drill (33). On the other hand, there is the Boom arm or bolting turret (34) having two parallel guide beams that advance the drilling and bolting equipment (35), it also contains a canopy type operator's cab (41) protecting the operator from possible rock falls and equipment overturning. On the rear chassis, there is the diesel engine (36) with the function of moving the equipment to the work site the equipment has R20 wheels and rim (37), ideal for avoiding unevenness and obstructions in the work site. It also has an electric cable reel (38) and a water reel (39). - FIGURE 9 shows the electro-hydraulic vehicle subject of the invention as in image 6, with a 3D view.
It is to be understood that, if any prior art publication is referred to herein, such reference does not constitute an admission that the publication forms a part of the common general knowledge in the art, in Australia or any other country.
In the claims which follow and in the preceding description of the invention, except where the context requires otherwise due to express language or necessary implication, the word "comprise" or variations such as "comprises" or "comprising" is used in an inclusive sense, i.e. to specify the presence of the stated features but not to preclude the presence or addition of further features in various embodiments of the invention.
16726059_1 (GHMatters) P114478.AU

Claims (4)

1. A dual electro-hydraulic vehicle with the capacity to perform the development of tunnels or front face drilling works as well as to perform roof fortification works, includes:
a front face drilling unit which consists of a telescopic arm, a simple or telescopic beam, where the simple beam consists of a single beam having the necessary dimensions to use 10-, 12-, 14- or 16- foot drill rods and the telescopic beam consists of two beams assembled on top of each other with the ability to expand and contract, o and a hydraulic drill which moves along the beam when the front-end is drilled; and
a roof support and fortification unit consisting of a second telescopic arm, two guide beams arranged in parallel where the first one supports and moves the drilling equipment capable of performing mechanized drilling and the second guide beam supports and moves the bolting equipment in charge of inserting a bolt in the previously mechanized hole.
2. The dual electrohydraulic vehicle of Claim 1, further comprising:
a front chassis, wherein the front chassis consists of a pair of wheels, positioning cylinders, an operator's cab, a telescopic arm capable of performing front face o drilling or tunneling works, and a telescopic arm capable of performing roof support and fortification, mounted on that chassis; and
a rear chassis located to the rear of the front chassis according to the direction of movement, where the rear chassis is made up of a pair of wheels, positioning cylinders, two electro-hydraulic units also called powerpacks, an electric cable reel, and a diesel engine for moving the vehicle,
wherein both chassis are articulated to each other, of the jumbo type, by means of a vertical axle.
18812620_1 (GHMatters) P114478.AU
3. The dual electro-hydraulic vehicle of claim 1 or 2, wherein the fortification and support unit contains a cartridge launcher tube, whose function is to inject a resin and cement cartridge into the previously drilled hole, and then insert a bolt.
4. The dual electro-hydraulic vehicle of any one of the preceding claims, wherein the fortification and support unit contains a semi-automatic bolt feeding system as well, which automates the operator's process of inserting one bolt per working cycle.
18812620_1 (GHMatters) P114478.AU
AU2018420117A 2018-04-24 2018-04-24 Dual electrohydraulic vehicle for tunnelling and roof reinforcement Ceased AU2018420117B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/PE2018/000008 WO2019209124A1 (en) 2018-04-24 2018-04-24 Dual electrohydraulic vehicle for tunnelling and roof reinforcement

Publications (2)

Publication Number Publication Date
AU2018420117A1 AU2018420117A1 (en) 2020-11-26
AU2018420117B2 true AU2018420117B2 (en) 2022-07-21

Family

ID=68295629

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2018420117A Ceased AU2018420117B2 (en) 2018-04-24 2018-04-24 Dual electrohydraulic vehicle for tunnelling and roof reinforcement

Country Status (8)

Country Link
US (1) US20210032933A1 (en)
AU (1) AU2018420117B2 (en)
BR (1) BR112020020492A2 (en)
CA (1) CA3096766A1 (en)
CO (1) CO2020012336A2 (en)
MX (1) MX2020010306A (en)
PE (1) PE20200969Z (en)
WO (1) WO2019209124A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681987B (en) * 2021-03-22 2021-06-22 湖南鹏翔星通汽车有限公司 Translation slewer for rock drill
CN115680486B (en) * 2021-07-30 2025-05-27 江西蓝翔重工有限公司 A single-track seven-arm hydraulic anchor drilling vehicle with integrated advanced support and pressure relief
CN113669094B (en) * 2021-09-02 2024-02-06 安徽佳乐矿山设备有限公司 Propeller switching structure and anchor rod trolley using same

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110036608A1 (en) * 2008-05-09 2011-02-17 Nystroem Sven-Olov Rock drilling device and rock drilling rig and/or rock bolting rig comprising such device

Family Cites Families (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE343104B (en) * 1970-02-19 1972-02-28 Atlas Copco Ab
US3612190A (en) * 1970-04-24 1971-10-12 Mac Gordon Wills Rock drill supporting vehicles for cut-and-fill stopping operations
US3896885A (en) * 1970-12-11 1975-07-29 Skanska Cementgjuteriet Ab System for automatically aligning and/or moving in a parallel movement path a guide seating structure adapted for guiding the movement of a tool mounted thereon
US3880244A (en) * 1972-12-14 1975-04-29 Gardner Denver Co Telescopic rock drill feed
US3999805A (en) * 1974-11-26 1976-12-28 Lockwood Bennett Ltd. Articulated support
US3980142A (en) * 1975-09-10 1976-09-14 Grigoriev Vladimir Konstantino Drilling boom
US4069877A (en) * 1976-11-09 1978-01-24 Gardner-Denver Company Mechanism for tensioning fluid hoses on a rock drill feed
US4274494A (en) * 1977-05-16 1981-06-23 Atlas Copco Aktiebolag Method and device for setting the direction and/or the inclination of an elongated rock drilling apparatus
FR2452587A1 (en) * 1979-03-26 1980-10-24 Montabert Roger ARTICULATED SUPPORT ARM FOR DRILLING DEVICE SLIDE
US4436455A (en) * 1980-04-23 1984-03-13 Vance Ershell C Universally positionable low profile mine drilling machine and method
US4398850A (en) * 1981-02-09 1983-08-16 Copper Range Company Roof bolter and process
JP2729969B2 (en) * 1990-03-29 1998-03-18 株式会社高橋エンジニアリング Pile driver
SE516569C2 (en) * 2000-04-19 2002-01-29 Atlas Copco Rock Drills Ab Drill rig
US6447210B1 (en) * 2001-02-26 2002-09-10 Oldenburg Cannon, Inc. Resin nozzle positioner
AUPR576501A0 (en) * 2001-06-18 2001-07-12 Russell Mineral Equipment Pty Ltd Rock bolting apparatus and method
FR2862337B1 (en) * 2003-11-18 2006-01-20 Sandvik Tamrock Secoma Sas DRILLING AND BOLTING HEAD FOR BOLTING MACHINE
US7874379B2 (en) * 2005-03-11 2011-01-25 Atlas Copco Rock Drills Ab Damping device for an output shaft in a gearbox
FI123637B (en) * 2006-11-02 2013-08-30 Sandvik Mining & Constr Oy Cement silo construction for a mining machine
AU2008288665A1 (en) * 2007-08-21 2009-02-26 Sandvik Mining And Construction G.M.B.H. Armature boring and setting device
SE532412C2 (en) * 2008-05-09 2010-01-12 Atlas Copco Rock Drills Ab Rock drilling equipment
SE533447C2 (en) * 2008-10-29 2010-10-05 Atlas Copco Rock Drills Ab Injection device and drill rig for grouting
CN101832102B (en) * 2010-04-09 2013-04-24 闫振东 Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage
PH12013502559A1 (en) * 2011-06-14 2014-02-10 Shane Brown Resin injection apparatus for drilling apparatus for installing a ground anchor
CN202202808U (en) * 2011-08-25 2012-04-25 中国地质大学(武汉) Crawler three-arm multifunctional rock drilling trolley
US9777459B2 (en) * 2012-07-31 2017-10-03 Solar Foundations Usa, Inc Attachment for a skid steer loader and method of use thereof
AU2013204003B2 (en) * 2012-11-19 2014-11-13 Sandvik Intellectual Property Ab A machine and method for installing rock bolts
US9810024B2 (en) * 2015-03-31 2017-11-07 Caterpillar Global Mining America Llc Drill system
CN105804764B (en) * 2016-03-14 2017-12-19 中国矿业大学 One kind bores the formula development machine that rises

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110036608A1 (en) * 2008-05-09 2011-02-17 Nystroem Sven-Olov Rock drilling device and rock drilling rig and/or rock bolting rig comprising such device

Also Published As

Publication number Publication date
WO2019209124A1 (en) 2019-10-31
BR112020020492A2 (en) 2021-01-12
PE20200969Z (en) 2020-09-28
CO2020012336A2 (en) 2021-02-26
US20210032933A1 (en) 2021-02-04
MX2020010306A (en) 2021-01-15
CA3096766A1 (en) 2019-10-31
AU2018420117A1 (en) 2020-11-26

Similar Documents

Publication Publication Date Title
AU2018420117B2 (en) Dual electrohydraulic vehicle for tunnelling and roof reinforcement
CN113898390B (en) Mining automatic collaborative drilling and anchoring robot
CN101832102B (en) Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage
CN101191416A (en) Rock lane digging method
CN105637166A (en) Raise boring machine with changeable length, method and raise boring rig
US20240200450A1 (en) Tunnel excavation device
KR101333096B1 (en) Steel wire supplying apparatus for assembling segments of shield tunnel, and method using the same
CN112343613A (en) Construction method combining shield method and spray anchor support
CN207526503U (en) A kind of returnable push-bench
CN204082206U (en) A kind of waste stone exhaust system for blind slope development shaft building
CN103016019A (en) Heading and anchoring integrated machine
CN211474117U (en) Cantilever heading machine with supporting boots
CN211648172U (en) Ten-arm tunneling and tracing machine
CN208456613U (en) A kind of Mechanized roadway layout structure
US3811290A (en) Multi-purpose vehicle for use underground
CN107269286B (en) A kind of piping stretch system for tunnel piercing
US3877717A (en) Multi-purpose vehicle for use underground
JP3512012B2 (en) How to excavate
CN115306416A (en) A mine full-section rock tunnel boring machine and its initial excavation method
CN110966013A (en) Cantilever tunneling machine with supporting shoes and construction method thereof
CN222481299U (en) Drilling and charging integrated trolley
JP2001323773A (en) Tunnel excavation method utilizing advancing drift
CN221053687U (en) Hidden well heading machine starting trolley and hidden well heading machine
WO2025080148A1 (en) Dual electrohydraulic vehicle for rock clearing and roof reinforcement
Walker Mining machines for small spaces

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)
MK14 Patent ceased section 143(a) (annual fees not paid) or expired