AU2015298233B2 - Method for volumetric grid generation in a domain with heterogeneous material properties - Google Patents
Method for volumetric grid generation in a domain with heterogeneous material properties Download PDFInfo
- Publication number
- AU2015298233B2 AU2015298233B2 AU2015298233A AU2015298233A AU2015298233B2 AU 2015298233 B2 AU2015298233 B2 AU 2015298233B2 AU 2015298233 A AU2015298233 A AU 2015298233A AU 2015298233 A AU2015298233 A AU 2015298233A AU 2015298233 B2 AU2015298233 B2 AU 2015298233B2
- Authority
- AU
- Australia
- Prior art keywords
- grid
- material property
- faults
- mesh
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
- 238000000034 method Methods 0.000 title claims abstract description 44
- 239000000463 material Substances 0.000 title claims abstract description 36
- 238000013461 design Methods 0.000 claims abstract description 41
- 238000013507 mapping Methods 0.000 claims abstract description 24
- 230000035699 permeability Effects 0.000 claims abstract description 4
- 239000011435 rock Substances 0.000 claims description 11
- 238000005070 sampling Methods 0.000 claims description 9
- 238000011161 development Methods 0.000 claims description 7
- 238000001125 extrusion Methods 0.000 claims description 7
- 239000004215 Carbon black (E152) Substances 0.000 claims description 6
- 229930195733 hydrocarbon Natural products 0.000 claims description 6
- 150000002430 hydrocarbons Chemical class 0.000 claims description 6
- 238000007620 mathematical function Methods 0.000 claims description 2
- 238000004088 simulation Methods 0.000 description 6
- 238000013459 approach Methods 0.000 description 5
- 238000012805 post-processing Methods 0.000 description 5
- 108050005509 3D domains Proteins 0.000 description 4
- 230000003044 adaptive effect Effects 0.000 description 4
- 230000008901 benefit Effects 0.000 description 4
- 238000007596 consolidation process Methods 0.000 description 4
- 239000012530 fluid Substances 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012935 Averaging Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000002776 aggregation Effects 0.000 description 1
- 238000004220 aggregation Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000008021 deposition Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005755 formation reaction Methods 0.000 description 1
- 230000014509 gene expression Effects 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000037361 pathway Effects 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000033458 reproduction Effects 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/05—Geographic models
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V20/00—Geomodelling in general
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/20—Finite element generation, e.g. wire-frame surface description, tesselation
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Geometry (AREA)
- Software Systems (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Graphics (AREA)
- Remote Sensing (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geophysics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Image Generation (AREA)
Abstract
Method for generating a 3D grid, and for defining a material property model on the grid, to use, for example, in a reservoir simulator. A mapping is defined (61, 71) to a design space in which the material property is described as a piecewise smooth implicit or explicit function in three dimensions. Grid geometry is constructed only in the physical space of the model (62-65, 73-76), and no grid is required in the design space. The material property, for example permeability, is sampled in the design space (66, 77) to populate the cells in the grid constructed in the physical domain. Prismatic grid cells may be truncated based on faults and horizons (65), or maybe conformed to fault surfaces using a 3D parameterization of the model (76). Only forward mapping, i.e. from the physical domain to the design space, is required.
Description
FIELD OF THE INVENTION [0002] This disclosure relates generally to the field of hydrocarbon reservoir management or geophysical prospecting and, more particularly, to reservoir simulation. Specifically, the disclosure relates to a method for constructing a conceptual 3-D grid that is adapted to a subsurface region’s material properties, where the grid may be used for reservoir simulation studies in reservoir exploration, development or production stages, as well as for representing a geologic model description of a reservoir structure and material properties. More specifically, the grid can carry a model of rock and fluid properties of a reservoir or can be used for numerical discretization of partial differential equations such as fluid flow or wave propagation.
BACKGROUND OF THE INVENTION [0003] To create a model of the subsurface is to construct a discretized representation (volumetric grid) of a complex 3D domain which is adapted to the domain’s material properties such as permeability. In general, the domain is comprised of multiple separate volumetric pieces which may come in partial contact with each other, thus, forming a non-manifold topology. The domain’s material properties are described by a designer who can assign them to only one continuous volume at a time. Material properties are described as piecewise smooth implicit or explicit functions (e.g., piecewise constant) in 3D.
[0004] For example, in application to subsurface reservoir modeling, a 3D model domain is delineated by horizons and faults, where horizons are mostly flat horizontal surfaces related to deposition of sediment material forming a reservoir rock, and faults are discontinuities in the
WO 2016/018723
PCT/US2015/041831 rock introduced by non-depositional events. For a modeler to provide a description of rock properties in the subsurface domain, it is necessary to work in a continuous “depositional” space (i.e., a design space) where all the faults have been removed. Rock properties then can be described with the help of globally continuous trend functions and/or mesh dependent functional representations in this continuous space. A volumetric grid in physical space that conforms to the rock properties is required to carry out modeling and flow simulation studies. For purposes of this application, a grid is the conceptual subdivision of a subsurface region into adjacent discrete cells for the purpose of specifying a numerical value for one or more material properties of the subsurface such as rock type, permeability or porosity for each cell.
[0005] Related publications dealing with the same or similar technical problem include “Unstructured Cut-Cell Grids for Modeling Complex Reservoirs,” B.T. Mallison, C. Sword, T. Viard, W.J. Milliken, A. Cheng, SPE163642 (2013). The authors use GeoChron mapping, build a structured grid in a design space, and truncate it by images of fault surfaces, then map truncated cells back to real space and do complex post-processing on the fault surfaces. This approach is time consuming, and requires well-defined inverse mapping (back to real space) and complex geometric post-processing.
[0006] In US patent application publication US 2008/0021684 (“Method for building a three dimensional cellular partition of a geological domain,” by J.-C. Dulac, J.-L. Mallet), the authors define “parametric” mapping to design space (GeoChron), voxelize real space and sample cell ID or layer ID from the design space (partitioned into “parametric” cells, i.e. a Cartesian grid). They do not define cell geometry or topology in real space but instead do post-processing on the aggregations of voxels with the same cell ID to use them as cells in a flow simulator. This avoids the complexity of building the 3D simulation mesh in real space, requires voxelization (which requires accuracy of the mapping and/or inverse mapping) and post-processing of voxels into simulation cells by deducing or approximating their geometric and topological relationships, none of which is straightforward.
[0007] US Patent No. 7523024 to Endres et al., “Modeling geologic objects in faulted formations,” defines geological objects in real space (construct a geobody in design space, map it back to real space using inverse “paleo-transformation,” and trim the portions that map outside). Their approach requires inverse mapping, and does not go all the way to grid generation.
WO 2016/018723
PCT/US2015/041831 [0008] Patent application publication No. W02012/07821 to Wu et al. discloses mapping the physical domain to a continuous design space.
[0009] In summary, the main approach in the current advanced subsurface grid generation strategies is to define a two-way mapping to design space, build a volumetric grid in the design space, and populate it with properties, then map the grid geometry back to real space (as stairstep by Dulac et al. or as truncated by Mallison et al.). A more traditional approach is to define a grid in real space with standard layering methods (proportional, top- or bottom-conforming) without much regard for the property trends / shape of the geobodies, then map the grid to design space and populate it with properties.
SUMMARY OF THE INVENTION [0010] In the present invention, a grid geometry is constructed only in the physical space of the model, and no grid is required in the design space (especially if the functional property definition in design space is grid-free, i.e. can be represented by one or more mathematical expressions). The benefit is greater flexibility in handling complex geometries and less strict requirements on the quality of the mapping to design space (only forward mapping is required, backward mapping can be ill-defined).
[0011] In one embodiment, the invention is a method for generating a model of a material property of a subsurface region for hydrocarbon prospecting or reservoir development, said method comprising: (a) generating, using a computer, a mapping from a physical domain of the subsurface region, with faults, to a continuous design space in which all faults are removed; (b) describing the material property in the continuous design space as a piecewise smooth implicit or explicit function in three dimensions; (c) in the physical domain, constructing grid layering from the function describing the material property, said constructing comprising generating a twodimensional mesh and extruding it through the physical domain into the third dimension, building prismatic cell faces based on property contrasts, thereby subdividing the physical domain into prismatic grid cells, wherein the grid cells are truncated at faults, or the grid cells are conformed to fault surfaces using a parameterization of a 3D model domain, or a combination of both; (d) sampling the material property from the design space and populating the grid cells in the physical domain with material property values; (e) in the physical domain, identifying connectivity or each horizon across each fault by approaching the fault from both sides; and (f)
WO 2016/018723
PCT/US2015/041831 using the model of the material property for hydrocarbon prospecting or reservoir development in the subsurface region.
BRIEF DESCRIPTION OF THE DRAWINGS [0012] The advantages of the present invention are better understood by referring to the following detailed description and the attached drawings, in which:
Fig. 1 is a schematic diagram illustrating a mapping M of a domain with discontinuities into a continuous design space where the designer defines material properties F;
Figs. 2A-2C illustrate: (2A) Parallel rays for property sampling in one volume of the domain; (2B) Sampled property along the rays; and (2C) Grid resolving property contrasts;
Fig. 3 illustrates a truncated grid of a faulted reservoir showing consolidation between zones (connectivity across a horizon);
Figs. 4A-4B illustrate a truncated grid of a faulted reservoir using: (4A) adaptive areal resolution; (4B) layers reconstructed from continuous design space;
Figs. 5A-5B illustrate a conformal prismatic grid of a faulted reservoir using: (5A) adaptive areal resolution; (5B) layers reconstructed from a continuous design space;
Fig. 6 is a flow chart showing basic steps in an embodiment of the present inventive method for generating a truncated grid; and
Fig. 7 is a flow chart showing basic steps in an embodiment of the present inventive method for generating a conforming prismatic grid.
[0013] All drawings except Figs. 1, 6 and 7 are black-and-white reproductions of colored originals due to patent law restrictions on the use of color.
[0014] The invention will be described in connection with example embodiments. However, to the extent that the following detailed description is specific to a particular embodiment or a particular use of the invention, this is intended to be illustrative only, and is not to be construed as limiting the scope of the invention. On the contrary, it is intended to cover all alternatives, modifications and equivalents that may be included within the scope of the invention, as defined by the appended claims.
WO 2016/018723
PCT/US2015/041831
DETAILED DESCRIPTION OF EXAMPLE EMBODIMENTS [0015] Models of properties in a 3D domain are designed by, or under the control of, a human designer. To assist the property designer’s work, the original domain is mapped to a design space where all the separate volumes are pieced together based on some suitable geometric criterion. Figure 1 illustrates the mapping process in a schematic diagram. As a result of the designer’s work, the description of some physical property exists only in the design space. [0016] The grid of the original domain needs to be adapted to these volumetric properties, and material properties of the subsurface region need to be transferred onto this grid. Thus, the grid generation process includes a methodology for property sampling (through the mapping to the design space) and property feature reconstruction from this implicit definition of the material properties (composition of the mapping and functional property representation in the design space).
[0017] In the present invention, grid geometry is constructed only in the physical space of the model (as opposed to being built in a continuous space and mapped back to the physical space). The benefit is greater flexibility in handling complex geometries and reduction of tedious and non-intuitive geometric post-processing.
[0018] In more detail, the properties can be sampled along the sets of parallel rays which can be independent for different volumetric parts of the domain. The parallel rays for sampling the property are illustrated in Fig. 2A, and the sampled property along the rays is illustrated in Fig. 2B. The internal material structure is detected as the change in sampled properties. A grid is adapted to this structure by resolving surfaces of sharp property contrast with the cell faces; this is illustrated in Fig. 2C. The grid can also be adapted to properties with smoother value distribution by some grid optimization approach that adjusts cell sizes based on the property values.
Example application: Gridding a model of a faulted subsurface reservoir [0019] The present inventive method can be used to build a prismatic grid resolving layered media of a subsurface reservoir. The grid can be either truncated at the bounding surfaces or made to conform to the bounding surfaces of the 3D domain volumes, where the bounding surfaces are, for example, faults and horizons of a structural framework delineating volumes of a subsurface reservoir. In truncating a prismatic grid, the cells near the domain boundaries are
WO 2016/018723
PCT/US2015/041831 truncated (or cut) by those bounding surfaces. In conforming a prismatic grid, the cells are constructed in such a manner that their faces always lie on (conform to) the domain boundaries. The grid can be used in modeling, e.g. of the fluid flow pathways through the reservoir. This use includes reservoir simulation studies in reservoir exploration, development or production stages, but the grid can also be used for any representation of a geologic model description of a reservoir structure and material properties.
[0020] Before the grid can be built, it is necessary to generate a mapping to a continuous design space using a known technique, e.g., companion US patent application serial No. 62/073,465, entitled Methods to Handle Discontinuity in Constructing Design Space Using Moving Least Squares and companion US patent application serial No. 62/081,159, entitled Handling Domain Discontinuity with the Help of Grid Optimization Techniques, and define geologic concept and rock properties in the design space where faults are removed and depositional layers are continuous (e.g., US patent application publication No. 2013/0246031). (These three references are incorporated herein in all jurisdictions that allow it.) This is shown as the first step (61 and 71) in each of the flow charts (Ligs. 6 and 7) for two different embodiments of the present inventive method. This can be done by a zone of the model, a zone being a volume between two horizons. Thus, grid geometry generation is repeated for each zone. [0021] An advantage to the present inventive method is that the mapping strategy may be very simple and efficient because no reverse mapping (back to the functional domain) is required. The reverse mapping therefore can be ill-defined, for example two points in the physical domain may be mapped to the same point in the design space.
[0022] The designer’s work in each continuous design space corresponds to modeling a stratigraphic geologic concept, as described, e.g., in US patent application publication No. 2013/0246031, where the design space model of geologic concept contains a description of model regions and interfaces (surfaces) by means of mathematical functions. Generation of unstructured grids according to the present invention is discussed in more detail grid (for a zone or for the entire model volume) are as follows, with reference to the flow chart of Lig. 6:
Step 62: Generate a 2D mesh (in the physical domain) in an (x,y) plane of a bounding box around a volume part (fault block) or an entire model volume. The mesh can be adaptive to some property or density control, as is illustrated in Lig. 4A. The bounding box can be best
WO 2016/018723
PCT/US2015/041831 fitted to the volume part or to the entire model (by defining rotation relative to an (x,y,z) coordinate system).
Step 63: Extrude the 2D mesh through the physical domain in the third dimension. The direction for mesh extrusion can be different for each volume part (or fault block). Even further, variable extrusion directions can be built, adapting to a property gradient.
Step 64: Build prismatic cell faces based on property contrasts. A property defining main zonation/layer ID of a geologic concept may be sampled from the design space and prismatic grid faces may be constructed on the (implicitly defined) layer boundaries. Layer definition and reconstruction can be hierarchical based on the geologic concept, i.e., if smaller-scale geobodies are modeled as fully contained inside a main zone of the concept model, they will be reconstructed in a hierarchical manner after the main zone is reconstructed. Optionally, grid layers may be further subdivided with the standard layering options (proportional, top- or bottom-conforming).
Step 65: Prismatic grid cells may be truncated by the boundaries of the volumetric pieces of the domain (faults and horizons). Steps 62-65 are performed entirely in the physical domain.
Step 66: Rock properties may be sampled onto the grid cells from the design space. This is illustrated in Fig. 4B. Various types of averaging can be used in sampling, e.g. cell center, arithmetic average of “vertical” edge centers, arithmetic or harmonic average of quadrature points.
Step 67: Connectivity of the cells along the contacts of volumetric domain pieces (faults) may be determined by computing intersections of cell faces coming from both sides of the contact.
[0023] Basic steps in an embodiment of the present inventive method for generating a conforming prismatic grid (for a zone, fault-block (volume bounded by fault surfaces and containing multiple zones) or entire model volume) are as follows, with reference to the flow chart of Fig. 7:
Step 72: Generate a 3D parameterization of a model domain (zone, fault-block, or entire model). This step is specific to building a conforming grid, and is not required for truncated grids. This step and steps 73-76 are performed totally in the physical domain. See, for example, companion patent application serial No. 62/120,653, entitled “Methodology for Parameterizing 3D Domain with Discontinuities”, which is incorporated herein in all jurisdictions that allow it.
WO 2016/018723
PCT/US2015/041831
Step 73: Build a 2D areal grid of the domain (or, optionally, use the base grid of the parameterization). Use existing methods, such as is disclosed in US Patent No. 7,932,904, which is incorporated herein in all jurisdictions that allow it. The 2D mesh can be adaptive to some property or density control, as is illustrated in Fig. 5A.
Step 74: Extrude the 2D mesh through the physical domain in the third dimension according to the pillars of the parameterization.
Step 75: Build prismatic cell faces based on property contrasts, (same as in step 64 in Fig. 6). A property defining main zonation/layer ID of a geologic concept may be sampled from the design space and prismatic grid faces may be constructed on the (implicitly defined) layer boundaries. Fayer definition and reconstruction can be hierarchical based on the geologic concept, i.e., if smaller-scale geobodies are modeled as fully contained inside a main zone of the concept model, they may be reconstructed in a hierarchical manner after the main zone is reconstructed. Optionally, grid layers may be further subdivided with the standard layering options (proportional, top- or bottom-conforming).
Step 76: Prismatic grid cells conform to fault surfaces as a result of the parameterization; they can be either (a) truncated by horizon surfaces or (b) conformed to (form a pinch-out with) horizons.
Step 77: Rock properties may be sampled onto the grid cells from the design space (same as step 66). This is illustrated in Fig. 5B. Various types of averaging can be used in sampling, e.g. cell center, arithmetic average of “vertical” edge centers, arithmetic or harmonic average of quadrature points.
Step 78: Connectivity of the cells along the contacts of volumetric domain pieces (faults) may be determined by computing intersections of cell faces coming from both sides of the contact, (same as step 67).
[0024] Conformal grids are preferable for reservoirs with near-vertical faults, and truncated grid are preferable for more complex reservoir structures that include, for example, x- or yfaults, or nearly horizontal faults.
[0025] For a multi-zonal model, which is built zone-by-zone with different areal 2D grid resolutions for each zone, a final step of consolidation needs to be performed after grid geometries are generated in each zone of the model. In this consolidation step, connectivity of
WO 2016/018723
PCT/US2015/041831 cells along the contacts of zones (horizons and faults) is established similar to steps 67 and 78). This consolidation is illustrated for a truncated grid in Fig. 3.
[0026] As will be readily apparent to all persons who work in the technical field, all practical applications of the present inventive method are performed using a computer, programmed in accordance with the disclosures herein.
[0027] The foregoing description is directed to particular embodiments of the present invention for the purpose of illustrating it. It will be apparent, however, to one skilled in the art, that many modifications and variations to the embodiments described herein are possible. All such modifications and variations are intended to be within the scope of the present invention, as defined by the appended claims.
Claims (21)
- 2015298233 09 Jan 20181. A method for generating a model of a material property of a subsurface region for hydrocarbon prospecting or reservoir development, said method comprising:generating, using a computer, a mapping from a physical domain of the subsurface region, with faults, to a continuous design space in which all faults are removed;describing the material property in the continuous design space as a piecewise smooth implicit or explicit function in three dimensions;in the physical domain, constructing grid layering from the function describing the material property, the constructing comprising:(i) generating a two-dimensional mesh in a two-dimensional plane of the physical domain;(ii) extruding the two-dimensional mesh through the physical domain into the third dimension; and (iii) building prismatic cell faces based on property contrasts, thereby subdividing the physical domain into prismatic grid cells, wherein the grid cells are truncated at faults, the grid cells are conformed to fault surfaces using a parameterization of a 3D model domain, or a combination of both;sampling the material property from the design space and populating the grid cells in the physical domain with material property values;in the physical domain, identifying connectivity of the grid cells across each fault by approaching the fault from both sides, wherein the identifying connectivity comprises computing intersections of cell faces from both sides of the fault; and using the model of the material property for hydrocarbon prospecting or reservoir development in the subsurface region.
- 2. The method of claim 1, wherein the faults and horizons are identified and the threedimensional material property function is constructed at least partly from data acquired in a seismic survey of the subsurface region.
- 3. The method of claim 1, wherein the material property is one of rock type, permeability, porosity and any combination thereof, and the model is used for hydrocarbon reservoir development in a reservoir simulator software program.2015298233 09 Jan 2018
- 4. The method of claim 1, wherein the piecewise smooth implicit or explicit function is a mathematical function that requires no grid for its definition.
- 5. The method of claim 1, wherein the method is applied zone-by-zone, one zone at a time, and further comprising consolidating grid geometries generated in each zone of the model by establishing connectivity of cells along contacts of zones including horizons and faults.
- 6. The method of claim 5, wherein the zones are defined by the horizons and faults.
- 7. The method of claim 1, wherein the property contrasts are detected by vertically sampling the three-dimensional material property function along parallel rays.
- 8. The method of claim 1, wherein some of the prismatic cell faces are constructed to resolve surfaces of property contrasts.
- 9. The method of claim 1, wherein the grid cells are truncated at faults, and the two-dimensional mesh is generated in an (x,y) plane of a bounding box around a volume part or an entire model volume, and the mesh is adapted to the material property or to density.
- 10. The method of claim 9, wherein the bounding box is fitted to the volume part or to the entire model volume by rotating the bounding box relative to an (x,y,z) coordinate system.
- 11. The method of claim 9, wherein the mesh extrusion is in a variable direction that depends on a gradient of the material property.
- 12. The method of claim 1, wherein the grid cells are truncated at faults and also at horizons.
- 13. The method of claim 1, wherein the grid cells are conformed at faults, the mesh is adapted to the material property or to density, and the extruding follows pillars of the parameterization.
- 14. The method of claim 1, wherein the grid cells are conformed at faults, and at horizons the grid cells are truncated or conformed.
- 15. The method of claim 1, wherein the property sampling uses the mapping from the physical domain to the design space.
- 16. The method of claim 1, wherein the two-dimensional mesh is generated in a plane of a bounding box around a volume part or an entire model volume, and the bounding box is fitted to the volume part or to the entire model by rotating the bounding box relative to an (χ,γ,ζ) coordinate system.2015298233 09 Jan 2018
- 17. The method of claim 1, wherein the model is divided into a plurality of volume parts or fault blocks, and the mesh extrusion may vary with volume part or fault block.
- 18. The method of claim 17, wherein the mesh extrusion variation includes variation in extrusion direction, and the extrusion direction is determined by adapting to a material property gradient.
- 19. The method of claim 17, wherein each volume part or fault block may have its twodimensional mesh in a different plane.
- 20. The method of claim 1, wherein the constructing grid layering from the function describing the material property is performed in the physical domain without relying on any grid from the design space.
- 21. The method of claim 1, wherein the two-dimensional mesh comprises a plurality of mesh cells, and extruding the two-dimensional mesh through the physical domain into the third dimension is different for one or more of the plurality of mesh cells.2014EM196WO 2016/018723PCT/US2015/0418311/62014EM196WO 2016/018723PCT/US2015/0418312/6FIG. 2A FIG. 2BFIG. 2CFIG. 32014EM196WO 2016/018723PCT/US2015/0418313/6FIG. 4AFIG. 4B2014EM196WO 2016/018723PCT/US2015/0418314/6FIG. 5AFIG. 5B2014EM196WO 2016/018723PCT/US2015/0418315/6FIG. 62014EM196WO 2016/018723PCT/US2015/0418316/6FIG. 7
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201462031097P | 2014-07-30 | 2014-07-30 | |
US62/031,097 | 2014-07-30 | ||
PCT/US2015/041831 WO2016018723A1 (en) | 2014-07-30 | 2015-07-23 | Method for volumetric grid generation in a domain with heterogeneous material properties |
Publications (2)
Publication Number | Publication Date |
---|---|
AU2015298233A1 AU2015298233A1 (en) | 2017-02-02 |
AU2015298233B2 true AU2015298233B2 (en) | 2018-02-22 |
Family
ID=53836211
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU2015298233A Ceased AU2015298233B2 (en) | 2014-07-30 | 2015-07-23 | Method for volumetric grid generation in a domain with heterogeneous material properties |
Country Status (5)
Country | Link |
---|---|
US (1) | US10319143B2 (en) |
EP (1) | EP3175265A1 (en) |
AU (1) | AU2015298233B2 (en) |
CA (1) | CA2948667A1 (en) |
WO (1) | WO2016018723A1 (en) |
Families Citing this family (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011159372A1 (en) | 2010-06-15 | 2011-12-22 | Exxonmobil Upstream Research Company | Method and system for stabilizing formulation methods |
EP2599031A4 (en) | 2010-07-29 | 2014-01-08 | Exxonmobil Upstream Res Co | Methods and systems for machine-learning based simulation of flow |
WO2012015515A1 (en) | 2010-07-29 | 2012-02-02 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
US9626466B2 (en) | 2010-11-23 | 2017-04-18 | Exxonmobil Upstream Research Company | Variable discretization method for flow simulation on complex geological models |
US10036829B2 (en) | 2012-09-28 | 2018-07-31 | Exxonmobil Upstream Research Company | Fault removal in geological models |
US10319143B2 (en) | 2014-07-30 | 2019-06-11 | Exxonmobil Upstream Research Company | Volumetric grid generation in a domain with heterogeneous material properties |
CA2907871C (en) * | 2014-10-09 | 2024-02-20 | Schlumberger Canada Limited | Fault representation |
AU2015339884B2 (en) | 2014-10-31 | 2018-03-15 | Exxonmobil Upstream Research Company | Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques |
GB2548143A (en) * | 2016-03-10 | 2017-09-13 | Lancaster Univ Business Entpr Ltd | Surface modelling |
HUE064459T2 (en) | 2016-12-23 | 2024-03-28 | Exxonmobil Technology & Engineering Company | Method and system for stable and efficient reservoir simulation using stability proxies |
US11041976B2 (en) * | 2017-05-30 | 2021-06-22 | Exxonmobil Upstream Research Company | Method and system for creating and using a subsurface model in hydrocarbon operations |
US11555937B2 (en) * | 2018-06-22 | 2023-01-17 | Exxonmobil Upstream Research Company | Method and system for generating simulation grids by mapping a grid from the design space |
US11604909B2 (en) | 2019-05-28 | 2023-03-14 | Chevron U.S.A. Inc. | System and method for accelerated computation of subsurface representations |
US11249220B2 (en) | 2019-08-14 | 2022-02-15 | Chevron U.S.A. Inc. | Correlation matrix for simultaneously correlating multiple wells |
US11187826B2 (en) | 2019-12-06 | 2021-11-30 | Chevron U.S.A. Inc. | Characterization of subsurface regions using moving-window based analysis of unsegmented continuous data |
US10984590B1 (en) * | 2019-12-06 | 2021-04-20 | Chevron U.S.A. Inc. | Generation of subsurface representations using layer-space |
US11010969B1 (en) | 2019-12-06 | 2021-05-18 | Chevron U.S.A. Inc. | Generation of subsurface representations using layer-space |
US11320566B2 (en) | 2020-01-16 | 2022-05-03 | Chevron U.S.A. Inc. | Multiple well matching within subsurface representation |
US11263362B2 (en) | 2020-01-16 | 2022-03-01 | Chevron U.S.A. Inc. | Correlation of multiple wells using subsurface representation |
US11397279B2 (en) | 2020-03-27 | 2022-07-26 | Chevron U.S.A. Inc. | Comparison of wells using a dissimilarity matrix |
WO2024082000A1 (en) * | 2022-10-20 | 2024-04-25 | Commonwealth Scientific And Industrial Research Organisation | Methods for determining realistic permeability distributions in faults and sediments |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080021684A1 (en) * | 2004-06-02 | 2008-01-24 | Jean-Claude Dulac | Method For Building A Three Dimensional Cellular Partition Of A Geological Domain |
WO2011059535A1 (en) * | 2009-11-12 | 2011-05-19 | Exxonmobil Upstream Research Company | Method and apparatus for reservoir modeling and simulation |
US20130246031A1 (en) * | 2010-12-08 | 2013-09-19 | Xiaohui Wu | Constructing Geologic Models From Geologic Concepts |
Family Cites Families (307)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5537320A (en) | 1994-10-31 | 1996-07-16 | Landmark Graphics Corporation | Method and apparatus for identifying fault curves in seismic data |
JP3626784B2 (en) | 1995-03-17 | 2005-03-09 | 富士通株式会社 | Data update method and program conversion device for distributed memory parallel computer |
US5706194A (en) | 1995-06-01 | 1998-01-06 | Phillips Petroleum Company | Non-unique seismic lithologic inversion for subterranean modeling |
FR2739446B1 (en) | 1995-09-28 | 1997-10-24 | Inst Francais Du Petrole | METHOD FOR MEASURING WITH VERY PRECISION THE VARIATION IN VOLUME INTERVENING DURING THE MIXTURE OF FLUID PHASES, FOR THE PURPOSE OF DETERMINING PHYSICO-CHEMICAL CHARACTERISTICS |
US5710726A (en) | 1995-10-10 | 1998-01-20 | Atlantic Richfield Company | Semi-compositional simulation of hydrocarbon reservoirs |
US5671136A (en) | 1995-12-11 | 1997-09-23 | Willhoit, Jr.; Louis E. | Process for seismic imaging measurement and evaluation of three-dimensional subterranean common-impedance objects |
FR2744224B1 (en) | 1996-01-26 | 1998-04-17 | Inst Francais Du Petrole | METHOD FOR SIMULATING THE FILLING OF A SEDIMENTARY BASIN |
US5838634A (en) | 1996-04-04 | 1998-11-17 | Exxon Production Research Company | Method of generating 3-D geologic models incorporating geologic and geophysical constraints |
FR2748516B1 (en) | 1996-05-07 | 1998-06-26 | Inst Francais Du Petrole | METHOD FOR REALIZING A 2D CINEMATIC MODEL OF GEOLOGICAL BASINS AFFECTED BY FAULTS |
US6014343A (en) | 1996-10-31 | 2000-01-11 | Geoquest | Automatic non-artificially extended fault surface based horizon modeling system |
US6128577A (en) | 1996-12-19 | 2000-10-03 | Schlumberger Technology Corporation | Modeling geological structures and properties |
US5982707A (en) * | 1997-01-16 | 1999-11-09 | Geoquest | Method and apparatus for determining geologic relationships for intersecting faults |
US5924048A (en) | 1997-03-14 | 1999-07-13 | Mccormack; Michael D. | Automated material balance system for hydrocarbon reservoirs using a genetic procedure |
US6106561A (en) | 1997-06-23 | 2000-08-22 | Schlumberger Technology Corporation | Simulation gridding method and apparatus including a structured areal gridder adapted for use by a reservoir simulator |
US5992519A (en) | 1997-09-29 | 1999-11-30 | Schlumberger Technology Corporation | Real time monitoring and control of downhole reservoirs |
RU2223521C2 (en) | 1997-12-01 | 2004-02-10 | Шлюмбергер Текнолоджи Б.В. | Method and gear for formation, test and modification of geological models of subsurface zones |
AU2950499A (en) | 1998-05-04 | 1999-11-23 | Schlumberger Evaluation & Production (Uk) Services | Near wellbore modeling method and apparatus |
US6300958B1 (en) | 1998-07-17 | 2001-10-09 | T-Surf Corp. | Global constrained parameterization of triangulated surfaces |
US6765570B1 (en) | 1998-07-21 | 2004-07-20 | Magic Earth, Inc. | System and method for analyzing and imaging three-dimensional volume data sets using a three-dimensional sampling probe |
US6018498A (en) | 1998-09-02 | 2000-01-25 | Phillips Petroleum Company | Automated seismic fault detection and picking |
US6662146B1 (en) | 1998-11-25 | 2003-12-09 | Landmark Graphics Corporation | Methods for performing reservoir simulation |
AU3229900A (en) | 1999-02-12 | 2000-08-29 | Prange, Michael | Uncertainty constrained subsurface modeling |
US6230101B1 (en) | 1999-06-03 | 2001-05-08 | Schlumberger Technology Corporation | Simulation method and apparatus |
US6826520B1 (en) | 1999-06-24 | 2004-11-30 | Exxonmobil Upstream Research Company | Method of upscaling permeability for unstructured grids |
US6826483B1 (en) | 1999-10-13 | 2004-11-30 | The Trustees Of Columbia University In The City Of New York | Petroleum reservoir simulation and characterization system and method |
US6480790B1 (en) | 1999-10-29 | 2002-11-12 | Exxonmobil Upstream Research Company | Process for constructing three-dimensional geologic models having adjustable geologic interfaces |
FR2800881B1 (en) | 1999-11-05 | 2001-11-30 | Inst Francais Du Petrole | METHOD FOR REALIZING IN 3D A KINEMATIC MODEL OF DEFORMATION OF A SEDIMENTARY BASIN |
US6374185B1 (en) | 2000-02-18 | 2002-04-16 | Rdsp I, L.P. | Method for generating an estimate of lithological characteristics of a region of the earth's subsurface |
US6980940B1 (en) | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
US6370491B1 (en) | 2000-04-04 | 2002-04-09 | Conoco, Inc. | Method of modeling of faulting and fracturing in the earth |
US6826521B1 (en) | 2000-04-06 | 2004-11-30 | Abb Automation Inc. | System and methodology and adaptive, linear model predictive control based on rigorous, nonlinear process model |
WO2002003265A2 (en) * | 2000-06-29 | 2002-01-10 | Object Reservoir, Inc. | A method for modeling an arbitrary well path in a hydrocarbon reservoir using adaptive meshing |
GB0017227D0 (en) | 2000-07-14 | 2000-08-30 | Schlumberger Ind Ltd | Fully coupled geomechanics in a commerical reservoir simulator |
US7415401B2 (en) | 2000-08-31 | 2008-08-19 | Exxonmobil Upstream Research Company | Method for constructing 3-D geologic models by combining multiple frequency passbands |
US20020049575A1 (en) | 2000-09-28 | 2002-04-25 | Younes Jalali | Well planning and design |
GB2386811B (en) | 2000-12-18 | 2005-06-08 | Schlumberger Holdings | Method and apparatus for visualization of 3D voxel data using lit opacity volumes with shading |
US6664961B2 (en) | 2000-12-20 | 2003-12-16 | Rutgers, The State University Of Nj | Resample and composite engine for real-time volume rendering |
FR2818742B1 (en) | 2000-12-22 | 2003-02-14 | Inst Francais Du Petrole | METHOD FOR FORMING AN OPTIMIZED NEURAL NETWORK MODULE FOR SIMULATING THE FLOW MODE OF A POLYPHASIC FLUID Vein |
US6690820B2 (en) | 2001-01-31 | 2004-02-10 | Magic Earth, Inc. | System and method for analyzing and imaging and enhanced three-dimensional volume data set using one or more attributes |
US6901391B2 (en) | 2001-03-21 | 2005-05-31 | Halliburton Energy Services, Inc. | Field/reservoir optimization utilizing neural networks |
US7286972B2 (en) | 2001-04-17 | 2007-10-23 | Livermore Software Technology Corporation | Implicit-explicit switching for finite element analysis |
DK2362346T3 (en) | 2001-04-18 | 2013-10-07 | Landmark Graphics Corp | Process and computer software product for volume rendering |
ATE310890T1 (en) | 2001-04-24 | 2005-12-15 | Exxonmobil Upstream Res Co | METHOD FOR IMPROVING PRODUCTION ALLOCATION IN AN INTEGRATED RESERVOIR AND SURFACE FLOW SYSTEM |
EP1397703B1 (en) | 2001-06-06 | 2008-02-27 | Schlumberger Oilfield Assistance Limited | Automated system for modeling faulted multi-valued horizons |
US7248259B2 (en) | 2001-12-12 | 2007-07-24 | Technoguide As | Three dimensional geological model construction |
US7606691B2 (en) | 2001-12-13 | 2009-10-20 | Exxonmobil Upstream Research Company | Method for locally controlling spatial continuity in geologic models |
US7069149B2 (en) | 2001-12-14 | 2006-06-27 | Chevron U.S.A. Inc. | Process for interpreting faults from a fault-enhanced 3-dimensional seismic attribute volume |
US6694264B2 (en) | 2001-12-19 | 2004-02-17 | Earth Science Associates, Inc. | Method and system for creating irregular three-dimensional polygonal volume models in a three-dimensional geographic information system |
US7523024B2 (en) | 2002-05-17 | 2009-04-21 | Schlumberger Technology Corporation | Modeling geologic objects in faulted formations |
US7627504B2 (en) | 2002-10-31 | 2009-12-01 | Thomson Reuters (Tax and Accounting) Services, Inc. | Information processing system for determining tax information |
US7225324B2 (en) | 2002-10-31 | 2007-05-29 | Src Computers, Inc. | Multi-adaptive processing systems and techniques for enhancing parallelism and performance of computational functions |
US20060122780A1 (en) | 2002-11-09 | 2006-06-08 | Geoenergy, Inc | Method and apparatus for seismic feature extraction |
WO2004049216A1 (en) | 2002-11-23 | 2004-06-10 | Schlumberger Technology Corporation | Method and system for integrated reservoir and surface facility networks simulations |
FR2848320B1 (en) | 2002-12-10 | 2005-01-28 | Inst Francais Du Petrole | METHOD FOR MODELING HYDRODYNAMIC CHARACTERISTICS OF POLYPHASIC FLOWS BY NEURON NETWORKS |
US7379854B2 (en) | 2002-12-19 | 2008-05-27 | Exxonmobil Upstream Research Company | Method of conditioning a random field to have directionally varying anisotropic continuity |
FR2849211B1 (en) | 2002-12-20 | 2005-03-11 | Inst Francais Du Petrole | METHOD OF MODELING TO CONSTITUTE A MODEL SIMULATING THE MULTILITHOLOGICAL FILLING OF A SEDIMENT BASIN |
US7280952B2 (en) | 2003-01-28 | 2007-10-09 | Conocophillips Company | Well planning using seismic coherence |
US7096172B2 (en) | 2003-01-31 | 2006-08-22 | Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. | System and method for automated reservoir targeting |
US6823297B2 (en) | 2003-03-06 | 2004-11-23 | Chevron U.S.A. Inc. | Multi-scale finite-volume method for use in subsurface flow simulation |
NO322089B1 (en) | 2003-04-09 | 2006-08-14 | Norsar V Daglig Leder | Procedure for simulating local preamp deep-migrated seismic images |
US7835893B2 (en) | 2003-04-30 | 2010-11-16 | Landmark Graphics Corporation | Method and system for scenario and case decision management |
US7539625B2 (en) | 2004-03-17 | 2009-05-26 | Schlumberger Technology Corporation | Method and apparatus and program storage device including an integrated well planning workflow control system with process dependencies |
US7096122B2 (en) | 2003-07-22 | 2006-08-22 | Dianli Han | Method for producing full field radial grid for hydrocarbon reservoir simulation |
NL1024444C2 (en) | 2003-10-03 | 2005-04-08 | J O A Beheer B V | Method, device, computer program and data carrier for modeling a multi-dimensional heterogeneous structure with a digital processing unit. |
FR2863052B1 (en) | 2003-12-02 | 2006-02-24 | Inst Francais Du Petrole | METHOD FOR DETERMINING THE COMPONENTS OF A TENSEUR OF EFFECTIVE PERMEABILITY OF A POROUS ROCK |
US20050171700A1 (en) | 2004-01-30 | 2005-08-04 | Chroma Energy, Inc. | Device and system for calculating 3D seismic classification features and process for geoprospecting material seams |
CA2543801C (en) | 2004-01-30 | 2014-03-04 | Exxonmobil Upstream Research Company | Reservoir model building methods |
WO2005076124A1 (en) | 2004-01-30 | 2005-08-18 | Exxonmobil Upstream Research Company | Reservoir evaluation methods |
US7596481B2 (en) | 2004-03-16 | 2009-09-29 | M-I L.L.C. | Three-dimensional wellbore analysis and visualization |
EP1733330A1 (en) | 2004-03-31 | 2006-12-20 | ExxonMobil Upstream Research Company | Method for constructing a geologic model of a subsurface reservoir |
FR2869116B1 (en) | 2004-04-14 | 2006-06-09 | Inst Francais Du Petrole | METHOD FOR CONSTRUCTING A GEOMECHANICAL MODEL OF A SUBTERRANEAN ZONE FOR TORQUE TO A RESERVOIR MODEL |
GB2429796B (en) | 2004-06-25 | 2008-08-06 | Shell Int Research | Closed loop control system for controlling production of hydrocarbon fluid from an underground formation |
US7526418B2 (en) | 2004-08-12 | 2009-04-28 | Saudi Arabian Oil Company | Highly-parallel, implicit compositional reservoir simulator for multi-million-cell models |
US20060047429A1 (en) | 2004-08-24 | 2006-03-02 | Adams Steven L | Method of estimating geological formation depths by converting interpreted seismic horizons from the time domain to the depth domain |
WO2006036389A2 (en) | 2004-09-10 | 2006-04-06 | Exxonmobil Upstream Research Company | Numerical modeling evaluation of basin sedimentation properities |
US7925481B2 (en) | 2004-09-10 | 2011-04-12 | Van Wagoner John C | Geologic models of subsurface sedimentary volumes |
US7809537B2 (en) | 2004-10-15 | 2010-10-05 | Saudi Arabian Oil Company | Generalized well management in parallel reservoir simulation |
DE602004015297D1 (en) | 2004-10-26 | 2008-09-04 | Total Sa | Method and computer program for defect surface construction |
CN101443767B (en) | 2004-11-29 | 2013-09-04 | 切夫里昂美国公司 | Method, system and program storage device for simulating fluid flow in a physical system using a dynamic composition based extensible object-oriented architecture |
MX2007006993A (en) | 2004-12-14 | 2007-08-07 | Schlumberger Technology Bv | Geometrical optimization of multi-well trajectories. |
US7640149B2 (en) | 2004-12-15 | 2009-12-29 | Schlumberger Technology Corporation | Method system and program storage device for optimization of valve settings in instrumented wells using adjoint gradient technology and reservoir simulation |
US7788037B2 (en) | 2005-01-08 | 2010-08-31 | Halliburton Energy Services, Inc. | Method and system for determining formation properties based on fracture treatment |
EP1707993B1 (en) | 2005-03-29 | 2009-08-19 | Total S.A. | Method and computer program for the determination of geological discontinuities |
WO2006111976A2 (en) | 2005-04-18 | 2006-10-26 | Technion Research & Development Foundation Ltd. | Automatic remeshing by mapping a 2d grid on 3d genus-g meshes based on topological analysis |
US7480205B2 (en) | 2005-04-20 | 2009-01-20 | Landmark Graphics Corporation | 3D fast fault restoration |
US7516056B2 (en) | 2005-04-26 | 2009-04-07 | Schlumberger Technology Corporation | Apparatus, method and system for improved reservoir simulation using a multiplicative overlapping Schwarz preconditioning for adaptive implicit linear systems |
US7277796B2 (en) | 2005-04-26 | 2007-10-02 | Schlumberger Technology Corporation | System and methods of characterizing a hydrocarbon reservoir |
US8209202B2 (en) | 2005-04-29 | 2012-06-26 | Landmark Graphics Corporation | Analysis of multiple assets in view of uncertainties |
KR20060127743A (en) | 2005-06-06 | 2006-12-13 | 스미토모덴키고교가부시키가이샤 | Nitride semiconductor substrate and method for manufacturing the same |
US20070016389A1 (en) | 2005-06-24 | 2007-01-18 | Cetin Ozgen | Method and system for accelerating and improving the history matching of a reservoir simulation model |
GB2444874A (en) | 2005-08-15 | 2008-06-18 | Univ Southern California | Modelling application development in the petroleum industry |
AU2006279437A1 (en) | 2005-08-15 | 2007-02-22 | University Of Southern California | Method and system for integrated asset management utilizing multi-level modeling of oil field assets |
FR2890453B1 (en) | 2005-09-05 | 2007-10-19 | Inst Francais Du Petrole | METHOD FOR UPDATING A GEOLOGICAL RESERVOIR MODEL USING DYNAMIC DATA |
US7406878B2 (en) | 2005-09-27 | 2008-08-05 | Endress + Hauser Flowtec Ag | Method for measuring a medium flowing in a pipeline and measurement system therefor |
AU2006344398B2 (en) | 2005-10-06 | 2011-05-19 | Logined B.V. | Method, system and apparatus for numerical black oil delumping |
US7623996B1 (en) | 2005-10-21 | 2009-11-24 | Textron Innovations, Inc. | Mass morphing system and method |
US7584081B2 (en) | 2005-11-21 | 2009-09-01 | Chevron U.S.A. Inc. | Method, system and apparatus for real-time reservoir model updating using ensemble kalman filter |
US7809538B2 (en) | 2006-01-13 | 2010-10-05 | Halliburton Energy Services, Inc. | Real time monitoring and control of thermal recovery operations for heavy oil reservoirs |
US8280635B2 (en) | 2006-01-20 | 2012-10-02 | Landmark Graphics Corporation | Dynamic production system management |
US8504341B2 (en) | 2006-01-31 | 2013-08-06 | Landmark Graphics Corporation | Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators |
US7486589B2 (en) | 2006-02-09 | 2009-02-03 | Schlumberger Technology Corporation | Methods and apparatus for predicting the hydrocarbon production of a well location |
JP3879769B1 (en) * | 2006-02-22 | 2007-02-14 | 株式会社村田製作所 | Thermoelectric conversion module and manufacturing method thereof |
US8812334B2 (en) | 2006-02-27 | 2014-08-19 | Schlumberger Technology Corporation | Well planning system and method |
BRPI0708449B1 (en) | 2006-03-02 | 2019-01-22 | Exxonmobil Upstream Res Co | hydrocarbon production methods |
WO2007116008A1 (en) | 2006-04-07 | 2007-10-18 | Shell Internationale Research Maatschappij B.V. | Method for optimising the production of a cluster of wells |
US7716029B2 (en) | 2006-05-15 | 2010-05-11 | Schlumberger Technology Corporation | Method for optimal gridding in reservoir simulation |
US20070277115A1 (en) | 2006-05-23 | 2007-11-29 | Bhp Billiton Innovation Pty Ltd. | Method and system for providing a graphical workbench environment with intelligent plug-ins for processing and/or analyzing sub-surface data |
US7756694B2 (en) | 2006-05-31 | 2010-07-13 | Schlumberger Technology Corporation | Method for interactive automation of fault modeling including a method for intelligently sensing fault-fault relationships |
US20070279429A1 (en) | 2006-06-02 | 2007-12-06 | Leonhard Ganzer | System and method for rendering graphics |
US7548840B2 (en) | 2006-06-06 | 2009-06-16 | Chevron U.S.A. Inc. | Efficient application of reduced variable transformation and conditional stability testing in reservoir simulation flash calculations |
US7254091B1 (en) | 2006-06-08 | 2007-08-07 | Bhp Billiton Innovation Pty Ltd. | Method for estimating and/or reducing uncertainty in reservoir models of potential petroleum reservoirs |
US8078437B2 (en) | 2006-07-07 | 2011-12-13 | Exxonmobil Upstream Research Company | Upscaling reservoir models by reusing flow solutions from geologic models |
US9043188B2 (en) | 2006-09-01 | 2015-05-26 | Chevron U.S.A. Inc. | System and method for forecasting production from a hydrocarbon reservoir |
US7474415B2 (en) | 2006-09-13 | 2009-01-06 | Chung Shan Institute Of Science And Technology, Armaments Bureau, M.N.D. | Measurement method of three-dimensional profiles and reconstruction system thereof using subpixel localization with color gratings and picture-in-picture switching on single display |
US7657494B2 (en) | 2006-09-20 | 2010-02-02 | Chevron U.S.A. Inc. | Method for forecasting the production of a petroleum reservoir utilizing genetic programming |
US7877246B2 (en) | 2006-09-22 | 2011-01-25 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
US20080144903A1 (en) | 2006-10-25 | 2008-06-19 | Bai Wang | Real-time hardware accelerated contour generation based on VOI mask |
AU2007308804A1 (en) | 2006-10-26 | 2008-05-02 | Abbott Diabetes Care, Inc. | Method, system and computer program product for real-time detection of sensitivity decline in analyte sensors |
US8145464B2 (en) | 2006-11-02 | 2012-03-27 | Schlumberger Technology Corporation | Oilfield operational system and method |
US20080126168A1 (en) | 2006-11-15 | 2008-05-29 | Schlumberger Technology Corporation | Oilfield management system |
US7577527B2 (en) | 2006-12-29 | 2009-08-18 | Schlumberger Technology Corporation | Bayesian production analysis technique for multistage fracture wells |
AU2008205061B2 (en) | 2007-01-05 | 2013-06-06 | Landmark Graphics Corporation | Systems and methods for visualizing multiple volumetric data sets in real time |
US7467044B2 (en) | 2007-01-15 | 2008-12-16 | Chevron U.S.A. Inc | Method and system for assessing exploration prospect risk and uncertainty |
US7706981B2 (en) | 2007-02-08 | 2010-04-27 | Chevron U.S.A. Inc. | Method for generating reservoir models utilizing synthetic stratigraphic columns |
US9110193B2 (en) | 2007-02-25 | 2015-08-18 | Chevron U.S.A. Inc. | Upscaling multiple geological models for flow simulation |
FR2914434B1 (en) | 2007-03-30 | 2009-05-22 | Inst Francais Du Petrole | METHOD FOR SETTING THE HISTORY OF A GEOLOGICAL MODEL BY GRADUAL MODIFICATION OF THE PROPORTIONS OF THE LITHOLOGICAL FACES |
US8005658B2 (en) | 2007-05-31 | 2011-08-23 | Schlumberger Technology Corporation | Automated field development planning of well and drainage locations |
CA2686714C (en) | 2007-06-01 | 2016-11-01 | Exxonmobil Upstream Research Company | Generation of constrained voronoi grid in a plane |
US9175547B2 (en) | 2007-06-05 | 2015-11-03 | Schlumberger Technology Corporation | System and method for performing oilfield production operations |
US8775141B2 (en) | 2007-07-02 | 2014-07-08 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
FR2918776B1 (en) | 2007-07-09 | 2009-09-25 | Total Sa | METHOD, PROGRAM AND COMPUTER SYSTEM FOR SCALING HYDROCARBON RESERVOIR MODEL DATA. |
US7986319B2 (en) | 2007-08-01 | 2011-07-26 | Austin Gemodeling, Inc. | Method and system for dynamic, three-dimensional geological interpretation and modeling |
US8612194B2 (en) | 2007-08-08 | 2013-12-17 | Westerngeco L.L.C. | Updating a subterranean model using at least electromagnetic data |
US8510242B2 (en) | 2007-08-31 | 2013-08-13 | Saudi Arabian Oil Company | Artificial neural network models for determining relative permeability of hydrocarbon reservoirs |
US20100191516A1 (en) | 2007-09-07 | 2010-07-29 | Benish Timothy G | Well Performance Modeling In A Collaborative Well Planning Environment |
RU2010114583A (en) | 2007-09-13 | 2011-10-20 | Шлюмбергер Текнолоджи Б.В. (Nl) | METHODS FOR OPTIMIZING AN ANALYSIS OF THE COLLECTOR |
US20100132450A1 (en) | 2007-09-13 | 2010-06-03 | Pomerantz Andrew E | Methods for optimizing petroleum reservoir analysis |
US20110161133A1 (en) | 2007-09-29 | 2011-06-30 | Schlumberger Technology Corporation | Planning and Performing Drilling Operations |
MX2010004348A (en) | 2007-10-22 | 2010-05-19 | Schlumberger Technology Bv | Formation modeling while drilling for enhanced high angle or horizontal well placement. |
CA2703955C (en) | 2007-10-30 | 2018-05-29 | University Of Utah Research Foundation | Fast iterative method for processing hamilton-jacobi equations |
CA2822231A1 (en) | 2007-11-14 | 2009-05-22 | Terraspark Geosciences, Llc | Seismic data processing |
FR2923930B1 (en) | 2007-11-19 | 2009-11-20 | Inst Francais Du Petrole | METHOD FOR MODELING A POROUS GEOLOGICAL ENVIRONMENT CROSSED BY A FRACTURE NETWORK |
GB2455077A (en) | 2007-11-27 | 2009-06-03 | Polyhedron Software Ltd | Estimating the state of a physical system using generalized nested factorisation |
US7878268B2 (en) | 2007-12-17 | 2011-02-01 | Schlumberger Technology Corporation | Oilfield well planning and operation |
US8577660B2 (en) | 2008-01-23 | 2013-11-05 | Schlumberger Technology Corporation | Three-dimensional mechanical earth modeling |
US9223041B2 (en) | 2008-01-23 | 2015-12-29 | Schlubmerger Technology Corporation | Three-dimensional mechanical earth modeling |
US7822554B2 (en) | 2008-01-24 | 2010-10-26 | Schlumberger Technology Corporation | Methods and apparatus for analysis of downhole compositional gradients and applications thereof |
US7920970B2 (en) | 2008-01-24 | 2011-04-05 | Schlumberger Technology Corporation | Methods and apparatus for characterization of petroleum fluid and applications thereof |
CA2714731C (en) | 2008-02-11 | 2016-11-15 | Gary Schottle | Systems and methods for improved positioning of pads |
US8285532B2 (en) | 2008-03-14 | 2012-10-09 | Schlumberger Technology Corporation | Providing a simplified subterranean model |
US7996154B2 (en) | 2008-03-27 | 2011-08-09 | Schlumberger Technology Corporation | Methods and apparatus for analysis of downhole asphaltene gradients and applications thereof |
US8803878B2 (en) | 2008-03-28 | 2014-08-12 | Schlumberger Technology Corporation | Visualizing region growing in three dimensional voxel volumes |
AU2009229194B2 (en) | 2008-03-28 | 2014-10-02 | Exxonmobil Upstream Research Company | Computing a consistent velocity vector field from a set of fluxes |
US9529110B2 (en) | 2008-03-31 | 2016-12-27 | Westerngeco L. L. C. | Constructing a reduced order model of an electromagnetic response in a subterranean structure |
US7933750B2 (en) | 2008-04-02 | 2011-04-26 | Schlumberger Technology Corp | Method for defining regions in reservoir simulation |
CA2721008A1 (en) | 2008-04-11 | 2009-10-15 | Terraspark Geosciences, Llc | Visulation of geologic features using data representations thereof |
US8793111B2 (en) | 2009-01-20 | 2014-07-29 | Schlumberger Technology Corporation | Automated field development planning |
CA2720117C (en) | 2008-05-05 | 2017-11-28 | Exxonmobil Upstream Research Company | Systems, methods, and computer program products for modeling dynamic systems by visualizing a parameter space and narrowing the parameter space |
US8898017B2 (en) | 2008-05-05 | 2014-11-25 | Bp Corporation North America Inc. | Automated hydrocarbon reservoir pressure estimation |
WO2009138290A2 (en) | 2008-05-16 | 2009-11-19 | Ephesia Consult Sa | Multi-point reservoir modelling |
BRPI0912806A2 (en) | 2008-05-16 | 2017-05-23 | Chevron Usa Inc | multi-scale method for use in simulating fluid flow in a subsurface reservoir |
US8095349B2 (en) | 2008-05-30 | 2012-01-10 | Kelkar And Associates, Inc. | Dynamic updating of simulation models |
WO2009155274A1 (en) | 2008-06-16 | 2009-12-23 | Schlumberger Canada Limited | Streamline flow simulation of a model that provides a representation of fracture corridors |
US8355898B2 (en) | 2008-06-17 | 2013-01-15 | Chevron U.S.A. Inc. | System and method for modeling flow events responsible for the formation of a geological reservoir |
FR2933220B1 (en) * | 2008-06-27 | 2010-06-18 | Inst Francais Du Petrole | METHOD FOR CONSTRUCTING A HYBRID MESH FROM A CPG TYPE MESH |
BRPI0914102A2 (en) | 2008-07-03 | 2015-10-20 | Chevron Usa Inc | multiscale finite volume method and systems for use to simulate a fine scale geological model of a subsurface reservoir |
US8447522B2 (en) | 2008-07-03 | 2013-05-21 | Baker Hughes Incorporated | Method for estimating the probability of collision between wells |
US8339395B2 (en) | 2008-07-08 | 2012-12-25 | Lockheed Martin Corporation | Method and apparatus for model compression |
FR2935177B1 (en) | 2008-08-19 | 2010-10-29 | Inst Francais Du Petrole | METHOD FOR SETTING OIL TANK HISTORY USING LOCAL PARAMETERS |
US8255195B2 (en) | 2008-09-18 | 2012-08-28 | Geoscape Analytics, Inc | N-phasic element method for calculating a fully coupled response of multiphase compositional fluid flow and a system for uncertainty estimation |
US10590762B2 (en) | 2008-09-18 | 2020-03-17 | Geoscale, Inc. | N-phasic finite element method for calculating a fully coupled response of multiphase compositional fluid flow and a system for uncertainty estimation of the calculated reservoir response |
WO2010033716A2 (en) | 2008-09-19 | 2010-03-25 | Chevron U.S.A. Inc. | Method for optimizing well production in reservoirs having flow barriers |
EA201170472A1 (en) | 2008-09-19 | 2011-10-31 | Шеврон Ю.Эс.Эй. Инк. | SYSTEMS AND METHODS IMPLEMENTED BY A COMPUTER FOR USE WHEN MODELING THE GEOMECHANICAL SYSTEM OF THE COLLECTOR |
US8280709B2 (en) | 2008-10-03 | 2012-10-02 | Schlumberger Technology Corporation | Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations |
EP2361414A2 (en) | 2008-10-09 | 2011-08-31 | Chevron U.S.A. Inc. | Iterative multi-scale method for flow in porous media |
US8374836B2 (en) | 2008-11-12 | 2013-02-12 | Geoscape Analytics, Inc. | Methods and systems for constructing and using a subterranean geomechanics model spanning local to zonal scale in complex geological environments |
AU2009314461B2 (en) | 2008-11-14 | 2015-11-05 | Exxonmobil Upstream Research Company | Forming a model of a subsurface region |
US8301426B2 (en) | 2008-11-17 | 2012-10-30 | Landmark Graphics Corporation | Systems and methods for dynamically developing wellbore plans with a reservoir simulator |
BRPI0922705A2 (en) | 2008-12-03 | 2016-01-05 | Chevron Usa Inc | computer-implemented method and system for predicting fluid flow characteristics within a fractured underground reservoir |
BRPI0923011B1 (en) | 2008-12-18 | 2019-10-22 | Exxonmobil Upstream Res Co | method to model a turbidity current in a fluid |
CA2689341A1 (en) | 2008-12-31 | 2010-06-30 | Shell Internationale Research Maatschappij B.V. | Method and system for simulating fluid flow in an underground formation with uncertain properties |
US10060245B2 (en) | 2009-01-09 | 2018-08-28 | Halliburton Energy Services, Inc. | Systems and methods for planning well locations with dynamic production criteria |
US8095345B2 (en) | 2009-01-20 | 2012-01-10 | Chevron U.S.A. Inc | Stochastic inversion of geophysical data for estimating earth model parameters |
US8275589B2 (en) | 2009-02-25 | 2012-09-25 | Schlumberger Technology Corporation | Modeling a reservoir using a compartment model and a geomechanical model |
US8350851B2 (en) | 2009-03-05 | 2013-01-08 | Schlumberger Technology Corporation | Right sizing reservoir models |
US20110004447A1 (en) | 2009-07-01 | 2011-01-06 | Schlumberger Technology Corporation | Method to build 3D digital models of porous media using transmitted laser scanning confocal mircoscopy and multi-point statistics |
RU2549147C2 (en) | 2009-05-07 | 2015-04-20 | Сауди Арабиан Ойл Компани | Systems, computer-implemented methods and computer-readable program products to compute approximate well drainage pressure for reservoir simulator |
US8498852B2 (en) | 2009-06-05 | 2013-07-30 | Schlumberger Tehcnology Corporation | Method and apparatus for efficient real-time characterization of hydraulic fractures and fracturing optimization based thereon |
US20100312535A1 (en) | 2009-06-08 | 2010-12-09 | Chevron U.S.A. Inc. | Upscaling of flow and transport parameters for simulation of fluid flow in subsurface reservoirs |
GB2471139A (en) | 2009-06-19 | 2010-12-22 | Kongsberg Maritime As Oil And Gas | Method for providing reconciled estimates of three phase flow for individual wells and at individual locations in a hydrocarbon production process facility |
FR2947345B1 (en) | 2009-06-26 | 2011-07-15 | Inst Francais Du Petrole | METHOD FOR MODIFYING FACIAL PROPORTIONS WHEN SETTING HISTORY OF A GEOLOGICAL MODEL |
AU2010272254B2 (en) | 2009-07-13 | 2015-12-10 | Schlumberger Technology B.V. | Methods for characterization of petroleum fluid and application thereof |
FR2948215B1 (en) | 2009-07-16 | 2011-06-24 | Inst Francais Du Petrole | METHOD FOR GENERATING A HEXA-DOMINANT MESHING OF A FAILLED UNDERGROUND MEDIUM |
US8275593B2 (en) | 2009-07-16 | 2012-09-25 | University Of Regina | Reservoir modeling method |
US8532967B2 (en) | 2009-08-14 | 2013-09-10 | Schlumberger Technology Corporation | Executing a utility in a distributed computing system based on an integrated model |
FR2949586B1 (en) | 2009-08-26 | 2011-09-23 | Inst Francais Du Petrole | METHOD FOR OPERATING A PETROLEUM TANK FROM AN OPTIMIZED HISTORICAL SETTING |
US8655632B2 (en) | 2009-09-03 | 2014-02-18 | Schlumberger Technology Corporation | Gridless geological modeling |
US9410936B2 (en) | 2009-09-11 | 2016-08-09 | Schlumberger Technology Corporation | Methods and apparatus for characterization of petroleum fluid employing analysis of high molecular weight components |
US8818778B2 (en) | 2009-09-16 | 2014-08-26 | Chevron U.S.A. Inc. | Method for creating a 3D rock representation using petrophysical data |
WO2011037580A1 (en) | 2009-09-25 | 2011-03-31 | Landmark Graphics Corporation | Systems and methods for the quantitative estimate of production-forecast uncertainty |
US8922558B2 (en) | 2009-09-25 | 2014-12-30 | Landmark Graphics Corporation | Drawing graphical objects in a 3D subsurface environment |
US8515721B2 (en) | 2009-10-01 | 2013-08-20 | Schlumberger Technology Corporation | Method for integrated inversion determination of rock and fluid properties of earth formations |
US8429671B2 (en) | 2009-10-21 | 2013-04-23 | Exxonmobil Upstream Research Company | Integrated workflow builder for disparate computer programs |
US8743115B1 (en) * | 2009-10-23 | 2014-06-03 | Paradigm Sciences Ltd. | Systems and methods for coordinated editing of seismic data in dual model |
US8234073B2 (en) | 2009-10-23 | 2012-07-31 | Chevron U.S.A. Inc. | System and method for estimating geological architecture of a geologic volume |
US8606555B2 (en) | 2009-10-23 | 2013-12-10 | Chevron U.S.A. Inc. | System and method for modeling a geologic volume of interest |
EP2317348B1 (en) | 2009-10-30 | 2014-05-21 | Services Pétroliers Schlumberger | Method for building a depositional space corresponding to a geological domain |
AU2010318657B2 (en) | 2009-11-12 | 2016-07-28 | Exxonmobil Upstream Research Company | Method and system for rapid model evaluation using multilevel surrogates |
EP2507738B1 (en) | 2009-11-30 | 2019-05-01 | Exxonmobil Upstream Research Company | Adaptive newton's method for reservoir simulation |
US20130046524A1 (en) | 2009-12-15 | 2013-02-21 | Schlumberger Technology Corporation | Method for modeling a reservoir basin |
WO2011097055A2 (en) | 2010-02-02 | 2011-08-11 | Conocophillips Company | Multilevel percolation aggregation solver for petroleum reservoir simulations |
US8452580B2 (en) | 2010-02-26 | 2013-05-28 | Chevron U.S.A. Inc. | Method and system for using multiple-point statistics simulation to model reservoir property trends |
US8694261B1 (en) | 2010-03-12 | 2014-04-08 | Mark C. Robinson | 3D-well log invention |
EP2539744A4 (en) | 2010-03-19 | 2017-11-22 | Schlumberger Technology B.V. | Uncertainty estimation for large-scale nonlinear inverse problems using geometric sampling and covariance-free model compression |
US8271248B2 (en) | 2010-04-01 | 2012-09-18 | Schlumberger Technology Corporation | Methods and apparatus for characterization of petroleum fluids and applications thereof |
US8515720B2 (en) | 2010-04-06 | 2013-08-20 | Schlumberger Technology Corporation | Determine field fractures using geomechanical forward modeling |
US8731887B2 (en) | 2010-04-12 | 2014-05-20 | Exxonmobile Upstream Research Company | System and method for obtaining a model of data describing a physical structure |
WO2011132095A2 (en) | 2010-04-21 | 2011-10-27 | Schlumberger Canada Limited | Methods for characterization of petroleum reservoirs employing property gradient analysis of reservoir fluids |
US9134454B2 (en) | 2010-04-30 | 2015-09-15 | Exxonmobil Upstream Research Company | Method and system for finite volume simulation of flow |
WO2011138700A2 (en) | 2010-05-07 | 2011-11-10 | Schlumberger Canada Limited | Methods for characterizing asphaltene instability in reservoir fluids |
US8775142B2 (en) | 2010-05-14 | 2014-07-08 | Conocophillips Company | Stochastic downscaling algorithm and applications to geological model downscaling |
WO2011159372A1 (en) | 2010-06-15 | 2011-12-22 | Exxonmobil Upstream Research Company | Method and system for stabilizing formulation methods |
US8412501B2 (en) | 2010-06-16 | 2013-04-02 | Foroil | Production simulator for simulating a mature hydrocarbon field |
US8463586B2 (en) | 2010-06-22 | 2013-06-11 | Saudi Arabian Oil Company | Machine, program product, and computer-implemented method to simulate reservoirs as 2.5D unstructured grids |
US20110310101A1 (en) | 2010-06-22 | 2011-12-22 | Schlumberger Technology Corporation | Pillar grid conversion |
US9754056B2 (en) | 2010-06-29 | 2017-09-05 | Exxonmobil Upstream Research Company | Method and system for parallel simulation models |
US8359185B2 (en) | 2010-06-30 | 2013-01-22 | Saudi Arabian Oil Company | Reservoir simulation of giant subsurface reservoirs with accelerated phase equilibrium determination |
FR2962835B1 (en) * | 2010-07-16 | 2013-07-12 | IFP Energies Nouvelles | METHOD FOR GENERATING A HEXA-DOMINANT MESH OF A GEOMETRICALLY COMPLEX BASIN |
CA2801387A1 (en) | 2010-07-26 | 2012-02-02 | Exxonmobil Upstream Research Company | Method and system for parallel multilevel simulation |
US8599643B2 (en) | 2010-07-27 | 2013-12-03 | Schlumberger Technology Corporation | Joint structural dip removal |
US8447525B2 (en) | 2010-07-29 | 2013-05-21 | Schlumberger Technology Corporation | Interactive structural restoration while interpreting seismic volumes for structure and stratigraphy |
EP2599031A4 (en) | 2010-07-29 | 2014-01-08 | Exxonmobil Upstream Res Co | Methods and systems for machine-learning based simulation of flow |
US8457940B2 (en) | 2010-07-29 | 2013-06-04 | Schlumberger Technology Corporation | Model-consistent structural restoration for geomechanical and petroleum systems modeling |
EP2599030A4 (en) | 2010-07-29 | 2014-01-08 | Exxonmobil Upstream Res Co | Methods and systems for machine-learning based simulation of flow |
US9058445B2 (en) | 2010-07-29 | 2015-06-16 | Exxonmobil Upstream Research Company | Method and system for reservoir modeling |
US8515678B2 (en) | 2010-07-29 | 2013-08-20 | Schlumberger Technology Corporation | Chrono-stratigraphic and tectono-stratigraphic interpretation on seismic volumes |
WO2012015515A1 (en) | 2010-07-29 | 2012-02-02 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
EP2599023B1 (en) | 2010-07-29 | 2019-10-23 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
WO2012021119A1 (en) | 2010-08-09 | 2012-02-16 | Landmark Graphics Corporation | Systems and methods for creating a surface in a faulted space |
US9194974B2 (en) | 2010-09-02 | 2015-11-24 | Schlumberger Technology Corporation | Method to predict dense hydrocarbon saturations for high pressure high temperature |
CA2810212A1 (en) | 2010-09-02 | 2012-03-08 | Schlumberger Canada Limited | Thermodynamic modeling for optimized recovery in sagd |
AU2011295892A1 (en) | 2010-09-03 | 2013-05-02 | Chevron U.S.A. Inc. | Iterative method and system to construct robust proxy models for reservoir simulation |
US8386227B2 (en) | 2010-09-07 | 2013-02-26 | Saudi Arabian Oil Company | Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation |
US8635026B2 (en) | 2010-09-07 | 2014-01-21 | Saudi Arabian Oil Company | Determination of rock mechanics from applied force to area measures while slabbing core samples |
US8433551B2 (en) | 2010-11-29 | 2013-04-30 | Saudi Arabian Oil Company | Machine, computer program product and method to carry out parallel reservoir simulation |
US8798974B1 (en) | 2010-09-15 | 2014-08-05 | Alan Gordon Nunns | Method and system for interactive geological interpretation, modeling and restoration |
US9058446B2 (en) | 2010-09-20 | 2015-06-16 | Exxonmobil Upstream Research Company | Flexible and adaptive formulations for complex reservoir simulations |
CA2810745A1 (en) | 2010-09-20 | 2012-03-29 | Schlumberger Canada Limited | Methods for producing fluids from geological formation |
US20130311151A1 (en) | 2010-09-28 | 2013-11-21 | René-Edouard André Michel Plessix | Earth model estimation through an acoustic full waveform inversion of seismic data |
GB201017898D0 (en) | 2010-10-22 | 2010-12-01 | Internat Res Inst Of Stavanger | Earth model |
US20130204922A1 (en) | 2010-10-22 | 2013-08-08 | Amr Saad El-Bakry | Asset Control and Management System |
FR2966865B1 (en) | 2010-10-28 | 2015-05-15 | IFP Energies Nouvelles | METHOD FOR OPERATING A PETROLEUM STORAGE FROM HISTORICAL SETTING OF PRODUCTION DATA AND SEISMIC DATA. |
US9626466B2 (en) | 2010-11-23 | 2017-04-18 | Exxonmobil Upstream Research Company | Variable discretization method for flow simulation on complex geological models |
AU2010364957B2 (en) | 2010-11-30 | 2015-04-23 | Landmark Graphics Corporation | Systems and methods for reducing reservoir simulator model run time |
US20120143577A1 (en) | 2010-12-02 | 2012-06-07 | Matthew Szyndel | Prioritizing well drilling propositions |
EP3875994A1 (en) | 2010-12-08 | 2021-09-08 | Halliburton Energy Services, Inc. | Fluid properties including equation of state modeling with optical constraints |
WO2012082273A1 (en) | 2010-12-13 | 2012-06-21 | Chevron U.S.A. Inc. | Method and system for coupling reservoir and surface facility simulations |
US20120159124A1 (en) | 2010-12-15 | 2012-06-21 | Chevron U.S.A. Inc. | Method and system for computational acceleration of seismic data processing |
WO2012082928A2 (en) | 2010-12-16 | 2012-06-21 | Chevron U.S.A. Inc. | System and method for simulating fluid flow in a fractured reservoir |
AU2010365385B2 (en) | 2010-12-16 | 2015-02-19 | Landmark Graphics Corporation | Systems and methods for two-dimensional domain decomposition during parallel reservoir simulation |
US8660824B2 (en) * | 2010-12-23 | 2014-02-25 | Schlumberger Technology Corporation | Discretely gridding complex fracturing for simulation |
CN102110183B (en) | 2010-12-30 | 2011-09-28 | 中国石油化工股份有限公司胜利油田分公司地质科学研究院 | Numerical simulation method for reflecting fluid channeling of fluid along great rifts of reservoir |
US8583411B2 (en) | 2011-01-10 | 2013-11-12 | Saudi Arabian Oil Company | Scalable simulation of multiphase flow in a fractured subterranean reservoir as multiple interacting continua |
EA201391111A1 (en) | 2011-01-31 | 2013-12-30 | Лэндмарк Графикс Корпорейшн | SYSTEM AND METHOD FOR USE OF ARTIFICIAL NEURAL NETWORK FOR MODELING A HYDRAULIC OF PIPELINES IN THE SIMULATOR |
US8437999B2 (en) | 2011-02-08 | 2013-05-07 | Saudi Arabian Oil Company | Seismic-scale reservoir simulation of giant subsurface reservoirs using GPU-accelerated linear equation systems |
US8805659B2 (en) | 2011-02-17 | 2014-08-12 | Chevron U.S.A. Inc. | System and method for uncertainty quantification in reservoir simulation |
WO2012116296A2 (en) | 2011-02-24 | 2012-08-30 | Chevron U.S.A. Inc. | System and method for performing reservoir simulation using preconditioning |
US10534871B2 (en) | 2011-03-09 | 2020-01-14 | Schlumberger Technology Corporation | Method and systems for reservoir modeling, evaluation and simulation |
US10545260B2 (en) | 2011-04-15 | 2020-01-28 | Conocophillips Company | Updating geological facies models using the Ensemble Kalman filter |
US20120271609A1 (en) | 2011-04-20 | 2012-10-25 | Westerngeco L.L.C. | Methods and computing systems for hydrocarbon exploration |
WO2012158218A1 (en) | 2011-05-17 | 2012-11-22 | Exxonmobil Upstream Research Company | Method for partitioning parallel reservoir simulations in the presence of wells |
US8731891B2 (en) | 2011-07-28 | 2014-05-20 | Saudi Arabian Oil Company | Cluster 3D petrophysical uncertainty modeling |
US9279314B2 (en) | 2011-08-11 | 2016-03-08 | Conocophillips Company | Heat front capture in thermal recovery simulations of hydrocarbon reservoirs |
BR112014003504A2 (en) | 2011-08-16 | 2017-03-14 | Prad Res & Dev Ltd | system for producing fluids from an underground hydrocarbon reservoir, and system for producing fluids from an underground hydrocarbon reservoir traversed by an injection well and a production well |
FR2979152B1 (en) | 2011-08-17 | 2013-08-23 | IFP Energies Nouvelles | METHOD FOR CONSTRUCTING A GEOLOGICAL MODEL COMPRISING A STRATIGHAPHIC UNIT DEPOSITION. |
US8843353B2 (en) | 2011-08-25 | 2014-09-23 | Chevron U.S.A. Inc. | Hybrid deterministic-geostatistical earth model |
WO2013039606A1 (en) | 2011-09-15 | 2013-03-21 | Exxonmobil Upstream Research Company | Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations |
CA2849379C (en) | 2011-09-20 | 2016-11-29 | Landmark Graphics Corporation | System and method for coarsening in reservoir simulation system |
US10260317B2 (en) | 2011-09-20 | 2019-04-16 | Bp Corporation North America Inc. | Automated generation of local grid refinement at hydraulic fractures for simulation of tight gas reservoirs |
US20130085730A1 (en) | 2011-10-04 | 2013-04-04 | Gareth J. Shaw | Preconditioner for reservoir simulation |
CA2851279C (en) | 2011-10-11 | 2016-08-09 | Saudi Arabian Oil Company | High performance and grid computing with quality of service control |
US10519766B2 (en) | 2011-10-26 | 2019-12-31 | Conocophillips Company | Reservoir modelling with multiple point statistics from a non-stationary training image |
CN103946849A (en) | 2011-10-28 | 2014-07-23 | 界标制图有限公司 | Methods and systems for well planning based on a complex fracture model |
US9201164B2 (en) | 2011-11-15 | 2015-12-01 | Chevron U.S.A. Inc. | System and method of using spatially independent subsets of data to calculate property distribution uncertainty of spatially correlated reservoir data |
US9429678B2 (en) | 2011-12-31 | 2016-08-30 | Saudi Arabian Oil Company | Apparatus, computer readable media, and computer programs for estimating missing real-time data for intelligent fields |
US9097821B2 (en) | 2012-01-10 | 2015-08-04 | Chevron U.S.A. Inc. | Integrated workflow or method for petrophysical rock typing in carbonates |
FR2987138A1 (en) | 2012-02-22 | 2013-08-23 | Schlumberger Technology Corp | TITLE NOT RENTED. |
US8700549B2 (en) | 2012-05-23 | 2014-04-15 | King Fahd University Of Petroleum And Minerals | Method of predicting gas composition |
CA2873406C (en) | 2012-05-30 | 2018-06-26 | Landmark Graphics Corporation | Oil or gas production using computer simulation of oil or gas fields and production facilities |
EP2859186A4 (en) | 2012-06-08 | 2016-03-23 | Services Petroliers Schlumberger | Assessing reservoir connectivity in hydrocarbon reservoirs |
CA2876583C (en) | 2012-06-15 | 2016-11-08 | Landmark Graphics Corporation | Parallel network simulation apparatus, methods, and systems |
GB201214559D0 (en) | 2012-08-15 | 2012-09-26 | Infochem Comp Services Ltd | Physical property modelling |
US10036829B2 (en) | 2012-09-28 | 2018-07-31 | Exxonmobil Upstream Research Company | Fault removal in geological models |
US9390555B2 (en) | 2012-11-09 | 2016-07-12 | International Business Machines Corporation | Method to assess the impact of existing fractures and faults for reservoir management |
US20140136171A1 (en) | 2012-11-13 | 2014-05-15 | Chevron U.S.A. Inc. | Unstructured Grids For Modeling Reservoirs |
US10088596B2 (en) | 2013-03-15 | 2018-10-02 | Schlumberger Technology Corporation | Meshless representation of a geologic environment |
CA2904211A1 (en) | 2013-04-18 | 2014-10-23 | Halliburton Energy Services, Inc. | Device and method for parallel microfluidic pressure-volume-temperature analysis |
US10613073B2 (en) | 2013-04-18 | 2020-04-07 | Halliburton Energy Services, Inc. | Microfluidic optical computing device |
BR112015025755A2 (en) | 2013-05-15 | 2017-07-18 | Landmark Graphics Corp | reservoir basin modeling |
BR112015025872A2 (en) | 2013-05-15 | 2017-07-25 | Landmark Graphics Corp | method for creating clean seismic stratigraphic traces, and, program transport device |
US20150120199A1 (en) | 2013-10-31 | 2015-04-30 | Matthew S. Casey | Multiple Domain Processing For Combining Reservoir Models and Seismic Data |
US10319143B2 (en) | 2014-07-30 | 2019-06-11 | Exxonmobil Upstream Research Company | Volumetric grid generation in a domain with heterogeneous material properties |
US10359523B2 (en) | 2014-08-05 | 2019-07-23 | Exxonmobil Upstream Research Company | Exploration and extraction method and system for hydrocarbons |
WO2016069170A1 (en) | 2014-10-31 | 2016-05-06 | Exxonmobil Upstream Research Company | Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares |
AU2015339884B2 (en) | 2014-10-31 | 2018-03-15 | Exxonmobil Upstream Research Company | Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques |
WO2016070073A1 (en) | 2014-10-31 | 2016-05-06 | Exxonmobil Upstream Research Company | Managing discontinuities in geologic models |
EP3262444A1 (en) | 2015-02-25 | 2018-01-03 | Exxonmobil Upstream Research Company | Method for parameterizing a 3d domain with discontinuities |
-
2015
- 2015-07-23 US US14/807,748 patent/US10319143B2/en active Active
- 2015-07-23 WO PCT/US2015/041831 patent/WO2016018723A1/en active Application Filing
- 2015-07-23 CA CA2948667A patent/CA2948667A1/en not_active Abandoned
- 2015-07-23 EP EP15750178.4A patent/EP3175265A1/en not_active Withdrawn
- 2015-07-23 AU AU2015298233A patent/AU2015298233B2/en not_active Ceased
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080021684A1 (en) * | 2004-06-02 | 2008-01-24 | Jean-Claude Dulac | Method For Building A Three Dimensional Cellular Partition Of A Geological Domain |
WO2011059535A1 (en) * | 2009-11-12 | 2011-05-19 | Exxonmobil Upstream Research Company | Method and apparatus for reservoir modeling and simulation |
US20130246031A1 (en) * | 2010-12-08 | 2013-09-19 | Xiaohui Wu | Constructing Geologic Models From Geologic Concepts |
Also Published As
Publication number | Publication date |
---|---|
WO2016018723A1 (en) | 2016-02-04 |
US20160035130A1 (en) | 2016-02-04 |
CA2948667A1 (en) | 2016-02-04 |
US10319143B2 (en) | 2019-06-11 |
EP3175265A1 (en) | 2017-06-07 |
AU2015298233A1 (en) | 2017-02-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2015298233B2 (en) | Method for volumetric grid generation in a domain with heterogeneous material properties | |
EP3293552B1 (en) | System and method for editing geological models by switching between volume-based models and surface-based structural models augmented with stratigraphic fiber bundles | |
AU2011339017B2 (en) | Constructing geologic models from geologic concepts | |
US6256603B1 (en) | Performing geoscience interpretation with simulated data | |
US8965745B2 (en) | Grid from depositional space | |
AU2017301677B2 (en) | Method and system for generating a subsurface model | |
CN101303414B (en) | Method for generating ground layer surface and geologic body based on level set | |
GB2523869A (en) | Representation of unstructured grids | |
Ruiu et al. | Modeling channel forms and related sedimentary objects using a boundary representation based on non-uniform rational B-splines | |
NO20201045A1 (en) | Fluid simulator property representation | |
WO2024064126A1 (en) | Geologic modeling framework | |
Lelièvre et al. | 3D potential field inversion for wireframe surface geometry | |
US11947071B2 (en) | Fault radiation based grid compartmentalization | |
Gai et al. | Concept-based geologic modeling using function form representation | |
Patel et al. | Modeling terrains and subsurface geology | |
Liu et al. | Study on a computing technique suitable for true 3D modeling of complex geologic bodies | |
Syversveen et al. | A stochastic object model conditioned to high-quality seismic data | |
Bourges et al. | Advanced Approaches in Geostatistical Reservoir Modelling-Methods and Benefits | |
Li et al. | Volume construction from surface model base on spatial topology | |
Pellerin | Accounting for the geometrical complexity of structural models in Voronoi-based meshing methods | |
Mello et al. | A topologically-based framework for simulating complex geological processes | |
Chang et al. | Modeling salt bodies for 3D raytracing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FGA | Letters patent sealed or granted (standard patent) | ||
MK14 | Patent ceased section 143(a) (annual fees not paid) or expired |