NL7508225A - Material delivery process into ground for foundation - fills immediately after spoil removal - Google Patents
Material delivery process into ground for foundation - fills immediately after spoil removalInfo
- Publication number
- NL7508225A NL7508225A NL7508225A NL7508225A NL7508225A NL 7508225 A NL7508225 A NL 7508225A NL 7508225 A NL7508225 A NL 7508225A NL 7508225 A NL7508225 A NL 7508225A NL 7508225 A NL7508225 A NL 7508225A
- Authority
- NL
- Netherlands
- Prior art keywords
- spoil
- ground
- foundation
- material delivery
- delivery process
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
- E02D5/187—Bulkheads or similar walls made solely of concrete in situ the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Foundations (AREA)
Abstract
Process is for introducing material into the ground, from which the spoil is first excavated to a predetermined profile then at least partly filled with the material, being partic. for constructing dam foundations. The filling operation takes place immediately after spoil removal, and the filling material can be concrete, while during excavation reinforcing material can be inserted. Vibration can also be carried out during excavation and filling. Excavation can be effected by a profiled implement with one or more surfaces up which the spoil travels and then to the side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL7508225A NL7508225A (en) | 1975-07-10 | 1975-07-10 | Material delivery process into ground for foundation - fills immediately after spoil removal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL7508225A NL7508225A (en) | 1975-07-10 | 1975-07-10 | Material delivery process into ground for foundation - fills immediately after spoil removal |
Publications (1)
Publication Number | Publication Date |
---|---|
NL7508225A true NL7508225A (en) | 1977-01-12 |
Family
ID=19824125
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NL7508225A NL7508225A (en) | 1975-07-10 | 1975-07-10 | Material delivery process into ground for foundation - fills immediately after spoil removal |
Country Status (1)
Country | Link |
---|---|
NL (1) | NL7508225A (en) |
-
1975
- 1975-07-10 NL NL7508225A patent/NL7508225A/en unknown
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ES449490A1 (en) | Method and device for obtaining a water-tight shield in the soil with the use of nozzles | |
GB1444068A (en) | Method of blasting and reinforcing rock cavities | |
ES409572A1 (en) | Method for consolidating impermeable soils and pile provided thereby as fitted with spaced apart enlargements | |
NL7508225A (en) | Material delivery process into ground for foundation - fills immediately after spoil removal | |
GB1392471A (en) | Apparatus for shoring and refilling a trench | |
GB1252244A (en) | ||
JPS5721623A (en) | Treatment work for top of pile | |
JPS5664028A (en) | Sheathing construction work by antecedent support framework | |
JPS57108313A (en) | Construction work and device for cut-off wall of in-site driven pile row and head of earth auger therefor | |
JPS5568919A (en) | Construction of underground continuous wall | |
SE7901451L (en) | KIT AND DEVICE FOR BUILDING UNDER THE MARKET OF VERTICAL WALLS, WITH THE BEGINNING FROM AN UNDERGROUND AREA | |
JPS5670322A (en) | Construction of underground wall by column strip | |
GB1424112A (en) | Method and apparatus for producing sub-aqueous and other cast-in- place concrete structures in situ | |
ES8305877A1 (en) | Mining excavating process using the bord and pillar method. | |
JPS56163318A (en) | Settling guider for foundation pile | |
JPS5516172A (en) | Excavation work method and apparatus for preventing landslide at ditch scooping | |
GB1269274A (en) | Method and apparatus for reinforcing a foundation or ground retaining wall | |
JPS5685021A (en) | Driving method of pile | |
JPS5545910A (en) | Pile pulling method | |
GB884810A (en) | Improvements in or relating to the production of concrete piles | |
Jones | Deep Cutoffs in Pervious Alluvium, Combining Slurry Trenches and Grouting | |
DRUSHNAREV et al. | New Continuous-flow Process for Blast-hole Drilling in Hydraulic-engineering, Reclamation, and Water-resources Construction | |
SU600245A1 (en) | Device for forcing fixing mortar into soil | |
FR2410728A1 (en) | Step-advanced tunnel driving system - with concrete supporting arches formed in groove cut in working face before digging away spoil | |
JPS55161113A (en) | Constructing method for continuous underground wall |