Stegent et al., 2010 - Google Patents
Engineering a successful fracture-stimulation treatment in the Eagle Ford shaleStegent et al., 2010
- Document ID
- 3931103912188198102
- Author
- Stegent N
- Wagner A
- Mullen J
- Borstmayer R
- Publication year
- Publication venue
- SPE Unconventional Resources Conference/Gas Technology Symposium
External Links
Snippet
Abstract The Eagle Ford shale in south Texas is the one of the most recent developments in unconventional reservoir exploration. Numerous existing completion methods have been applied in this nano-darcy formation with various degrees of success. The horizontal Eagle …
- 238000004519 manufacturing process 0 abstract description 29
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/1015—Locating fluid leaks, intrusions or movements using tracers: using radioactivity
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/006—Production of coal-bed methane
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/119—Details, e.g. for locating perforating place or direction
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Stegent et al. | Engineering a successful fracture-stimulation treatment in the Eagle Ford shale | |
Kundert et al. | Proper evaluation of shale gas reservoirs leads to a more effective hydraulic-fracture stimulation | |
Mullen et al. | Lessons learned developing the Eagle Ford shale | |
Cox et al. | Unconventional resource play evaluation: a look at the Bakken Shale Play of North Dakota | |
Vulgamore et al. | Applying hydraulic fracture diagnostics to optimize stimulations in the Woodford Shale | |
Al-Momin et al. | Proving the concept of unconventional gas reservoirs in Saudi through multistage fractured horizontal wells | |
Scott et al. | Investigating hydraulic fracturing in tight gas sand and shale gas reservoirs in the Cooper Basin | |
Yi et al. | Preventing heel dominated fractures in horizontal well refracturing | |
Bagci et al. | Optimization of hydraulic fracturing and production enhancement: Case studies for us shale plays and tight sand reservoirs | |
Lv et al. | China Shale Gas Exploration: Early Sichuan basin Longmaxi shale gas stimulation and completion case study | |
Johnson Jr et al. | Completion, perforating and hydraulic fracturing design changes yield success in an area of problematic frac placement—the Cooper Basin, Australia | |
Al-Enezi et al. | First successful openhole lateral multistage acid frac in a complex unconventional carbonate reservoir North Kuwait | |
Lv et al. | Sichuan Basin Longmaxi shale gas stimulation and completion case study | |
Parker et al. | Technology integration: A methodology to enhance production in horizontal Wolfcamp shale wells in the Delaware basin | |
Gondalia et al. | Solving the Hydraulic Fracturing Puzzle in the HPHT KG Basin of India with Geomechanics-Enabled Design and Execution | |
Lehman et al. | Delaware Basin Bone Springs. A Study of the Evolving Completion Practices to Create an Economically Successful Play | |
Britt et al. | Hydraulic Fracturing of a Clay Rich Formation in Southern Chile: The Challenges & Successes | |
Zolnikov et al. | Massive Hydraulic Fracturing Using Linear Pads in the Achimov Reservoirs at the Urengoy Field | |
Ishteiwy et al. | ACA practical considerations: When is it accurate and how should it be used to improve reservoir stimulation | |
Kindi et al. | Production Enhancement of Heavy Oil Reservoir at South of Sultanate of Oman Salt Basin with Implementation of Design and Data Diagnostic Cycle of Hydraulic Fracturing Campaign | |
El-Jeaan et al. | New Insight in Developing Tight Fractured Carbonate Reservoirs, Mishrif Formation, West Kuwait | |
Manthari et al. | Propped Fracturing in Tight Carbonates Reservoir–A Case Study | |
Araujo et al. | Evaluating First Eagle Ford Shale Gas Well—Case History from Northern Mexico | |
Lv et al. | China's Early Stage Marine Shale Play Exploration: A Deep Asia Pacific Region Horizontal Multiple-Stage Frac: Case History, Operation, and Execution | |
Izurieta et al. | Pillar Fracturing Production Enhancement Results for an Unconventional Calcareous Shale in Ecuador |