Testing and design of a piled foundation project. A case historyFellenius et al., 2009
View PDF- Document ID
- 2524717705283311756
- Author
- Fellenius B
- Ochoa M
- Publication year
- Publication venue
- Geotechnical Engineering, Journal of the Southeast Asian Geotechnical Society
External Links
Snippet
Design for a large refinery expansion was undertaken at a site reclaimed from a lake about 40 years ago. The natural soils consist of sand deposited on normally consolidated, compressible post glacial lacustrine clay followed by silty clay till on limestone bedrock …
- 239000002689 soil 0 abstract description 20
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/34—Foundations for sinking or earthquake territories
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D1/00—Investigation of foundation soil in situ
- E02D1/02—Investigation of foundation soil in situ before construction work
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/20—Placing by pressure or pulling power
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/02—Placing by driving
- E02D7/06—Power-driven drivers
- E02D7/12—Drivers with explosion chambers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D23/00—Caissons; Construction or placing of caissons
- E02D23/08—Lowering or sinking caissons
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/0073—Details of sea bottom engaging footing
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Tomlinson et al. | Pile design and construction practice | |
Watts et al. | An instrumented trial of vibro ground treatment supporting strip foundations in a variable fill | |
Fellenius et al. | Static loading test on a 45 m long pipe pile in Sandpoint, Idaho | |
Eslami et al. | Piezocone and cone penetration test (CPTu and CPT) applications in foundation engineering | |
Kim et al. | Shear load transfer characteristics of drilled shafts in weathered rocks | |
Lee et al. | Equivalent pile load–head settlement curve using a bi-directional pile load test | |
Samtani et al. | Soils and foundations reference manual–Volume II | |
Gabrielaitis et al. | Estimation of settlements of bored piles foundation | |
Beim et al. | Results of dynamic and static load tests on helical piles in the varved clay of Massachusetts | |
Fellenius et al. | Response to load for four different bored piles | |
Fellenius et al. | Testing and design of a piled foundation project. A case history | |
Nguyen et al. | Bidirectional static loading tests on barrette piles. A case history from Ho Chi Minh City, Vietnam | |
Riker et al. | A comparison of static and dynamic pile test results | |
Attwooll et al. | Measured pile setup during load testing and production piling: I-15 corridor reconstruction project in Salt Lake City, Utah | |
Amini et al. | Pile loading tests at golden ears bridge | |
Fellenius et al. | Combination of O-cell test and conventional head-down test | |
McVay et al. | Determination of axial pile capacity of prestressed concrete cylinder piles | |
Mayne et al. | Axial Response of Driven Steel Pile in Clearwater, MN, Using Elastic Solution and Seismic Piezocone | |
Chan et al. | Stone columns | |
Tanghetti | Stability of Working Platforms for Tracked Plant | |
Sandip Kumar | Comparison of axial load capacity of piles from theoretical methods and static load tests | |
Akkus | Calculated versus measured static capacity for two pile types | |
Sinnreich et al. | Case histories of full-scale comparative load testing of base grouted and Ungrouted test shaft pairs | |
Thomas et al. | Load Test of a Large Bored Pile for the Golden Ears Bridge | |
Hruštinec | Analysis of The Time Course Of A Bridge Abutments Settlement |