Liu et al., 2018 - Google Patents
Design of the Gongbei tunnel using a very large cross-section pipe-roof and soil freezing methodLiu et al., 2018
- Document ID
- 2239298115644776959
- Author
- Liu J
- Ma B
- Cheng Y
- Publication year
- Publication venue
- Tunnelling and Underground Space Technology
External Links
Snippet
The Gongbei tunnel, as a critical part of the Zhuhai connection highway of the Hong Kong- Zhuhai-Macao Bridge project, is being constructed in Zhuhai, China. The tunnel, close to the Lingdingyang bay, is located in a very environmentally sensitive location with poor …
- 239000002689 soil 0 title abstract description 63
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/063—Tunnels submerged into, or built in, open water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls not used, see subgroups
- E02D29/0266—Retaining or protecting walls not used, see subgroups made up of preformed elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/0073—Details of sea bottom engaging footing
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Liu et al. | Design of the Gongbei tunnel using a very large cross-section pipe-roof and soil freezing method | |
Zhang et al. | Key techniques for the largest curved pipe jacking roof to date: A case study of Gongbei tunnel | |
Wu et al. | Leaking behavior of shield tunnels under the Huangpu River of Shanghai with induced hazards | |
CN108979659B (en) | Reinforcing structure and method for underpass structure of soft soil water-rich large-section tunnel group | |
CN110159284A (en) | Strand hydraulic reclamation stratum shield machine is ultra-shallow earth-covered, big longitudinal slope originates construction method | |
CN109236367A (en) | A tunnel structure with anti-seepage and drainage function and its freezing construction method | |
Liu et al. | Hydraulic fracture failure during excavation of a working shaft for subway station: Forensic diagnosis and postfailure rehabilitation | |
Zhou et al. | Key construction technologies for large river-crossing slurry shield tunnel: case study | |
Lunardi et al. | Brenner base tunnel & Isarco River underpass section: Several technical and operational solutions | |
Mandolini et al. | Experiences gathered from the construction of Napoli underground | |
Chen et al. | Application of new concept waterproofing in Xiang’an undersea tunnel, China | |
Schmall et al. | Ground-freezing experience on the east side access Northern Boulevard crossing, New York | |
Zhang et al. | Excavation Failure Cases and Analysis | |
CN114855874A (en) | Open excavation and freezing underground excavation combined construction method for underground communication passage access close to existing structure through pipe gallery | |
Sailer et al. | A new approach for compensation grouting in highly permeable gravel | |
Lee | The use of compensation grouting in tunnelling: a case study | |
Zhou et al. | Structural Design of Nan Tanhai Slurry Shield Tunnel for Gas Pipeline in the 2nd Pipeline Project of Guangdong Provincial Natural Gas Grid | |
Moh et al. | Geotechnical problems related to design and construction of the Taipei Transit Systems | |
CN217758974U (en) | Anti-seepage structure for the position of ground wall joints in ultra-deep foundation pit engineering | |
Withers | 42 Murdoch, Neptune and Clegg Houses in Moodkee Street, Rotherhithe | |
Statton et al. | Melbourne Metro cut and cover retaining wall construction types | |
Geilen et al. | 34 The BT Building, London Bridge Street | |
Kang et al. | Pipe piles and split-cables: reinforcing weak mine pits | |
Van Dorst et al. | Artificial ground freezing as a construction method for underground spaces in densely built up areas | |
Motallebi et al. | Permanent secant pile wall for underground transit station |