Poehlitz, 2017 - Google Patents
Structural Analysis of Overhead Crane in Simpson Strong-Tie LaboratoryPoehlitz, 2017
View PDF- Document ID
- 2082184731680177429
- Author
- Poehlitz A
- Publication year
External Links
Snippet
Since its opening in 2010, the Cal Poly's Simpson Strong-Tie Material Demonstration Laboratory has been used for multiple activities by the College of Architecture and Environmental Design. Currently, the bottom floor is used for Construction Management …
- 238000004458 analytical method 0 title description 16
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/14—Load-carrying floor structures formed substantially of prefabricated units with beams or girders laid in two directions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Rajendran et al. | Building Information Modeling: safety benefits & opportunities | |
Brosque et al. | Safety, quality, schedule, and cost impacts of ten construction robots | |
Wang et al. | Transportation scheduling for modules used in modular integrated construction | |
Irizarry et al. | Effect of safety and environmental variables on task durations in steel erection | |
Rashid et al. | Construction performance control in steel structures projects | |
Wuni et al. | Best practices for implementing industrialized construction projects: Lessons from nine case studies | |
Construction Management Committee of the ASCE Construction Division | Constructability and constructability programs: White paper | |
Poehlitz | Structural Analysis of Overhead Crane in Simpson Strong-Tie Laboratory | |
Proverbs et al. | An evaluation of transportation systems for high rise concrete construction | |
Kasbar | Investigating the performance of the construction process of an 18-storey mass timber hybrid building | |
Behm et al. | Construction safety and health through design | |
Ferner et al. | Pragmatic improvements to seismic resilience of non-structural elements: Practitioners perspective | |
Rashid et al. | Factors improving the crew productivity for the construction of steel structure projects | |
Slootman | Planning of Mega-Projects: Influence of execution planning on project performance | |
Ruby | Constructability of structural steel buildings | |
Toole et al. | Designing steel for construction safety | |
Smallwood | Designing for Construction Health, Safety, and Wellbeing: A South African Perspective | |
Alagić | Assembly and Maintenance of High Bay Warehouses on a Practical Example of a Metal Structure Installation Project | |
Treloar | Best Practices for Bridge Crane Implementation and Installation: A Case Study | |
Brown | Design for construction | |
Memarian | Development of high reliability construction work systems: lessons from production practices of high performance work crews | |
Karlsson et al. | Tools to prevent waste in material flow in housing projects | |
Sirait et al. | Risk-Based Evaluation of Large-Span Roof Building Structure using Roll Forming Construction Method to Increase Project Performance | |
Song et al. | Transportation-Induced Impact on a Prefinished Volumetric Modular House Using Trailer Bogie: Case Study | |
Lew et al. | Design, construction, and maintenance of structural and life safety systems |