Yoo et al., 2020 - Google Patents
Machine scheduling models based on reinforcement learning for minimizing due date violation and setup changeYoo et al., 2020
View PDF- Document ID
- 2089658708082197897
- Author
- Yoo W
- Seo J
- Kim D
- Kim K
- Publication year
- Publication venue
- Journal of Society for e-Business Studies
External Links
Snippet
Recently, manufacturers have been struggling to efficiently use production equipment as their production methods become more sophisticated and complex. Typical factors hindering the efficiency of the manufacturing process include setup cost due to job change. Especially …
- 230000002787 reinforcement 0 title abstract 3
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/30286—Information retrieval; Database structures therefor; File system structures therefor in structured data stores
- G06F17/30386—Retrieval requests
- G06F17/30424—Query processing
- G06F17/30533—Other types of queries
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N99/00—Subject matter not provided for in other groups of this subclass
- G06N99/005—Learning machines, i.e. computer in which a programme is changed according to experience gained by the machine itself during a complete run
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Li et al. | A discrete artificial bee colony algorithm for distributed hybrid flowshop scheduling problem with sequence-dependent setup times | |
Wang et al. | A data driven cycle time prediction with feature selection in a semiconductor wafer fabrication system | |
Chen et al. | Modeling and optimization of complex building energy systems with deep neural networks | |
Mokhtari et al. | Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate | |
Dong et al. | Balancing and sequencing of stochastic mixed-model assembly U-lines to minimise the expectation of work overload time | |
Guo et al. | Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach | |
Huang et al. | An internet-of-things-based production logistics optimisation method for discrete manufacturing | |
Bekker | Multi-objective buffer space allocation with the cross-entropy method | |
Tamilarasi | An enhanced genetic algorithm with simulated annealing for job-shop scheduling | |
Yoo et al. | Machine scheduling models based on reinforcement learning for minimizing due date violation and setup change | |
Reyes Levalle et al. | Collaborative production line control: Minimisation of throughput variability and WIP | |
Zhang et al. | Multi-agent-based hierarchical collaborative scheduling in re-entrant manufacturing systems | |
Bożek et al. | Flexible job shop with continuous material flow | |
Li et al. | An integrated release and dispatch policy for semiconductor wafer fabrication | |
Liu et al. | A new knowledge-guided multi-objective optimisation for the multi-AGV dispatching problem in dynamic production environments | |
Bulgak | Analysis and design of split and merge unpaced assembly systems by metamodelling and stochastic search | |
Yang et al. | Continuous flow modelling of multistage assembly line system dynamics | |
Saetta et al. | A decomposition approach for the performance analysis of a serial multi-echelon supply chain | |
Mishra et al. | Modeling the planning and scheduling across the outsourcing supply chain: a Chaos-based fast Tabu–SA approach | |
Scholz-Reiter et al. | Stability analysis of autonomously controlled production networks | |
Yao et al. | A decentralised multi-objective scheduling methodology for semiconductor manufacturing | |
Iwamura et al. | Real-time scheduling for holonic manufacturing systems based on estimation of future status | |
Zhou et al. | Tactical capacity planning for semiconductor manufacturing: MILP models and scalable distributed parallel algorithms | |
Mosadegh et al. | A control theoretical modelling for velocity tuning of the conveyor belt in a dynamic mixed-model assembly line | |
Aziz et al. | Petri Net model of repetitive push manufacturing with Polca to minimise value-added WIP |