Aslam et al., 2023 - Google Patents
Deployment of AI/ML Based Predictive Model for Early Detection of ESP FailureAslam et al., 2023
- Document ID
- 18360613710250627980
- Author
- Aslam M
- Reddicharla N
- Elmansour A
- Alshehhi K
- Vanam P
- Al Dhaheri B
- Al Ketbi A
- Ahmed S
- Ahmed M
- Al Shehhi S
- Al Sonbaty T
- Publication year
- Publication venue
- Abu Dhabi International Petroleum Exhibition and Conference
External Links
Snippet
Water injection is widely utilized technique for secondary Oil recovery. Aquifer water is produced from Water supply wells in aquifer zones and pumped out through Electrical Submersible Pumps (ESP). In ADNOC Onshore Water supply ESP are operated on run to …
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/30286—Information retrieval; Database structures therefor; File system structures therefor in structured data stores
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computer systems utilising knowledge based models
- G06N5/02—Knowledge representation
- G06N5/022—Knowledge engineering, knowledge acquisition
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/01—Social networking
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Andrade Marin et al. | ESP well and component failure prediction in advance using engineered analytics-a breakthrough in minimizing unscheduled subsurface deferments | |
Popa et al. | Integration of artificial intelligence and lean sigma for large-field production optimization: application to Kern River Field | |
Hoffman et al. | Identifying casing failures with signature fracturing treatment pressure behavior | |
Aslam et al. | Deployment of AI/ML Based Predictive Model for Early Detection of ESP Failure | |
O'Brien et al. | Maximizing mature field production-A novel approach to screening mature fields revitalization options | |
Cullick et al. | Optimizing field development concepts for complex offshore production systems | |
Mata et al. | Automated Reservoir Management Workflows to Identify Candidates and Rank Opportunities for Production Enhancement and Cost Optimization in a Giant Field in Offshore Abu Dhabi | |
Shekhawat et al. | Well Intervention Opportunity Management Using Artificial Intelligence and Machine Learning | |
Mata et al. | Expert Advisory System for Production Surveillance and Optimization Assisted by Artificial Intelligence | |
Devshali et al. | Predicting ESP failures Using Artificial Intelligence for Improved Production Performance in One of the Offshore Fields in India | |
Reddicharla et al. | ESP Failure Prediction in Water Supply Wells Using Unsupervised Learning | |
Konstantin et al. | Specifics of development, infrastructure construction and production of oil-gas-condensate fields. Integrated model application experience | |
Al-Kadem et al. | Smart oilfield technologies and management: Maximizing real-time surveillance and utilization | |
Andrade Marin et al. | Real Time Implementation of ESP Predictive Analytics-Towards Value Realization from Data Science | |
Al Jawhari et al. | Integration of a Production Optimization System with Intelligent Well Surveillance for an Effective Reservoir Management in Abu Dhabi Field | |
Saputelli et al. | Integrating production operations and economics under uncertain conditions | |
Tiwari et al. | Production optimisation in mature fields | |
Romero Quishpe et al. | Innovative artificial intelligence approach in vaca muerta shale oil wells for real time optimization | |
Reddicharla et al. | Automated Well Portfolio Optimization for a Mature Hydrocarbon Field in the Middle East | |
Gyara et al. | Managing the production lifecycle: a framework for scalable digital oilfield implementations | |
Reddicharla et al. | A Novel Digital Framework for Intelligent and Real-Time Water Injection System Management | |
Jain et al. | A smart software system for flow assurance management | |
Lima et al. | State-of-art digital oilfield implementation in petrobras campos basin | |
Shyeh et al. | Examples of Right-Time Decisions from High Frequency Data | |
Hacker | An IOC's experience in implementing digital oilfield technologies |