Kalabayev et al., 2020 - Google Patents
Combining Technologies Optimises Acid Stimulation: Field Case Studies in KazakhstanKalabayev et al., 2020
- Document ID
- 17065494659299472114
- Author
- Kalabayev R
- Kruglov R
- Publication year
- Publication venue
- SPE Asia Pacific Oil and Gas Conference and Exhibition
External Links
Snippet
Oil and gas companies operating carbonate oil and gas condensate fields in Kazakhstan have been carrying out acid stimulation activities leading to a substantial increase in hydrocarbon production. Nearly all treatments were considered a success. Nevertheless, a …
- 239000002253 acid 0 title abstract description 101
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/08—Screens or liners
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/119—Details, e.g. for locating perforating place or direction
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/006—Production of coal-bed methane
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface or from the surface to the well, e.g. for logging while drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; MISCELLANEOUS COMPOSITIONS; MISCELLANEOUS APPLICATIONS OF MATERIALS
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/60—Compositions for stimulating production by acting on the underground formation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Hejl et al. | Extreme multistage fracturing improves vertical coverage and well performance in the Lost Hills field | |
Romanson et al. | Novel, multistage stimulation processes can help achieve and control branch fracturing and increase stimulated reservoir volume for unconventional reservoirs | |
Talib et al. | Holistic Customized Approach to Address Practical Challenges for the Large Scale Implementation of Limited Entry Liners Completions at ADNOC Onshore Fields | |
Jackson et al. | Completion Optimization with Ceramics Provides Step Changes in Horizontal Performance for the 2nd Bone Spring Formation–A Southeastern New Mexico Case History | |
Abass et al. | A Case History of Completing and Fracture Stimulating a Horizontal Well | |
Kalabayev et al. | Combining Technologies Optimises Acid Stimulation: Field Case Studies in Kazakhstan | |
Samuelson et al. | Optimizing horizontal completions in the Cleveland tight gas sand | |
Carrasco et al. | Achieving a More Efficient Frac Network for Horizontal Development of the Bone Spring Sandstone | |
Al-Enezi et al. | Single Phase Retarded Acid System with Degradable Fibers Unlocks Production Potential in Tuba Formation, North Kuwait | |
Rahim et al. | Improved Reservoir Management Strategy via Limited Entry Multi-Stage Completion Boosts Production from Massive Carbonate Reservoirs in Saudi Arabia | |
Kalabayev et al. | Increasing the efficiency of carbonate acidizing: Kazakhstan case studies | |
Qinghai et al. | Multi-Stage horizontal fracturing in casing for low permeability reservoirs | |
Peak et al. | Coiled-tubing-deployed fracturing service yields increase in completion efficiency | |
Ritchie et al. | Re-Stimulation of Horizontal Well Water Injectors in the Danish Halfdan Field Using a Revised Diversion Approach | |
Siddiqui et al. | Enhance of Oil Production from an Old Well in Thin Carbonate Reservoir through Acid Tunneling-A Case Study | |
Al Mutawa et al. | Application of a highly efficient multistage stimulation technique for horizontal wells | |
McDaniel | A Review of Design Considerations for Fracture Stimulation of Highly Deviated Wellbores | |
Salah et al. | First application of cemented sliding sleeves with degradable drop ball technique optimizes horizontal multistage fracturing operations in the Middle East: Egypt western desert case study | |
Ilfi et al. | From Zero to Hero: A New Breakthrough of Stimulation Method by Combining Acidizing and Cyclic Extended Breakdown in Sawah Field | |
Dunlop et al. | New Coiled-Tubing-Deployed Multizone Stimulation Method Increases Reservoir Access | |
Bela et al. | World First Extension Pack with 7" Enhanced Single Trip Multi Zone System: Success Case and Learning Points on the Installation and Treatment Design | |
Al-Sabea et al. | A Dynamic Shift in Stimulation and Completion Strategy to Develop the Complex Mishrif Reservoir of Minagish Field, Western Kuwait | |
Kumar et al. | Stimulation Challenges and Solutions in Complex Carbonate Reservo | |
McDuff et al. | An Engineered Approach to Acid Stimulation Strategies for Wells in the Kurdistan Region of Iraq | |
Hegazy et al. | Unlocking Offshore Brownfield's Oil Reserves: A Pioneering Approach with Acid Stimulation and Diversion Methods-Insights from the Gulf of Suez |