Sawicki et al., 2018 - Google Patents
Mixed public transport lines construction and vehicle's depots location problemsSawicki et al., 2018
View PDF- Document ID
- 16266564483830258126
- Author
- Sawicki P
- Fierek S
- Publication year
- Publication venue
- Recent Advances in Traffic Engineering for Transport Networks and Systems: 14th Scientific and Technical Conference" Transport Systems. Theory & Practice 2017" Selected Papers
External Links
Snippet
The paper deals with the problem of simultaneous consideration of transport lines construction and decision on vehicle's depots location problems in the public transport system. The authors have proposed a cost oriented mathematical model for solving a …
- 238000010276 construction 0 title abstract description 17
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0637—Strategic management or analysis
- G06Q10/06375—Prediction of business process outcome or impact based on a proposed change
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
- G06Q10/047—Optimisation of routes, e.g. "travelling salesman problem"
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C21/00—Navigation; Navigational instruments not provided for in preceding groups
- G01C21/26—Navigation; Navigational instruments not provided for in preceding groups specially adapted for navigation in a road network
- G01C21/34—Route searching; Route guidance
- G01C21/3453—Special cost functions, i.e. other than distance or default speed limit of road segments
- G01C21/3492—Special cost functions, i.e. other than distance or default speed limit of road segments employing speed data or traffic data, e.g. real-time or historical
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Yao et al. | ADMM-based problem decomposition scheme for vehicle routing problem with time windows | |
Tong et al. | Customized bus service design for jointly optimizing passenger-to-vehicle assignment and vehicle routing | |
Miandoabchi et al. | Hybrid evolutionary metaheuristics for concurrent multi-objective design of urban road and public transit networks | |
Posada et al. | The integrated dial-a-ride problem with timetabled fixed route service | |
Verbas et al. | Time-dependent intermodal A* algorithm: Methodology and implementation on a large-scale network | |
Friedrich et al. | A modeling approach for matching ridesharing trips within macroscopic travel demand models | |
Lavrinenko et al. | Transport accessibility as an indicator of regional development | |
Gkiotsalitis | A model for modifying the public transport service patterns to account for the imposed COVID-19 capacity | |
Khakbaz et al. | A model for locating park-and-ride facilities on urban networks based on maximizing flow capture: A case study of Isfahan, Iran | |
Sayarshad et al. | Optimizing dynamic switching between fixed and flexible transit services with an idle-vehicle relocation strategy and reductions in emissions | |
Mrad et al. | Optimal consumed electric energy while sequencing vehicle trips in a personal rapid transit transportation system | |
Zheng et al. | Network design for personal rapid transit under transit-oriented development | |
Fu et al. | The pickup and delivery problem with synchronized en-route transfers for microtransit planning | |
Almasi et al. | Analysis of feeder bus network design and scheduling problems | |
Long et al. | Synchronizing last trains of urban rail transit system to better serve passengers from late night trains of high-speed railway lines | |
Benedict | Shared mobility intelligence using permissioned blockchains for smart cities | |
Poorzahedy et al. | An ant system application to the bus network design problem: an algorithm and a case study | |
Li et al. | Public transport customer satisfaction evaluation using an extended thermodynamic method: a case study of Shanghai, China | |
Sawicki et al. | Mixed public transport lines construction and vehicle’s depots location problems | |
Khayati et al. | Household activity pattern problem with autonomous vehicles | |
Barra et al. | Solving the transit network design problem with constraint programming | |
Yaghini et al. | Capacity consumption analysis using heuristic solution method for under construction railway routes | |
Guan et al. | Path-based formulations for the design of on-demand multimodal transit systems with adoption awareness | |
Cheung et al. | System optimal re-routing transit assignment heuristic: A theoretical framework and large-scale case study | |
Chanta et al. | A single allocation p-hub maximal covering model for optimizing railway station location |