Sawicki et al., 2018 - Google Patents
Mixed public transport lines construction and vehicle's depots location problemsSawicki et al., 2018
View PDF- Document ID
- 16266564483830258126
- Author
- Sawicki P
- Fierek S
- Publication year
- Publication venue
- Recent Advances in Traffic Engineering for Transport Networks and Systems: 14th Scientific and Technical Conference" Transport Systems. Theory & Practice 2017" Selected Papers
External Links
Snippet
The paper deals with the problem of simultaneous consideration of transport lines construction and decision on vehicle's depots location problems in the public transport system. The authors have proposed a cost oriented mathematical model for solving a …
- 238000010276 construction 0 title abstract description 17
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0637—Strategic management or analysis
- G06Q10/06375—Prediction of business process outcome or impact based on a proposed change
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
- G06Q10/047—Optimisation of routes, e.g. "travelling salesman problem"
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C21/00—Navigation; Navigational instruments not provided for in preceding groups
- G01C21/26—Navigation; Navigational instruments not provided for in preceding groups specially adapted for navigation in a road network
- G01C21/34—Route searching; Route guidance
- G01C21/3453—Special cost functions, i.e. other than distance or default speed limit of road segments
- G01C21/3492—Special cost functions, i.e. other than distance or default speed limit of road segments employing speed data or traffic data, e.g. real-time or historical
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/01—Social networking
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Posada et al. | The integrated dial-a-ride problem with timetabled fixed route service | |
Verbas et al. | Time-dependent intermodal A* algorithm: Methodology and implementation on a large-scale network | |
Lavrinenko et al. | Transport accessibility as an indicator of regional development | |
Friedrich et al. | A modeling approach for matching ridesharing trips within macroscopic travel demand models | |
Parragh et al. | Solving routing problems with pairwise synchronization constraints | |
Mrad et al. | Optimal consumed electric energy while sequencing vehicle trips in a personal rapid transit transportation system | |
Klier et al. | Urban public transit network optimization with flexible demand | |
Polimeni et al. | Optimising waiting at nodes in time-dependent networks: cost functions and applications | |
Sawik et al. | Selected multi-criteria green vehicle routing problems | |
Poorzahedy et al. | An ant system application to the bus network design problem: an algorithm and a case study | |
Li et al. | Public transport customer satisfaction evaluation using an extended thermodynamic method: a case study of Shanghai, China | |
Zhu et al. | Time-optimal and privacy preserving route planning for carpool policy | |
Sawicki et al. | Mixed public transport lines construction and vehicle’s depots location problems | |
Khayati et al. | Household activity pattern problem with autonomous vehicles | |
Guan et al. | Path-based formulations for the design of on-demand multimodal transit systems with adoption awareness | |
Balardino et al. | Heuristic and exact approach for the close enough ridematching problem | |
Kim et al. | An equilibrium network design model with a social cost function for multimodal networks | |
Chanta et al. | A single allocation p-hub maximal covering model for optimizing railway station location | |
Frisch et al. | A mixed integer linear program for optimizing the utilization of locomotives with maintenance constraints | |
Zhang et al. | A study on the paths choice of intermodal transport based on reliability | |
Kuo | Design method using hybrid of line-type and circular-type routes for transit network system optimization | |
Raviv et al. | Introduction to the special issue on shared mobility systems | |
Vale et al. | Intermodal routing model for sustainable transport through multi-objective optimization | |
Klug | Freight train routing | |
Xu et al. | Tripartite equilibrium strategy for a carbon tax setting problem in air passenger transport |