Jing et al., 2018 - Google Patents
Application of fuzzy analytic hierarchy process in the risk assessment of dangerous small-sized reservoirsJing et al., 2018
- Document ID
- 16020967431288323295
- Author
- Jing M
- Jie Y
- Shou-yi L
- Lu W
- Publication year
- Publication venue
- International Journal of Machine Learning and Cybernetics
External Links
Snippet
There is large number of small-sized reservoirs and widely distributed in mainland of China, but most of them short of management or the security situation is grim. Once the dam break, the loss caused by damage is very serious. Therefore, it is very necessary to look for a …
- 238000000034 method 0 title description 16
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/02—Banking, e.g. interest calculation, credit approval, mortgages, home banking or on-line banking
- G06Q40/025—Credit processing or loan processing, e.g. risk analysis for mortgages
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/06—Investment, e.g. financial instruments, portfolio management or fund management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public service
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/08—Insurance, e.g. risk analysis or pensions
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Jing et al. | Application of fuzzy analytic hierarchy process in the risk assessment of dangerous small-sized reservoirs | |
Li et al. | A multi-criteria decision making method for urban flood resilience evaluation with hybrid uncertainties | |
Zou et al. | Comprehensive flood risk assessment based on set pair analysis-variable fuzzy sets model and fuzzy AHP | |
Xun et al. | Research on the urban resilience evaluation with hybrid multiple attribute TOPSIS method: An example in China | |
Zeng et al. | Set pair analysis for karst waterlogging risk assessment based on AHP and entropy weight | |
Ribas et al. | A multicriteria fuzzy approximate reasoning approach for risk assessment of dam safety | |
CN110503805A (en) | Pipeline Geological Hazards Monitoring method for early warning and device | |
Luo et al. | Flood disaster resilience evaluation of Chinese regions: integrating the hesitant fuzzy linguistic term sets with prospect theory | |
Cikmaz et al. | Flood susceptibility mapping using fuzzy analytical hierarchy process for Cedar Rapids, Iowa | |
Su et al. | A method for evaluating sea dike safety | |
Bin et al. | Urban flood risk assessment characterizing the relationship among hazard, exposure, and vulnerability | |
Ding et al. | Risk assessment of highway structures in natural disaster for the property insurance | |
Su et al. | Optimization of reinforcement strategies for dangerous dams considering time-average system failure probability and benefit–cost ratio using a life quality index | |
Özkan et al. | Evaluation of Asian countries using data center security index: a spherical fuzzy AHP-based EDAS approach | |
Lai et al. | A method for the hazard assessment of regional geological disasters: a case study of the Panxi area, China | |
Sun et al. | Urban flooding risk assessment based on FAHP–EWM combination weighting: a case study of Beijing | |
Li et al. | Operational safety risk assessment of water diversion infrastructure based on FMEA with fuzzy inference system | |
Tu et al. | Flood risk assessment of metro stations based on the SMAA-2-FFS-H method: A case study of the “7· 20” rainstorm in Zhengzhou, China | |
Zhang et al. | A multicriteria small modular reactor site selection model under long-term variations of climatic conditions--A case study for the province of Saskatchewan, Canada | |
Chen et al. | A comprehensive multi‐hazard risk assessment model for an urban agglomeration with multiple factors | |
Shen et al. | Risk dynamics modeling of reservoir dam break for safety control in the emergency response process | |
Yang et al. | A novel multi-objective optimization framework to allocate support funds for flash flood reduction based on multiple vulnerability assessment | |
Nie et al. | Diagnosis of Critical Risk Sources in the Operation Safety of the Central Route Project of South‐to‐North Water Diversion Based on the Improved FMEA Method | |
Ribas et al. | Prioritization of hydroelectric power plant earth dam safety procedures: a multi-criteria approach | |
Cheng et al. | Safety grade evaluation of aqueduct structure based on fuzzy cloud theory analysis |