Jing et al., 2018 - Google Patents

Application of fuzzy analytic hierarchy process in the risk assessment of dangerous small-sized reservoirs

Jing et al., 2018

Document ID
16020967431288323295
Author
Jing M
Jie Y
Shou-yi L
Lu W
Publication year
Publication venue
International Journal of Machine Learning and Cybernetics

External Links

Snippet

There is large number of small-sized reservoirs and widely distributed in mainland of China, but most of them short of management or the security situation is grim. Once the dam break, the loss caused by damage is very serious. Therefore, it is very necessary to look for a …
Continue reading at link.springer.com (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0635Risk analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/02Banking, e.g. interest calculation, credit approval, mortgages, home banking or on-line banking
    • G06Q40/025Credit processing or loan processing, e.g. risk analysis for mortgages
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/06Investment, e.g. financial instruments, portfolio management or fund management
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public service
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/08Insurance, e.g. risk analysis or pensions
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/30Information retrieval; Database structures therefor; File system structures therefor
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"

Similar Documents

Publication Publication Date Title
Jing et al. Application of fuzzy analytic hierarchy process in the risk assessment of dangerous small-sized reservoirs
Li et al. A multi-criteria decision making method for urban flood resilience evaluation with hybrid uncertainties
Zou et al. Comprehensive flood risk assessment based on set pair analysis-variable fuzzy sets model and fuzzy AHP
Xun et al. Research on the urban resilience evaluation with hybrid multiple attribute TOPSIS method: An example in China
Zeng et al. Set pair analysis for karst waterlogging risk assessment based on AHP and entropy weight
Ribas et al. A multicriteria fuzzy approximate reasoning approach for risk assessment of dam safety
CN110503805A (en) Pipeline Geological Hazards Monitoring method for early warning and device
Luo et al. Flood disaster resilience evaluation of Chinese regions: integrating the hesitant fuzzy linguistic term sets with prospect theory
Cikmaz et al. Flood susceptibility mapping using fuzzy analytical hierarchy process for Cedar Rapids, Iowa
Su et al. A method for evaluating sea dike safety
Bin et al. Urban flood risk assessment characterizing the relationship among hazard, exposure, and vulnerability
Ding et al. Risk assessment of highway structures in natural disaster for the property insurance
Su et al. Optimization of reinforcement strategies for dangerous dams considering time-average system failure probability and benefit–cost ratio using a life quality index
Özkan et al. Evaluation of Asian countries using data center security index: a spherical fuzzy AHP-based EDAS approach
Lai et al. A method for the hazard assessment of regional geological disasters: a case study of the Panxi area, China
Sun et al. Urban flooding risk assessment based on FAHP–EWM combination weighting: a case study of Beijing
Li et al. Operational safety risk assessment of water diversion infrastructure based on FMEA with fuzzy inference system
Tu et al. Flood risk assessment of metro stations based on the SMAA-2-FFS-H method: A case study of the “7· 20” rainstorm in Zhengzhou, China
Zhang et al. A multicriteria small modular reactor site selection model under long-term variations of climatic conditions--A case study for the province of Saskatchewan, Canada
Chen et al. A comprehensive multi‐hazard risk assessment model for an urban agglomeration with multiple factors
Shen et al. Risk dynamics modeling of reservoir dam break for safety control in the emergency response process
Yang et al. A novel multi-objective optimization framework to allocate support funds for flash flood reduction based on multiple vulnerability assessment
Nie et al. Diagnosis of Critical Risk Sources in the Operation Safety of the Central Route Project of South‐to‐North Water Diversion Based on the Improved FMEA Method
Ribas et al. Prioritization of hydroelectric power plant earth dam safety procedures: a multi-criteria approach
Cheng et al. Safety grade evaluation of aqueduct structure based on fuzzy cloud theory analysis