Krishnamoorthy et al., 2011 - Google Patents
Production inventory with service time and vacation to the serverKrishnamoorthy et al., 2011
- Document ID
- 15923943803896193157
- Author
- Krishnamoorthy A
- Narayanan V
- Publication year
- Publication venue
- IMA Journal of Management Mathematics
External Links
Snippet
This paper considers a production inventory with positive service time. The time for producing each item is assumed to follow a 'Markovian production scheme'. Because of this, correlation automatically gets into the production process. The customer arrival process …
- 238000004519 manufacturing process 0 title abstract description 82
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for programme control, e.g. control unit
- G06F9/06—Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5061—Partitioning or combining of resources
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce, e.g. shopping or e-commerce
- G06Q30/02—Marketing, e.g. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards; Price estimation or determination
- G06Q30/0202—Market predictions or demand forecasting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Krishnamoorthy et al. | Production inventory with service time and vacation to the server | |
Zhao et al. | A queueing-inventory system with two classes of customers | |
Ke et al. | Cost analysis of the M/M/R machine repair problem with balking, reneging, and server breakdowns | |
Wang et al. | An effective heuristic for flexible job-shop scheduling problem with maintenance activities | |
Reiman et al. | Asymptotically optimal inventory control for assemble-to-order systems with identical lead times | |
Wang et al. | A MPN-based scheduling model for IoT-enabled hybrid flow shop manufacturing | |
Trabelsi et al. | Heuristics and metaheuristics for mixed blocking constraints flowshop scheduling problems | |
US20150271023A1 (en) | Cloud estimator tool | |
Sleptchenko et al. | Joint optimization of redundancy level and spare part inventories | |
Rebai et al. | Earliness–tardiness minimization on a single machine to schedule preventive maintenance tasks: metaheuristic and exact methods | |
Fernandes et al. | Production control systems: Literature review, classification, and insights regarding practical application | |
Terekhov et al. | Queueing-theoretic approaches for dynamic scheduling: a survey | |
Renna | Influence of maintenance policies on multi-stage manufacturing systems in dynamic conditions | |
Giglio | Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times | |
Cheong | Joint inventory and transshipment control for perishable products of a two-period lifetime | |
Geiger et al. | Knowledge-based machine scheduling under consideration of uncertainties in master data | |
Wang et al. | Profit analysis of the M/Ek/1 machine repair problem with a non-reliable service station | |
Wu et al. | Analysis of an M/G/1 queue with N-policy, single vacation, unreliable service station and replaceable repair facility | |
Ke et al. | Optimal (d, c) vacation policy for a finite buffer M/M/c queue with unreliable servers and repairs | |
EP3812856B1 (en) | Distributed multi-node control system and method | |
Mahnam et al. | A branch-and-bound algorithm for minimizing the sum of maximum earliness and tardiness with unequal release times | |
CN113779982A (en) | Automatic generation method and system for sales purchase processing list, server and storage medium | |
Luo et al. | Optimal control policy of M/G/1 queueing system with delayed randomized multiple vacations under the modified min (N, D)-policy control | |
Moratori et al. | Integrating rush orders into existent schedules for a complex job shop problem | |
Xie et al. | Flexibility design in loss and queueing systems: efficiency of k-chain configuration |