Carlsson et al., 2007 - Google Patents

Construction experiences from underground works at Forsmark. Compilation report

Carlsson et al., 2007

View PDF
Document ID
15517731285336987271
Author
Carlsson A
Christiansson R
Publication year

External Links

Snippet

The main objective with this report, the Construction Experience Compilation Report (CECR), is to compile experiences from the underground works carried out at Forsmark, primarily construction experiences from the tunnelling of the two cooling water tunnels of the …
Continue reading at www.osti.gov (PDF) (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Lay-outs therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Lay-outs therefor
    • E21C41/26Methods of surface mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C47/00Machines for obtaining or the removal of materials in open-pit mines

Similar Documents

Publication Publication Date Title
Brown et al. ICE Manual of Geotechnical Engineering, Volume II: Geotechnical design, construction and verification
Sinha Underground structures: design and instrumentation
Bieniawski et al. Critical assessment of RMR-based tunnel design practices: A practical engineer’s approach
Lang Span design for entry-type excavations
CN102182866A (en) Backfilling process for large ultra-deep circulating water pipe
Carlsson et al. Construction experiences from underground works at Forsmark. Compilation report
Asthana et al. Recent advances in dam engineering
Perras Tunnelling in horizontally laminated ground: the influence of lamination thickness on anisotropic behaviour and practical observations from the Niagara Tunnel Project
Winter et al. Design and construction considerations
John et al. ICE manual of geotechnical engineering
Zhou et al. Rock engineering practice for development of underground caverns in Singapore
Sullivan Hydromechanical coupling concepts for mine slopes
Carlsson et al. Construction experiences from underground works at Oskarshamn. Compilation report
Ongodia Geotechnical engineering design of a tunnel support system-a case study of Karuma (600MW) hydropower project
Baines et al. DINORWIG PUMPED STORAGE SCHEME. PART 1: DESIGN. PART 2: CONSTRUCTION.
Brown et al. ICE Manual of Geotechnical Engineering, Volume I: Geotechnical engineering principles, problematic soils and site investigation
Chen et al. TBM Construction in Special Stratum
Mikkola et al. Cave-ins in the Päijänne Tunnel and their repair
Songa et al. Application of Raise Boring Crossing Technology in Domestic Oil and Gas Pipeline Project
Keaton Construction geology; as-built conditions
Gray 6 Subsidence over abandoned mines: US experience
Sütcüoğlu A case study: A deep retaining system construction with pre-stressed anchors
Schmoll et al. North American Tunneling 2002, Ozdemir (ed.)© 2002 Swets & Zeitlinger, Lisse, ISBN 90 5809 376 X Geotechnical characterization for a 34-mile long hard rock tunnel in San Diego, California
Bashir et al. Inflows in uranium mines of northern Saskatchewan: risks and mitigation
Jasperse et al. Excavated and backfilled cutoffs (Category 1)