Construction experiences from underground works at Forsmark. Compilation reportCarlsson et al., 2007
View PDF- Document ID
- 15517731285336987271
- Author
- Carlsson A
- Christiansson R
- Publication year
External Links
Snippet
The main objective with this report, the Construction Experience Compilation Report (CECR), is to compile experiences from the underground works carried out at Forsmark, primarily construction experiences from the tunnelling of the two cooling water tunnels of the …
- 238000010276 construction 0 title abstract description 111
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/26—Methods of surface mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C47/00—Machines for obtaining or the removal of materials in open-pit mines
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Brown et al. | ICE Manual of Geotechnical Engineering, Volume II: Geotechnical design, construction and verification | |
Sinha | Underground structures: design and instrumentation | |
Bieniawski et al. | Critical assessment of RMR-based tunnel design practices: A practical engineer’s approach | |
Lang | Span design for entry-type excavations | |
CN102182866A (en) | Backfilling process for large ultra-deep circulating water pipe | |
Carlsson et al. | Construction experiences from underground works at Forsmark. Compilation report | |
Asthana et al. | Recent advances in dam engineering | |
Perras | Tunnelling in horizontally laminated ground: the influence of lamination thickness on anisotropic behaviour and practical observations from the Niagara Tunnel Project | |
Winter et al. | Design and construction considerations | |
John et al. | ICE manual of geotechnical engineering | |
Zhou et al. | Rock engineering practice for development of underground caverns in Singapore | |
Sullivan | Hydromechanical coupling concepts for mine slopes | |
Carlsson et al. | Construction experiences from underground works at Oskarshamn. Compilation report | |
Ongodia | Geotechnical engineering design of a tunnel support system-a case study of Karuma (600MW) hydropower project | |
Baines et al. | DINORWIG PUMPED STORAGE SCHEME. PART 1: DESIGN. PART 2: CONSTRUCTION. | |
Brown et al. | ICE Manual of Geotechnical Engineering, Volume I: Geotechnical engineering principles, problematic soils and site investigation | |
Chen et al. | TBM Construction in Special Stratum | |
Mikkola et al. | Cave-ins in the Päijänne Tunnel and their repair | |
Songa et al. | Application of Raise Boring Crossing Technology in Domestic Oil and Gas Pipeline Project | |
Keaton | Construction geology; as-built conditions | |
Gray | 6 Subsidence over abandoned mines: US experience | |
Sütcüoğlu | A case study: A deep retaining system construction with pre-stressed anchors | |
Schmoll et al. | North American Tunneling 2002, Ozdemir (ed.)© 2002 Swets & Zeitlinger, Lisse, ISBN 90 5809 376 X Geotechnical characterization for a 34-mile long hard rock tunnel in San Diego, California | |
Bashir et al. | Inflows in uranium mines of northern Saskatchewan: risks and mitigation | |
Jasperse et al. | Excavated and backfilled cutoffs (Category 1) |