Neelamkavil, 2009 - Google Patents
Automation in the prefab and modular construction industryNeelamkavil, 2009
View PDF- Document ID
- 14991725092360416392
- Author
- Neelamkavil J
- Publication year
- Publication venue
- 26th symposium on construction robotics ISARC
External Links
Snippet
The construction industry at-large is dominated by numerous small and specialized sub- contractors who typically are not technologically advanced enough to embrace automation. The sector that represents factory built housing (the modular, prefab, panelized, precast …
- 238000010276 construction 0 title abstract description 75
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063118—Staff planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/08—Construction
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Neelamkavil | Automation in the prefab and modular construction industry | |
Pan et al. | Stakeholder perceptions of the future application of construction robots for buildings in a dialectical system framework | |
Hergunsel | Benefits of building information modeling for construction managers and BIM based scheduling | |
Miyatake et al. | Experiencing computer integrated construction | |
Khanzode et al. | Case study of the implementation of the lean project delivery system (LPDS) using virtual building technologies on a large healthcare project | |
Nasereddin et al. | Automated simulator development: A strategy for modeling modular housing production | |
Staub-French et al. | Building information modeling (BIM) and design for manufacturing and assembly (DfMA) for mass timber construction | |
Andia et al. | Post-parametric automation in design and construction | |
Jaganathan et al. | Integrated design approach for improving architectural forms in industrialized building systems | |
Ofori-Kuragu et al. | Mainstreaming pre-manufactured offsite processes in construction–are we nearly there? | |
Bock | Construction automation and robotics | |
Pan | Methodological development for exploring the potential to implement on-site robotics and automation in the context of public housing construction in Hong Kong | |
CN115689464A (en) | Assembly type building EPC general contract project management method and system based on BIM | |
Jensen et al. | Product development through lean design and modularization principles | |
Björnfot | An exploration of lean thinking for multi-storey timber housing construction: contemporary Swedish practices and future opportunities | |
Dindorf et al. | Challenges of robotic technology in sustainable construction practice | |
Nawi et al. | Enhancement of constructability concept: An experience in offsite Malaysia construction industry | |
Ong et al. | Waste Reduction in Precast Construction | |
Gao et al. | Experiences with 3D and 4D CAD on building construction projects: Benefits for project success and controllable implementation factors | |
Nagatoishi | Construction Management in Space: Explore Solution Space of Optimal Schedule and Cost Estimate | |
Bergsten | Industrialised building systems: Vertical extension of existing buildings by use of light gauge steel framing systems and 4D CAD tools | |
Kim et al. | Real-time progress management system for steel structure construction | |
Tan et al. | Building information modeling-enabled platform approach to design for manufacture and assembly | |
Ahankoob et al. | Optimizing construction scheduling through use of building information modeling in construction industry | |
Oliveira et al. | Simulation of construction processes as a link between BIM models and construction progression on-site |