DUTTA, 1990 - Google Patents
Reacting to scheduling exceptions in FMS environmentsDUTTA, 1990
- Document ID
- 14893449181542603288
- Author
- DUTTA A
- Publication year
- Publication venue
- IIE transactions
External Links
Snippet
Uncertainties in the production environment and modelling limitations inevitably result in operational deviations from schedules generated using predictive models. A production control mechanism monitors the environment for exceptions, and takes corrective actions …
- 238000000034 method 0 abstract description 30
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for programme control, e.g. control unit
- G06F9/06—Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Programme initiating; Programme switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4843—Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
- G06F9/4881—Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/34—Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation; Recording or statistical evaluation of user activity, e.g. usability assessment
- G06F11/3409—Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation; Recording or statistical evaluation of user activity, e.g. usability assessment for performance assessment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/40—Transformations of program code
- G06F8/41—Compilation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F2201/00—Indexing scheme relating to error detection, to error correction, and to monitoring
- G06F2201/86—Event-based monitoring
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/05—Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DUTTA | Reacting to scheduling exceptions in FMS environments | |
Widmer | Job shop scheduling with tooling constraints: a tabu search approach | |
DE69229365T2 (en) | Method and arrangement for cost-related heuristic command sequence planning | |
US20060129970A1 (en) | Systems and methods for production planning analysis using discrete event simulation | |
Wallace | Applying constraints for scheduling | |
Baruah et al. | Robustness results concerning EDF scheduling upon uniform multiprocessors | |
Burns et al. | Generating feasible cyclic schedules | |
Vijaykumar et al. | On proposing statecharts to specify performance models | |
Horman et al. | Process dynamics: Identifying a strategy for the deployment of buffers in building projects | |
Shaw | A pattern-directed approach to FMS scheduling | |
Copas et al. | A rules-based scheduling system for flow type assembly | |
Hamdan et al. | A scheme for nesting algorithmic skeletons | |
WO2021090476A1 (en) | Stop cause specification assistance device, stop cause specification assistance program, and method | |
Pflughoeft et al. | Intelligent decision support for flexible manufacturing: Design and implementation of a knowledge-based simulator | |
Rongfa | Adaptive software test management system based on software agents | |
CN113065055A (en) | News information capturing method and device, electronic equipment and storage medium | |
Lin et al. | A three-phase discrete event simulation with EPNSim graphs | |
CN116450305B (en) | SOAR platform assembly execution method and device based on distributed task scheduling | |
Howes | Toward a real-time Ada design methodology | |
Lee et al. | A HESS for resource planning in service and manufacturing industries | |
Freedman et al. | Repetitive sequencing: from workcell tasks to workcell cycles | |
Li et al. | Traffic characterization for integrated services | |
Gerogiannis et al. | SAT-a schedulability analysis tool for real-time applications | |
Arora et al. | A tool to assist in fine-tuning and debugging embedded real-time systems | |
Almeida et al. | The effect of heterogeneity on the performance of multiprogrammed parallel systems |