[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Carter, 2022 - Google Patents

Building a Better Maintenance Plan

Carter, 2022

Document ID
1487165384962541185
Author
Carter R
Publication year
Publication venue
Engineering and Mining Journal

External Links

Snippet

In an industry where it may take 20 years to bring a major mine into production, nobody has to sell a CEO, CFO or even CIO on the value of project plans. They're simply part of the fabric that connects a promising concept to eventual operational reality. It might be a harder sell …
Continue reading at search.proquest.com (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0637Strategic management or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0635Risk analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling

Similar Documents

Publication Publication Date Title
US20080082345A1 (en) System and method for evaluating risks associated with delaying machine maintenance
Ahamed Mohideen et al. Strategic approach to breakdown maintenance on construction plant–UAE perspective
Carter Building a Better Maintenance Plan
Mana et al. The concept of the industry 4.0 in a German multinational instrumentation and control company: a case study of a subsidiary in Brazil
Galar et al. The evolution from e (lectronic) Maintenance to i (ntelligent) Maintenance
Carter Managing mobile assets
Urmetzer et al. Engineering services: Unpacking value exchange
Carter Shovel maintenance gains from improved designs, tools, and techniques
Antal et al. Implementation of business intelligence system to analyze the data for mining mechanization-case study.
Morton Crusher Service Offerings Proliferate
Leonida Keep on Trucking
Talan et al. Risk Based Maintenance Planning for Loading Equipment in Underground Hard Rock Mine: Case Study
Ibbs Jr et al. Integrated construction preventive maintenance system
Carter Remote possibilities
Schmid SKF: Rotating Equipment Performance, a Shift in Perspective—From Transactions to Outcomes
Carter Moving Ahead in the Material World
Velmurugan et al. Asset Maintenance in Operations-Intensive Organizations
Ullah et al. Maintenance system for heavy earth moving equipment
Ratendra et al. Application of Structured Maintenance Reliability Programme in Oil and Gas Industry—A Case Study
Leonida Keeping on Top of Tires
BalaRaju et al. Evaluation of influential measures to control the monetary aspects of load haul dump machine-case study
Peltonen Development of preventive maintenance for Larox filters
Khoshouei et al. A roadmap for lean maintenance of mining machinery
Leonida Fleet Management for Modern Mines
Carter Maintaining the Pace