Market scheduling and pricing for primary and secondary frequency reserveZhang et al., 2018
- Document ID
- 14781813414990655793
- Author
- Zhang G
- Ela E
- Wang Q
- Publication year
- Publication venue
- IEEE Transactions on Power Systems
External Links
Snippet
The high penetration of renewable energy (RE) significantly impacts the power system frequency stability for the following reasons: first, the replacement of conventional thermal generator by RE such as wind and solar degrades the frequency control capability; second …
- 230000005540 biological transmission 0 abstract description 29
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
- H02J3/382—Dispersed generators the generators exploiting renewable energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/008—Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Systems supporting the management or operation of end-user stationary applications, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y04S20/20—End-user application control systems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GASES [GHG] EMISSION, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhang et al. | Market scheduling and pricing for primary and secondary frequency reserve | |
Ahmadyar et al. | A framework for assessing renewable integration limits with respect to frequency performance | |
Huang et al. | Integration of preventive and emergency responses for power grid resilience enhancement | |
Van Stiphout et al. | The impact of operating reserves on investment planning of renewable power systems | |
Du et al. | New ancillary service market for ERCOT | |
Wang et al. | Impact of high penetration of variable renewable generation on frequency dynamics in the continental Europe interconnected system | |
Tian et al. | Stacked revenue and technical benefits of a grid-connected energy storage system | |
Saint-Pierre et al. | Active distribution system management: A dual-horizon scheduling framework for DSO/TSO interface under uncertainty | |
Chen et al. | Incorporating post zonal reserve deployment transmission constraints into energy and ancillary service co-optimization | |
Vlachos et al. | Demand response in a real-time balancing market clearing with pay-as-bid pricing | |
Riesz et al. | Designing electricity markets for a high penetration of variable renewables | |
Siano et al. | Assessing wind turbines placement in a distribution market environment by using particle swarm optimization | |
Jalali et al. | Risk-based stochastic allocation of ESS to ensure voltage stability margin for distribution systems | |
Prakash et al. | Frequency response support assessment from uncertain wind generation | |
JP7113145B2 (en) | Systems and Methods Utilizing AC Overbuilt Renewable Electricity Generating Resources and Charge Storage Devices Providing Desirable Capacity Factors | |
Tosatto et al. | Sharing reserves through HVDC: Potential cost savings in the Nordic countries | |
Garcia et al. | Requirements for interdependent reserve types providing primary frequency control | |
Holttinen et al. | Steps for a complete wind integration study | |
Alirezazadeh et al. | A new flexible and resilient model for a smart grid considering joint power and reserve scheduling, vehicle-to-grid and demand response | |
Ge et al. | Mid‐term integrated generation and maintenance scheduling for wind‐hydro‐thermal systems | |
Jayaweera et al. | Steady-state security in distribution networks with large wind farms | |
O’Malley et al. | Probabilistic scheduling of UFLS to secure credible contingencies in low inertia systems | |
Al Kez et al. | Manipulation of static and dynamic data center power responses to support grid operations | |
Huang et al. | Impact of wind generation on system operations in the deregulated environment: ERCOT experience | |
Kirby et al. | Analyzing the impact of variable energy resources on power system reserves |