Galbraith et al., 1994 - Google Patents
Analysis in manufacturing systems simulation: a case studyGalbraith et al., 1994
- Document ID
- 14043614104950265389
- Author
- Galbraith L
- Standridge C
- Publication year
- Publication venue
- Simulation
External Links
Snippet
A case study of the transition of an electronics assembly manufacturing system from a traditional push production control system to a just in time (pull control system) is presented. Emphasis is on the unique simulation analysis aspects of the case study. The experimental …
- 238000004519 manufacturing process 0 title abstract description 41
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32234—Maintenance planning
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41875—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by quality surveillance of production
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F2217/00—Indexing scheme relating to computer aided design [CAD]
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Jeong et al. | A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules | |
Dengiz et al. | Computer simulation of a PCB production line: metamodeling approach | |
US4796194A (en) | Real world modeling and control process | |
KR101189995B1 (en) | Bottleneck device extracting method and bottleneck device extracting assistance device | |
US6829514B2 (en) | Balancing workloads in an electronics assembly factory | |
Tsai | Development of a soldering quality classifier system using a hybrid data mining approach | |
Savsar | Simulation analysis of a pull-push system for an electronic assembly line | |
Choi et al. | A simulation study of an automotive foundry plant manufacturing engine blocks | |
Galbraith et al. | Analysis in manufacturing systems simulation: a case study | |
Oh et al. | An economic evaluation model for product design decisions under concurrent engineering | |
Chang | A study of factors affecting due-date predictability in a simulated dynamic job shop | |
Singh et al. | Experimental investigation for performance assessment of scheduling policies in semiconductor wafer fabrication—a simulation approach | |
Lee et al. | An integrated design support method for flexible assembly systems | |
Amori et al. | Thermal performance of solar hot water systems using a flat plate collector of accelerated risers | |
Raghavan et al. | Heuristic algorithms to minimize total weighted tardiness with stochastic rework and reprocessing times | |
Anderson | A method for planning analysis and design simulation of CIM systems | |
Galbraith et al. | Manufacturing system performance sensitivity to selection of product design metrics | |
Li et al. | A generalized stochastic petri-net model for performance analysis and allocation optimization of a particular repair system | |
Tsai et al. | Measuring machine-group flexibility: a case study for surface mount assembly line with different configurations | |
Miller | The role of simulation in semiconductor logistics | |
Selladurai et al. | Development of a computer simulator for dynamic scheduling of FMS to achieve optimal performance | |
Williams et al. | Analysis of workflow protocol adaptability in TestLAN production systems | |
Gebus et al. | Production Optimization on PCB assembly lines using discrete-event simulation | |
Doulgeri et al. | Effect of workstation loading on the objective of the systems’s entry policy in FMS | |
Manfredi et al. | Simulation-Driven Analyses of Performance of PCB Assembly Operations: A Case Study |