Fair et al., 1969 - Google Patents
Paper 16: The Management of Maintenance and its Impact on Safety and Failure of ComponentsFair et al., 1969
- Document ID
- 13544127514268579250
- Author
- Fair D
- Maxwell E
- Publication year
- Publication venue
- Proceedings of the Institution of Mechanical Engineers, Conference Proceedings
External Links
Snippet
The various influences exerted by management at different levels of an organization to secure reliable and continuing operation of electricity generating plant are dealt with. Consideration is given to the requirement at the top executive level for the strategic planning …
- 238000007689 inspection 0 abstract description 15
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
- G05B23/0267—Fault communication, e.g. human machine interface [HMI]
- G05B23/0272—Presentation of monitored results, e.g. selection of status reports to be displayed; Filtering information to the user
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32234—Maintenance planning
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2019201086B2 (en) | Method and system for condition monitoring of a group of plants | |
Qingfeng et al. | Development and application of equipment maintenance and safety integrity management system | |
KR101329395B1 (en) | Power plant equipment management system and control method for thereof | |
US8639646B1 (en) | System to build, analyze and manage a computer generated risk assessment model and perform layer of protection analysis using a real world model in software of a safety instrumented system architecture | |
Hale et al. | Survey of reliability and availability information for power distribution, power generation, and HVAC components for commercial, industrial, and utility installations | |
Vaurio | Safety-related decision making at a nuclear power plant | |
Bond et al. | Improved economics of nuclear plant life management | |
Tejedor et al. | Advanced gas turbine asset and performance management | |
Fair et al. | Paper 16: The Management of Maintenance and its Impact on Safety and Failure of Components | |
Radosavljević et al. | Individual maintenance engineering in energy and mining-based of risk | |
Bore | Analysis of management methods and application to maintenance of geothermal power plants | |
Shaik et al. | Evaluating reliability of diesel generator peakers using Six Sigma methodologies | |
Chibu | Integration of Reliability, Availability, Maintainability, and Supportability (Rams) in Maintenance Decision Policies in Afam Electric Power Station In Rivers State Nigeria | |
El Werfalli | Optimising turnaround maintenance (TAM) scheduling of gas plants in Libya | |
Melvin et al. | Reliability and maintainability manual-process systems | |
Dialynas et al. | Implementation of reliability centered maintenance programs into electric power systems | |
JP4964275B2 (en) | Maintenance history management system and maintenance history management method | |
Liu et al. | Research and Application of Reliability Management Process in Nuclear Power Plants | |
Sampson | Evaluating Reliability of Diesel Generator Peakers Using Six Sigma Methodology | |
Armstrong | Human factors in incident investigation | |
Dean et al. | Selection of maintenance tasks | |
Fedor | Predictive maintenance technologies and their effect on unscheduled maintenance downtime | |
Hahn | Applying Machinery Condition Analysis (MCA) to Rotating Machinery Repairs Can Result in Decreased Cost and Increased Readiness | |
Balkey | Human factors engineering in risk-based inspections | |
Peterson | Creating an asset healthcare program |