Nauduri et al., 2022 - Google Patents
A Review of Conventionally Undrillable Wells with Ultra-Narrow Pressure Windows Successfully Drilled Utilizing MPD Over the Last Five Years in USA and CanadaNauduri et al., 2022
- Document ID
- 13477893985574742364
- Author
- Nauduri S
- Parker M
- Shimi A
- Guefack G
- Publication year
- Publication venue
- SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference and Exhibition?
External Links
Snippet
Abstract Managed Pressure Drilling (MPD) has been used on multiple projects by several operators in different regions of North America to drill through formations that had ultra- narrow (or conventionally undrillable) pressure windows. As illustrated by the case studies …
- 238000005553 drilling 0 abstract description 118
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/06—Deflecting the direction of boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B2021/006—Underbalanced techniques, i.e. where borehole fluid pressure is below formation pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/10—Valve arrangements in drilling fluid circulation systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/12—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using drilling pipes with plural fluid passages, e.g. closed circulation systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B29/00—Cutting or destroying pipes, packers, plugs, or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Russell et al. | Achieving zonal isolation using automated managed pressure cementing | |
Teoh et al. | Managed pressure cementing MPC within a narrow pressure window, deepwater Gulf of Mexico application | |
Soto et al. | Successful implementation of automated managed pressure drilling and managed pressure cementing techniques in the troublesome intermediate and reservoir sections of a remote well in the peruvian jungle eliminates wellbore instability, severe fluid losses, and differential sticking | |
Nauduri et al. | A Review of Conventionally Undrillable Wells with Ultra-Narrow Pressure Windows Successfully Drilled Utilizing MPD Over the Last Five Years in USA and Canada | |
Kazakbayeva et al. | Successful implementation of managed pressure drilling and managed pressure cementing techniques in fractured carbonate formation prone to total lost circulation in Far North Region | |
Moghazy et al. | The Challenges of Deploying an MPD System on a MODU to Drill Narrow Margin Shallow Horizontal Wells in DW GoM | |
Grayson | Increased operational safety and efficiency with managed pressure drilling | |
Elmore et al. | MPD techniques optimize HPHT well control | |
Johnson et al. | Continuous Circulation Technology to Reduce Drilling Days in Offshore West Africa: Case Study | |
Kulikov et al. | " Secure Drilling" Services for Safe and Effective Drilling | |
Orta et al. | First Oman Implementation of Pressurized Mud-Cap Drilling Improves Drilling Efficiency and Sustainability | |
Muhammad et al. | Fully Automatic Managed Pressure Drilling Technology, The Answer To Weeks Of Well complications including high temp, narrow mud window & CO2 influx in challenging exploration wells | |
Montilva et al. | Next-generation managed pressure drilling system enables HP/HT horizontal wells in the Haynesville shale | |
Zein et al. | Case study-constant bottom hole pressure of managed-pressure drilling utilization to maintain wellbore instability in east java drilling operation, Indonesia | |
Verma et al. | Case Study: First Ever Implementation of Managed Pressure Drilling to Drill Exploratory and Near Wildcat Well at Ongc Tripura Asset | |
Lovorn et al. | Optimizing The Drilling Process When Using MPD Techniques In Deep Water Applications | |
Ruiz et al. | First Application of Pressure Mud Cap Drilling Technique with Manage Pressure Drilling in Unconventional Gas Exploratory Onshore Field in UAE Allowed Operator to Reach Target Depth and Complete the Wells | |
Lee et al. | Enabling Shallow Reservoir Development in Malaysian Deepwater Field Via Statically Underbalanced Mud with MPD Applications | |
Baig et al. | Drilling the Un Drillable: A Case Study of the Bela Well in Makran Accretionary Prism | |
Al Hadidy et al. | Full-Automated Managed Pressure Drilling System Facilitates Unlocking Unconventional Gas Reservoir Potential in United Arab Emirates | |
Khalid et al. | Reaching Target Depth with Zero NPT in an HPHT Tight Gas Well: A Case for Automated Managed Pressure Drilling | |
Pinzon et al. | Automated MPD System for Drilling Optimization and Formation Characterization in an Exploratory Well | |
Nabiyev et al. | Innovative MPD Well Kill/Balance Technique | |
Martinez et al. | MPD Applicaton on ERD Well Offshore Venezuela–Managing Bottom Hole Pressure within Narrow Window in a Faulted Limestone Formation with an Static Underbalanced Drilling Fluid | |
Nas et al. | Advantages of managed pressure drilling and the recent deployment of the technology in Vietnam |