[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Zhao et al., 2020 - Google Patents

A multilayer genetic algorithm for automated guided vehicles and dual automated yard cranes coordinated scheduling

Zhao et al., 2020

View PDF @Full View
Document ID
13303405452128564447
Author
Zhao Q
Ji S
Zhao W
De X
Publication year
Publication venue
Mathematical Problems in Engineering

External Links

Snippet

At present, a lot of studies on automatic terminal scheduling are aimed at the shortest operating time. An effective way to reduce the operating time is to increase the amount of operating equipment. However, people often ignore the additional costs and energy …
Continue reading at onlinelibrary.wiley.com (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting

Similar Documents

Publication Publication Date Title
Zhao et al. Research on cooperative scheduling of automated quayside cranes and automatic guided vehicles in automated container terminal
Ma et al. Simulation model and performance evaluation of battery-powered AGV systems in automated container terminals
Zhang et al. Cooperative scheduling of AGV and ASC in automation container terminal relay operation mode
Zhao et al. A multilayer genetic algorithm for automated guided vehicles and dual automated yard cranes coordinated scheduling
Walha et al. A rail-road PI-hub allocation problem: Active and reactive approaches
Zhao et al. Digital-twin driven energy-efficient multi-crane scheduling and crane number selection in workshops
Homayouni et al. Multi objective optimization of coordinated scheduling of cranes and vehicles at container terminals
Geng et al. Research on scheduling strategy for automated storage and retrieval system
Zhong et al. Adaptive autotuning mathematical approaches for integrated optimization of automated container terminal
Liu et al. Optimization approach for yard crane scheduling problem with uncertain parameters in container terminals
Li et al. Multiobjective Contactless Delivery on Medical Supplies under Open‐Loop Distribution
Tan et al. Mathematical modeling of yard template regeneration for multiple container terminals
Lu et al. An automated guided vehicle conflict-free scheduling approach considering assignment rules in a robotic mobile fulfillment system
Liang et al. Joint dispatch of shipment equipment considering underground container logistics
Liu et al. Integrated scheduling of yard and rail container handling equipment and internal trucks in a multimodal port
Tan et al. Yard space allocation of container port based on dual cycle strategy
Lu The Three‐Stage Integrated Optimization of Automated Container Terminal Scheduling Based on Improved Genetic Algorithm
Luo et al. Optimization of gantry crane scheduling in container sea‐rail intermodal transport yard
Lu The optimization of automated container terminal scheduling based on proportional fair priority
Yang et al. Battery-powered automated guided vehicles scheduling problem in automated container terminals for minimizing energy consumption
Hu et al. Positioning a handshake bay for twin stacking cranes in an automated container terminal yard block
Hu et al. Performance analysis on transfer platforms in frame bridge based automated container terminals
Zheng et al. An improved storage-space selection model and algorithm for outbound shipping containers: Considering the synchronous operation of multiple gantry cranes in port terminals worldwide
Pan et al. Distributed Energy-Efficient Flexible Manufacturing With Assembly and Transportation: A Knowledge-Based Bi-Hierarchical Optimization Approach
Tao et al. A metaheuristic algorithm to transporter scheduling for assembly blocks in a shipyard considering precedence and cooperating constraints