Minglin et al., 2022 - Google Patents
Risk priority evaluation for power transformer parts based on intuitionistic fuzzy preference selection index methodMinglin et al., 2022
View PDF- Document ID
- 1312926286482458691
- Author
- Minglin J
- Ren H
- Publication year
- Publication venue
- Mathematical Problems in Engineering
External Links
Snippet
The risk assessment of power transformer equipment can not only improve the safety and management level of transformer operation, but also reduce the operation and maintenance costs of the equipment on the basis of ensuring the overall reliable operation of the power …
- 238000011156 evaluation 0 title abstract description 46
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computer systems utilising knowledge based models
- G06N5/02—Knowledge representation
- G06N5/022—Knowledge engineering, knowledge acquisition
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/3061—Information retrieval; Database structures therefor; File system structures therefor of unstructured textual data
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computer systems utilising knowledge based models
- G06N5/04—Inference methods or devices
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N99/00—Subject matter not provided for in other groups of this subclass
- G06N99/005—Learning machines, i.e. computer in which a programme is changed according to experience gained by the machine itself during a complete run
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N7/00—Computer systems based on specific mathematical models
- G06N7/005—Probabilistic networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce, e.g. shopping or e-commerce
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sun et al. | Research on multi‐attribute decision‐making in condition evaluation for power transformer using fuzzy AHP and modified weighted averaging combination | |
Du et al. | New failure mode and effects analysis: an evidential downscaling method | |
Khalili et al. | Optimal instantaneous prediction of voltage instability due to transient faults in power networks taking into account the dynamic effect of generators | |
Chang | A novel general risk assessment method using the soft TOPSIS approach | |
Serrano-Gomez et al. | Monte Carlo approach to fuzzy AHP risk analysis in renewable energy construction projects | |
Liao et al. | Cloud model‐based failure mode and effects analysis for prioritization of failures of power transformer in risk assessment | |
Li et al. | An optimized GRNN‐enabled approach for power transformer fault diagnosis | |
Minglin et al. | Risk priority evaluation for power transformer parts based on intuitionistic fuzzy preference selection index method | |
Bhalla et al. | Transformer incipient fault diagnosis based on DGA using fuzzy logic | |
Ye | Fault diagnoses of hydraulic turbine using the dimension root similarity measure of single-valued neutrosophic sets | |
Milosavljevic et al. | Integrated transformer health estimation methodology based on Markov chains and evidential reasoning | |
Gao et al. | Research into power transformer health assessment technology based on uncertainty of information and deep architecture design | |
Malik et al. | Selection of most relevant input parameters using principle component analysis for extreme learning machine based power transformer fault diagnosis model | |
Ma et al. | Holistic performance evaluation framework: power distribution network health index | |
Mei et al. | A data‐driven approach to state assessment of the converter valve based on oversampling and Shapley additive explanations | |
Liao et al. | A cloud and evidential reasoning integrated model for insulation condition assessment of high voltage transformers | |
Zhang et al. | Transformer maintenance decision based on condition monitoring and fuzzy probability hybrid reliability assessment | |
Glukhikh et al. | Neural network models for situation similarity assessment in hybrid-CBR | |
Song et al. | Improved Cluster Intelligent and Complex Optimization Algorithm for Power Equipment CAD‐Assisted Intelligent Operation and Maintenance | |
Pan et al. | Advanced FMECA Method Based on Intuitionistic 2‐Tuple Linguistic Variables and the Triangular Fuzzy Analytic Hierarchy Process | |
Wan Azman et al. | An Extended Interval Type‐2 Fuzzy VIKOR Technique with Equitable Linguistic Scales and Z‐Numbers for Solving Water Security Problems in Malaysia | |
Wan et al. | Evaluation model of power operation and maintenance based on text emotion analysis | |
Lin et al. | The strategy research on electrical equipment condition-based maintenance based on cloud model and grey DS evidence theory | |
Dong et al. | Modified GRA method for probabilistic hesitant fuzzy MAGDM and application to network health performance evaluation of radial distribution system | |
Ye | MCGDM model using uncertain linguistic consistency sets of single and interval linguistic term multivalued sets |