[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Schools - Google Patents

THE FOLLOWING CHANGES, ADDITIONS, DELETIONS AND CLARIFICATIONS ARE HEREBY MADE PART OF THE BIDDING REQUIREMENTS AND CONTRACT …

Schools

View PDF
Document ID
12334352414059346938
Author
Schools A

External Links

Snippet

Answer: These spec sections have been issued by Automated Logic Controls and are included in this addendum. These sections are provided so the GC can coordinate with the controls contractor to provide a complete system. The controls contractor is under a separate …
Continue reading at citeseerx.ist.psu.edu (PDF) (other versions)

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING ENGINES OR PUMPS
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety systems or apparatus
    • F24F11/0009Electrical control or safety systems or apparatus
    • F24F11/0086Control systems or circuits characterised by other control features, e.g. display or monitoring devices
    • F24F2011/0091Display or monitoring devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING ENGINES OR PUMPS
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety systems or apparatus
    • F24F11/0009Electrical control or safety systems or apparatus
    • F24F11/001Control systems or circuits characterised by their inputs, e.g. using sensors
    • F24F2011/0041Pressure
    • F24F2011/0042Air pressure

Similar Documents

Publication Publication Date Title
Schools THE FOLLOWING CHANGES, ADDITIONS, DELETIONS AND CLARIFICATIONS ARE HEREBY MADE PART OF THE BIDDING REQUIREMENTS AND CONTRACT DOCUMENTS FOR THE ABOVE REFERENCED PROJECT AND SHALL BE TAKEN INTO ACCOUNT IN THE PREPARATION OF ALL BIDS AND THE EXECUTION OF ALL WORK. BIDDERS SHALL ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE APPROPRIATE SPACE ON THE BID FORM.
Areas et al. PART 3 EXECUTION 3.1 INSTALLATION
Pipe et al. SECTION 22 10 23 NATURAL GAS PIPING
Vale Geothermal Mill Redevelopment Project in Massachusetts
CAMDEN et al. Division 23–Mechanical
Manufacturers PIPING MATERIALS & METHODS 221113-5
LINCOLN COUNTY CONTRACT DOCUMENTS
Piping PART 1 GENERAL 1.1 SECTION INCLUDE S
SCHOOLS 3.03 INSTALLATION OF VARIABLE FREQUENCY DRIVES
HALL 3.7 COMMUNICATION WIRING
Shutoff SECTION 23 09 00.01 HVAC CONTROLS SEQUENCE OF OPERATION, GENERAL CONTROL TYPES
Seal 1.5 DELIVERY, STORAGE, AND HANDLING
PART et al. 3.3 PIPING INSTALLATION
Kovar COUNTY PURCHASING AGENT
RFP PROJECT MANUAL
Salas O’Brien WESTBROOK HIGH SCHOOL AIR HANDLING UNIT REPLACEMENT
GENERAL et al. HEATING, VENTILATION AND AIR CONDITIONING
Sensor et al. CONTROLS–ALTERNATE BID# 10
Manufacturers 2.05 NATURAL GAS BOILER
Bid DUCTWORK INSULATION
NO WASHINGTON TOWNSHIP MUA OFFICE COMPLEX GLOUCESTER COUNTY, NEW JERSEY
FULLER AND D'ANGELO SECTION 12 3600 SOLID SURFACING SILLS AND COUNTERTOPS PART 1 GENERAL 1.1 RELATED DOCUMENTS
CHARLESTON Ladson Elementary School Phase 2 School Building No. 0602
Albrecht HVAC REPLACEMENT FOR THE BOONE COUNTY SHERIFF’S OFFICE
CHARLESTON et al. NORTH CHARLESTON CENTER FOR ADVANCED STUDIES