Schools - Google Patents
THE FOLLOWING CHANGES, ADDITIONS, DELETIONS AND CLARIFICATIONS ARE HEREBY MADE PART OF THE BIDDING REQUIREMENTS AND CONTRACT …Schools
View PDF- Document ID
- 12334352414059346938
- Author
- Schools A
External Links
Snippet
Answer: These spec sections have been issued by Automated Logic Controls and are included in this addendum. These sections are provided so the GC can coordinate with the controls contractor to provide a complete system. The controls contractor is under a separate …
- 238000002360 preparation method 0 title description 4
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING ENGINES OR PUMPS
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety systems or apparatus
- F24F11/0009—Electrical control or safety systems or apparatus
- F24F11/0086—Control systems or circuits characterised by other control features, e.g. display or monitoring devices
- F24F2011/0091—Display or monitoring devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING ENGINES OR PUMPS
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety systems or apparatus
- F24F11/0009—Electrical control or safety systems or apparatus
- F24F11/001—Control systems or circuits characterised by their inputs, e.g. using sensors
- F24F2011/0041—Pressure
- F24F2011/0042—Air pressure
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Schools | THE FOLLOWING CHANGES, ADDITIONS, DELETIONS AND CLARIFICATIONS ARE HEREBY MADE PART OF THE BIDDING REQUIREMENTS AND CONTRACT DOCUMENTS FOR THE ABOVE REFERENCED PROJECT AND SHALL BE TAKEN INTO ACCOUNT IN THE PREPARATION OF ALL BIDS AND THE EXECUTION OF ALL WORK. BIDDERS SHALL ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE APPROPRIATE SPACE ON THE BID FORM. | |
Areas et al. | PART 3 EXECUTION 3.1 INSTALLATION | |
Pipe et al. | SECTION 22 10 23 NATURAL GAS PIPING | |
Vale | Geothermal Mill Redevelopment Project in Massachusetts | |
CAMDEN et al. | Division 23–Mechanical | |
Manufacturers | PIPING MATERIALS & METHODS 221113-5 | |
LINCOLN COUNTY | CONTRACT DOCUMENTS | |
Piping | PART 1 GENERAL 1.1 SECTION INCLUDE S | |
SCHOOLS | 3.03 INSTALLATION OF VARIABLE FREQUENCY DRIVES | |
HALL | 3.7 COMMUNICATION WIRING | |
Shutoff | SECTION 23 09 00.01 HVAC CONTROLS SEQUENCE OF OPERATION, GENERAL CONTROL TYPES | |
Seal | 1.5 DELIVERY, STORAGE, AND HANDLING | |
PART et al. | 3.3 PIPING INSTALLATION | |
Kovar | COUNTY PURCHASING AGENT | |
RFP | PROJECT MANUAL | |
Salas O’Brien | WESTBROOK HIGH SCHOOL AIR HANDLING UNIT REPLACEMENT | |
GENERAL et al. | HEATING, VENTILATION AND AIR CONDITIONING | |
Sensor et al. | CONTROLS–ALTERNATE BID# 10 | |
Manufacturers | 2.05 NATURAL GAS BOILER | |
Bid | DUCTWORK INSULATION | |
NO | WASHINGTON TOWNSHIP MUA OFFICE COMPLEX GLOUCESTER COUNTY, NEW JERSEY | |
FULLER AND D'ANGELO | SECTION 12 3600 SOLID SURFACING SILLS AND COUNTERTOPS PART 1 GENERAL 1.1 RELATED DOCUMENTS | |
CHARLESTON | Ladson Elementary School Phase 2 School Building No. 0602 | |
Albrecht | HVAC REPLACEMENT FOR THE BOONE COUNTY SHERIFF’S OFFICE | |
CHARLESTON et al. | NORTH CHARLESTON CENTER FOR ADVANCED STUDIES |