[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Peng et al., 2011 - Google Patents

Managing the embodied carbon of precast concrete columns

Peng et al., 2011

Document ID
11789918503338723896
Author
Peng W
Sui Pheng L
Publication year
Publication venue
Journal of Materials in Civil Engineering

External Links

Snippet

With the rising recognition of global climate change, the term CO 2 emissions is now part of everyday language. The construction industry plays a significant role in economic growth both directly through its activities and indirectly through the provision of buildings and …
Continue reading at ascelibrary.org (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
    • G06Q50/08Construction

Similar Documents

Publication Publication Date Title
Peng et al. Managing the embodied carbon of precast concrete columns
Lu et al. Revisiting the effects of prefabrication on construction waste minimization: A quantitative study using bigger data
Anderson et al. Embodied carbon of concrete in buildings, Part 1: Analysis of published EPD
Hao et al. Quantifying construction waste reduction through the application of prefabrication: a case study in Anhui, China
Wang et al. Critical factors in effective construction waste minimization at the design stage: a Shenzhen case study, China
Solís-Guzmán et al. Carbon footprint estimation tool for residential buildings for non-specialized users: OERCO2 project
Zhang et al. Application of low waste technologies for design and construction: A case study in Hong Kong
Wang et al. An empirical study on waste generation rates at different stages of construction projects in China
Lu et al. Integrating hoisting efficiency into construction site layout plan model for prefabricated construction
Ahmed et al. Selection of Sustainable Supplementary Concrete Materials Using OSM‐AHP‐TOPSIS Approach
Wang et al. Inclusion of environmental impacts in life-cycle cost analysis of bridge structures
Kumari et al. Embodied carbon reduction strategies for high-rise buildings in Sri Lanka
Hasan et al. Barriers to improving construction and demolition waste management in Bangladesh
Condeixa et al. An inquiry into the life cycle of systems of inner walls: Comparison of masonry and drywall
Silvestre et al. Life-cycle impact ‘cradle to cradle’of building assemblies
Kim et al. Analysis of lifecycle CO2 reduction performance for long‐life apartment house
Muhaimin et al. Identification and analysis of factors affecting the future of bridge design, construction, and operation
Almulhim et al. A resilience and environmentally sustainable assessment framework (RESAF) for domestic building materials in Saudi Arabia
Yi et al. Automated generation of horizontal precast slab stacking plans
Walsh et al. Rapid identification and taxonomical classification of structural seismic attributes in a regionwide commercial building stock
Park et al. Floor-level construction material layout planning model considering actual travel path
Teplý Interrelation among service life, reliability index, and costs of concrete structures subjected to aggressive exposure
Ferreira et al. Embodied vs. Operational Energy and Carbon in Retail Building Shells: A Case Study in Portugal
Asadollahfardi et al. Life‐cycle assessment of construction in a developing country
Henry et al. Perspectives on sustainable practice and materials in the Japanese concrete industry