An analysis of maintenance failures at a nuclear power plantPyy, 2001
- Document ID
- 11222999181220596866
- Author
- Pyy P
- Publication year
- Publication venue
- Reliability Engineering & System Safety
External Links
Snippet
In this paper, a study of faults caused by maintenance activities is presented. The objective of the study was to draw conclusions on the unplanned effects of maintenance on nuclear power plant (NPP) safety and system availability. More than 4400 maintenance history …
- 238000004458 analytical method 0 title description 21
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/22—Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
- G06F11/26—Functional testing
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/07—Error detection; Error correction; Monitoring responding to the occurence of a fault, e.g. fault tolerance
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C17/00—Monitoring; Testing ; Maintaining
- G21C17/02—Devices or arrangements for monitoring coolant or moderator
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Pyy | An analysis of maintenance failures at a nuclear power plant | |
Kančev et al. | Evaluation of risk and cost using an age-dependent unavailability modelling of test and maintenance for standby components | |
Holmberg et al. | Application of human reliability analysis in the deterministic safety analysis for nuclear power plants | |
Vaurio | Safety-related decision making at a nuclear power plant | |
Gertman et al. | Review of findings for human performance contribution to risk in operating events | |
Kröger | 2 Risk analyses and protection strategies for the operation of nuclear power plants | |
Gustafsson | Reliability analysis of safety-related digital instrumentation and control in a nuclear power plant | |
Ferretto et al. | Risk monitor implementation for the LVR-15 research reactor | |
Canadian Nuclear Safety Commission | REGDOC-2.6. 1, Reliability Programs for Nuclear Power Plants | |
Végh et al. | Building up an on-line plant information system for the emergency response center of the hungarian nuclear safety directorate | |
Thatcher | Evaluation of systems interactions in nuclear power plants: Technical findings related to Unresolved Safety Issue A-17 | |
SAFETY | NRC INSPECTION MANUAL PRAB | |
Gomez Cobo | Importance measures | |
Caruso et al. | Prioritizing inspections | |
Verma et al. | Applications of PSA | |
Madison | Initial experience with the NRC significance determination process | |
Canadian Nuclear Safety Commission | RD/GD-98: Reliability Programs for Nuclear Power Plants | |
Fischetti | Band-aids and better: Hardware, instrumentation, and operations are improving on a piecemeal basis and more systematic studies are under way | |
Appignani | Daily power fluctuations as a measure of maintenance effectiveness in power plant safety | |
Park et al. | ESTIMATING HEPS FROM THE OPERATIONAL EXPERIENCE OF DOMESTIC NUCLEAR POWER PLANTS–A FRAMEWORK AND CASE STUDIES | |
Berg et al. | Amendments of the existing guidance on PSA application to nuclear power plants in Germany | |
Board | AERB SAFETY GUIDE NO. AERB/NPP&RR/SG/G-10 | |
Hecht et al. | Error Classification and Analysis for High Integrity Software | |
Board | Renewal of Authorisation for Operation of Nuclear Power Plants | |
Florescu et al. | Institute for Nuclear Research, Pitesti, Romania |