Monitoring road base course construction progress by photogrammetry-based 3D reconstructionLo et al., 2023
- Document ID
- 11249396206145981408
- Author
- Lo Y
- Zhang C
- Ye Z
- Cui C
- Publication year
- Publication venue
- International Journal of Construction Management
External Links
Snippet
Infrastructure industry is a significant contributor to a country's economy, but it is beset by cost overruns and delays. Therefore, project monitoring is essential to determine project performance by comparing the site progress to the schedule baseline. However, manual …
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/05—Geographic models
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/01—Social networking
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T7/00—Image analysis
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C21/00—Navigation; Navigational instruments not provided for in preceding groups
- G01C21/20—Instruments for performing navigational calculations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T2207/00—Indexing scheme for image analysis or image enhancement
- G06T2207/10—Image acquisition modality
- G06T2207/10032—Satellite or aerial image; Remote sensing
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T2207/00—Indexing scheme for image analysis or image enhancement
- G06T2207/30—Subject of image; Context of image processing
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T11/00—2D [Two Dimensional] image generation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Puri et al. | Bridge construction progress monitoring using lidar and 4D design models | |
Teizer | Status quo and open challenges in vision-based sensing and tracking of temporary resources on infrastructure construction sites | |
Randall | Construction engineering requirements for integrating laser scanning technology and building information modeling | |
Matasci et al. | Assessing rockfall susceptibility in steep and overhanging slopes using three-dimensional analysis of failure mechanisms | |
Lo et al. | Monitoring road base course construction progress by photogrammetry-based 3D reconstruction | |
Golparvar-Fard et al. | D4AR–a 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication | |
Zhang et al. | Automated progress control using laser scanning technology | |
Golparvar-Fard et al. | Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs | |
Turkan et al. | Automated progress tracking using 4D schedule and 3D sensing technologies | |
Williams et al. | Synthesis of transportation applications of mobile LiDAR | |
Behnam et al. | Automated progress monitoring system for linear infrastructure projects using satellite remote sensing | |
Bhatla et al. | Evaluation of accuracy of as-built 3D modeling from photos taken by handheld digital cameras | |
Zhu et al. | Comparison of optical sensor-based spatial data collection techniques for civil infrastructure modeling | |
Yamane et al. | Detecting and localising damage based on image recognition and structure from motion, and reflecting it in a 3D bridge model | |
Vick et al. | A review of linear transportation construction progress monitoring techniques | |
Gara et al. | The development of real-time integrated dashboard: An overview for road construction work progress Monitoring | |
Chang et al. | Considerations for effective LiDAR deployment by transportation agencies | |
Le et al. | Understanding dynamic data interaction between civil integrated management technologies: a review of use cases and enabling techniques | |
Moragane et al. | Application of computer vision for construction progress monitoring: a qualitative investigation | |
Jiang et al. | Automatic concrete sidewalk deficiency detection and mapping with deep learning | |
Ellmann et al. | Advancements in underground mine surveys by using SLAM-enabled handheld laser scanners | |
Guo et al. | Implementation of CIM-related technologies within transportation projects | |
Mihić et al. | An Analysis of Potential Uses, Limitations and Barriers to Implementation of 3D Scan Data for Construction Management-Related Use—Are the Industry and the Technical Solutions Mature Enough for Adoption? | |
Brooks et al. | Integration of Unmanned Aerial Systems Data Collection Into Day-to-Day Usage for Transportation Infrastructure–A Phase III Project | |
Yang et al. | Accuracy assessment of light detection and ranging system measurements for jointed concrete pavement surface geometry |