Moghadam et al., 2021 - Google Patents
Estimation of initial cement stress in wellsMoghadam et al., 2021
View PDF- Document ID
- 1119231158864355533
- Author
- Moghadam A
- Orlic B
- Publication year
- Publication venue
- ARMA US Rock Mechanics/Geomechanics Symposium
External Links
Snippet
Correct estimation of the initial stress in cement is critical to assess the seal integrity of cement, during and beyond the operational life of the well. In this paper, we outline three important conditions that control the initial stress in the cement sheath:(i) presence of …
- 239000004568 cement 0 title abstract description 205
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes
- E21B33/143—Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes for underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
- E21B47/065—Measuring temperature
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B2043/0115—Drilling for or production of natural gas hydrate reservoirs; Drilling through or monitoring of formations containing gas hydrates
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Al Ramadan et al. | Experimental investigation of well integrity: Annular gas migration in cement column | |
Bois et al. | Use of a mechanistic model to forecast cement-sheath integrity | |
Zhao et al. | Analysis of the influence of cement sheath failure on sustained casing pressure in shale gas wells | |
CA2475523C (en) | Method for selecting a cementing composition for cementing wells | |
McDaniel et al. | Cement sheath durability: increasing cement sheath integrity to reduce gas migration in the marcellus shale play | |
Le Roy-Delage et al. | New cement systems for durable zonal isolation | |
Meng et al. | Predicting cement-sheath integrity with consideration of initial state of stress and thermoporoelastic effects | |
Zhang et al. | Numerical simulation of micro-annuli generation by thermal cycling | |
Drecq et al. | A single technique solves gas migration problems across a wide range of conditions | |
Orlic et al. | Numerical investigations of cement interface debonding for assessing well integrity risks | |
Ahmed et al. | Effects of wait on cement, setting depth, pipe material, and pressure on performance of liner cement | |
Zhang et al. | Numerical investigation of the influence of cement failure to micro-annuli generation | |
Saidin et al. | A new approach for optimizing cement design to eliminate microannulus in steam injection wells | |
Alberdi-Pagola et al. | Review of integrity loss detection and quantification due to cracking in cemented wells | |
Moghadam et al. | Estimation of initial cement stress in wells | |
Altun et al. | Application of a new model to analyze leak-off tests | |
Moghadam et al. | Modelling stress evolution in cement plugs during hydration | |
Moghadam et al. | Cement Integrity Assessment Using a Hydration-Coupled Thermo-Mechanical Model | |
Alkhamis et al. | A simple classification of wellbore integrity problems related to fluids migration | |
McDaniel* et al. | Zonal isolation assurance: Relating cement mechanical properties to mechanical durability | |
Zhang et al. | Wellbore Integrity: An Integrated Experimental and Numerical Study to Investigate Pore Pressure Variation during Cement Hardening under Downhole Conditions | |
Welch et al. | Effective cement stress in well completions: An important unknown | |
Wang et al. | Analysis of thermally induced stresses for effective remediation of lost circulation through drilling induced fractures | |
Zhang | Integrated approach to investigate the wellbore integrity under downhole conditions | |
Zeng et al. | Evaluation method for cement sheath sealing failure under sustained casing pressure |