Dahlin et al., 1998 - Google Patents
Probabilistic well design in Oman high pressure exploration wellsDahlin et al., 1998
- Document ID
- 1116783478441938459
- Author
- Dahlin A
- Snaas J
- Norton S
- Publication year
- Publication venue
- SPE Applied Technology Workshop on Risk Based Design of Well Casing and Tubing
External Links
Snippet
Historically, deep HPHT exploration wells in South Oman have been designed in a deterministic manner. In the design phase certain assumptions are made somewhat risk- averse, resulting in well designs catering for" worst-case" conditions. With hindsight this …
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Cox et al. | Unconventional resource play evaluation: a look at the Bakken Shale Play of North Dakota | |
Li et al. | Optimizing well spacing and well performance in the piceance basin niobrara formation | |
Liao et al. | Evaluating operation strategies via integrated asset modeling | |
Cunha et al. | Use of quantitative risk analysis for uncertainty quantification on drilling operations-review and lessons learned | |
Ouyang et al. | Case Studies for Improving Completion Design Through Comprehensive Well-Performance Modeling | |
Stotts et al. | Evaluating and Developing Tight Gas Reserves—Best Practices | |
Dahlin et al. | Probabilistic well design in Oman high pressure exploration wells | |
Hassan et al. | Application of Inflow Control Device to Control Water Production in Carbonate Reservoir with Active Bottom Water Drive in a West Kuwait Field-Case Study from Kuwait. | |
Saputelli et al. | Waterflood recovery optimization using intelligent wells and decision analysis | |
Agarwal et al. | A streamline-based method for assisted history matching applied to an Arabian Gulf field | |
Sathyamoorthy et al. | Key elements of successful well and reservoir management in the Bonga field, deepwater Nigeria | |
Guest et al. | Korolev waterflood pilot completion design for water supply and injection wells | |
Al Marzouqi et al. | The Added Value of Piloting Maximum Reservoir Contact Wells Prior to Large Scale Application to a Giant Offshore Carbonate Field | |
Lafond et al. | FAST optimization of line-drive water injection | |
Al Kalbani et al. | Bypassing Skepticism to Add Reserve: Cases of Successful Hydraulic Fracturing in Karim Formation | |
Shbair et al. | Modelling Approach of Optimum and Effective Well Length Evaluation for MRC Development Strategy. | |
Archibong et al. | Optimization Study on Inflow Control Devices for Horizontal Wells in Thin Oil Column Reservoirs: A Case Study of a Well in Niger Delta | |
Usman et al. | Application of the Combined Analytical Methods & Time Lapse Seismic 4D as a Veritable Tool for Water Shut Off WSO Operations–Deepwater Akpo Field | |
Hashemi et al. | ICD CompletionsOptimization for an Offshore Abu Dhabi Well Using Dynamic Modeling | |
Eliebid et al. | New methodology to quantify the productivity of hydraulically fractured multilateral wells in tight oil reservoirs with Gas-Drive | |
Burget et al. | Optimizing Completion Design and Well Spacing in the Powder River Basin Niobrara Oil Play | |
Pogoson et al. | Flow Analysis: A Critical Step in Completion Design and Optimization. A Case Study of Multizone Completion Designs | |
Narayanan et al. | Angostura Phase 3-Rejuvenating Complex Turbidite Fields in Offshore Trinidad Through a Successful Subsea Tieback Project | |
Kassim et al. | Building Calibrated Hydraulic Fracture Models From Low Quality Micro-seismic Data And Utilizing It For Optimization: Montney Example | |
Pakdeesirote et al. | Pilot In-Situ Inflow Control Device ICD Waterflood Injector Transformation-A Case Study from Platong |