Boye, 2015 - Google Patents
Causative Factors of Air Traffic Delay in Muritala Muhammed International Airport Lagos, NigeriaBoye, 2015
View PDF- Document ID
- 10957658970144097037
- Author
- Boye A
- Publication year
- Publication venue
- British Journal of Economics, Management and Trade
External Links
Snippet
The study examined the factors which contribute to the occurrence of flight delay in Muritala Muhammed International Airport, Lagos Nigeria. Three airlines were purposely selected from thirty two (32) airlines operators. Data was collected from 50 sampled respondents …
- 230000010006 flight 0 abstract description 64
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
-
- G—PHYSICS
- G08—SIGNALLING
- G08G—TRAFFIC CONTROL SYSTEMS
- G08G5/00—Traffic control systems for aircraft, e.g. air-traffic control [ATC]
- G08G5/003—Flight plan management
- G08G5/0039—Modification of a flight plan
-
- G—PHYSICS
- G08—SIGNALLING
- G08G—TRAFFIC CONTROL SYSTEMS
- G08G5/00—Traffic control systems for aircraft, e.g. air-traffic control [ATC]
- G08G5/003—Flight plan management
- G08G5/0034—Assembly of a flight plan
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01W—METEOROLOGY
- G01W1/00—Meteorology
- G01W1/08—Adaptations of balloons, missiles, or aircraft for meteorological purposes; Radiosondes
-
- G—PHYSICS
- G08—SIGNALLING
- G08G—TRAFFIC CONTROL SYSTEMS
- G08G5/00—Traffic control systems for aircraft, e.g. air-traffic control [ATC]
- G08G5/0017—Arrangements for implementing traffic-related aircraft activities, e.g. arrangements for generating, displaying, acquiring or managing traffic information
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/109—Time management, e.g. calendars, reminders, meetings, time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/02—Reservations, e.g. for tickets, services or events
- G06Q10/025—Coordination of plural reservations, e.g. plural trip segments, transportation combined with accommodation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/105—Human resources
-
- G—PHYSICS
- G08—SIGNALLING
- G08G—TRAFFIC CONTROL SYSTEMS
- G08G5/00—Traffic control systems for aircraft, e.g. air-traffic control [ATC]
- G08G5/0043—Traffic management of multiple aircrafts from the ground
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01W—METEOROLOGY
- G01W1/00—Meteorology
- G01W1/10—Devices for predicting weather conditions
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zou et al. | Optimal 4-D aircraft trajectories in a contrail-sensitive environment | |
de Oliveira et al. | Analysis of airport weather impact on on-time performance of arrival flights for the Brazilian domestic air transportation system | |
Pejovic et al. | A tentative analysis of the impacts of an airport closure | |
Lemetti et al. | Arrival flight efficiency in pre-and post-Covid-19 pandemics | |
Oo et al. | Analysis of the most common aviation weather hazard and its key mechanisms over the Yangon flight information region | |
Diana | Validating delay constructs: An application of confirmatory factor analysis | |
Stephens et al. | Airside Capacity Utilization in a Nigerian Airport: A Case Study of Murtala Muhammed International Airport | |
Matthews et al. | Strategic forecasts of TRACON airspace capacity during convective weather impacts | |
Boye | Causative Factors of Air Traffic Delay in Muritala Muhammed International Airport Lagos, Nigeria | |
Yablonsky et al. | Flight delay performance at hartsfield-jackson atlanta international airport | |
Evans et al. | Quantifying delay reduction benefits for aviation convective weather decision support systems | |
Skaltsas | Analysis of airline schedule padding on US domestic routes | |
Allan et al. | Operational Benefits of the Integrated Terminal Weather System (ITWS) at Atlanta | |
Dissanayaka et al. | Evaluation of CO₂ Emission from Flight Delays at Taxiing Phase in Bandaranaike International Airport (BIA) | |
Idris | Identification of local and propagated queuing effects at major airports | |
Oo et al. | Research Article Analysis of the Most Common Aviation Weather Hazard and Its Key Mechanisms over the Yangon Flight Information Region | |
Ejem et al. | Performance evaluation of terminal airspace system safety, delay and predictability of Muritala Mohammed International Airport, Ikeja Lagos, Nigeria | |
Oo et al. | A Systematic Climatology Report of Aviation Weather Hazards on Yangon Airport Region | |
El Alj | Estimating the true extent of air traffic delays | |
Szenczuk et al. | Econometric Analysis of Flight Times and the Effects of Performance Based Navigation | |
Zhang et al. | Estimation and Comparison of the Impact of Single Airport Delay to the National Airspace System Using Multivariate Simultaneous Models | |
Klein et al. | Estimating avoidable costs due to convective weather forecast inaccuracy | |
Klein et al. | A refined model for identifying unavoidable portion of the impact of weather and other factors on airport operation | |
Wang | Prediction of Weather Impacts on Airport Arrival Meter Fix Capacity | |
Wright | Aviation system performance during the summer convective weather season |