Ellingwood, 2007 - Google Patents
Strategies for mitigating risk to buildings from abnormal load eventsEllingwood, 2007
- Document ID
- 10653673927155217022
- Author
- Ellingwood B
- Publication year
- Publication venue
- International Journal of Risk Assessment and Management
External Links
Snippet
Building structures customarily are designed to withstand loads from their occupants and the natural environment. The normal design process provides a measure of structural integrity that is also available to withstand events that traditionally have been outside the design …
- 230000002159 abnormal effect 0 title abstract description 49
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/105—Human resources
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public service
- G06Q50/265—Personal security, identity or safety
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/08—Insurance, e.g. risk analysis or pensions
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ellingwood | Strategies for mitigating risk to buildings from abnormal load events | |
Sylves | Federal emergency management comes of age: 1979–2001 | |
Ellingwood | Mitigating risk from abnormal loads and progressive collapse | |
Cimellaro | Urban resilience for emergency response and recovery | |
Stewart et al. | Homeland security: A case study in risk aversion for public decision-making | |
Miskel | Disaster response and homeland security: What works, what doesn't | |
Ghimire et al. | Floods and armed conflict | |
Pinker | An analysis of short-term responses to threats of terrorism | |
Biswas et al. | Digital information resources for disaster management of libraries and information centres | |
Avci et al. | Threat and vulnerability risk assessment for existing subway stations: A simplified approach | |
Stewart et al. | Terrorism risks, chasing ghosts and infrastructure resilience | |
Brown | Presidential policy Directive 8 and the National preparedness system: background and issues for Congress | |
Mueller | Assessing measures designed to protect the homeland | |
Ellingwood | Structural reliability and performance-based engineering | |
Borst et al. | Development of a methodology to assess man-made risks in Germany | |
Kim et al. | Suggestions for Developing Integrated Risk Assessment Method for high-rise buildings in Korea: Based on Analysis of FEMA’s IRVS | |
Ellingwood | Assessment and mitigation of risk from low-probability, high-consequence hazards | |
Urban | Earthquake risk assessment of historical structures | |
Frantzova | MULTIFACTORIAL METHODOLOGY FOR NATURAL НAZARDS RISK ASSESSMENT | |
Marshall et al. | Risk mitigation plan for optimizing protection of constructed facilities | |
Nilsson et al. | Selection and evaluation of fire related scenarios in multifunctional buildings considering antagonistic attacks | |
Shah et al. | Understanding seismic risk recognition and intention for safety measures of residents in Dhaka, Bangladesh | |
Mitchell et al. | Assessing the Nature and Role of Terrorism Risk Models in the Insurance Sector | |
Brinkman et al. | Regulation of physical security for the electric distribution system | |
McGill | Critical asset and portfolio risk analysis for homeland security |