[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Geng, 2014 - Google Patents

Data centers—strategic planning, design, construction, and operations

Geng, 2014

Document ID
10090910221434982636
Author
Geng H
Publication year
Publication venue
Data center handbook

External Links

Continue reading at scholar.google.com (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for programme control, e.g. control unit
    • G06F9/06Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/20Modifications to facilitate cooling, ventilating, or heating
    • H05K7/20709Modifications to facilitate cooling, ventilating, or heating for server racks or cabinets; for data centers, e.g. 19-inch computer racks
    • H05K7/20718Forced ventilation of a gaseous coolant
    • H05K7/20745Forced ventilation of a gaseous coolant within rooms for removing heat from cabinets, e.g. by air conditioning device
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F1/00Details of data-processing equipment not covered by groups G06F3/00 - G06F13/00, e.g. cooling, packaging or power supply specially adapted for computer application
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism

Similar Documents

Publication Publication Date Title
Vasques et al. A review on energy efficiency and demand response with focus on small and medium data centers
Oró et al. Energy efficiency and renewable energy integration in data centres. Strategies and modelling review
Hossain et al. A belief rule based expert system for datacenter PUE prediction under uncertainty
Manganelli et al. Strategies for improving the sustainability of data centers via energy mix, energy conservation, and circular energy
US11216059B2 (en) Dynamic tiering of datacenter power for workloads
Geng Data centers—strategic planning, design, construction, and operations
Patterson et al. Tue, a new energy-efficiency metric applied at ornl’s jaguar
Rahmani et al. A complete model for modular simulation of data centre power load
Lykou et al. A new methodology toward effectively assessing data center sustainability
Balodis et al. History of data centre development
Sandhu et al. Major components associated with green networking in information communication technology systems
Cao et al. Data Center sustainability: Revisits and outlooks
Reddy et al. Best practices for sustainable datacenters
Honée et al. Environmental performance of data centres-a case study of the Swedish National Insurance Administration
Weihl et al. Sustainable data centers
Conficoni et al. Hpc cooling: A flexible modeling tool for effective design and management
Geng SUSTAINABLE DATA CENTER: STRATEGIC PLANNING, DESIGN, CONSTRUCTION, AND OPERATIONS WITH EMERGING TECHNOLOGIES
Isaev et al. Data center efficiency model: A new approach and the role of Artificial Intelligence
Makela et al. Incentives to apply green cloud computing
Nor et al. Energy-saving Framework for Data Center from Reduce, Reuse and Recycle Perspectives.
Anderson Improving data center efficiency
Bliedy et al. Datacentre total cost of ownership (TCO) models: a survey
CODES International review of energy efficiency in Data Centres for IEA EBC Building Energy Codes Working Group
Patel Sustainable ecosystems: enabled by supply and demand management
Ramasamy et al. Balanced Standalone Clustering Unit Commitment Solution for Smart Grid Using Probability Algorithms