Malandri et al., 2017 - Google Patents
Airport ground access reliability and resilience of transit networks: A case studyMalandri et al., 2017
View PDF- Document ID
- 9310931626675728041
- Author
- Malandri C
- Mantecchini L
- Postorino M
- Publication year
- Publication venue
- Transportation Research Procedia
External Links
Snippet
Airport ground access is one of the key determinants influencing air travellers' airport choice. The continuous growth of air travel demand and the consequent induced road congestion have encouraged the development of efficient transit systems approaching the airport, thus …
- 230000010006 flight 0 abstract description 17
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/30—Transportation; Communications
- G06Q50/32—Post and telecommunications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce, e.g. shopping or e-commerce
- G06Q30/02—Marketing, e.g. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards; Price estimation or determination
- G06Q30/0202—Market predictions or demand forecasting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
- G06Q10/047—Optimisation of routes, e.g. "travelling salesman problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/109—Time management, e.g. calendars, reminders, meetings, time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/02—Reservations, e.g. for tickets, services or events
- G06Q10/025—Coordination of plural reservations, e.g. plural trip segments, transportation combined with accommodation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Malandri et al. | Airport ground access reliability and resilience of transit networks: A case study | |
Ingvardson et al. | Passenger arrival and waiting time distributions dependent on train service frequency and station characteristics: A smart card data analysis | |
Sun et al. | Air Transport versus High‐Speed Rail: An Overview and Research Agenda | |
Horn | Multi-modal and demand-responsive passenger transport systems: a modelling framework with embedded control systems | |
Nesheli et al. | A robust, tactic-based, real-time framework for public-transport transfer synchronization | |
Hansen | Micro-level analysis of airport delay externalities using deterministic queuing models: a case study | |
Frumin et al. | Analyzing passenger incidence behavior in heterogeneous transit services using smartcard data and schedule-based assignment | |
Yap et al. | Taking the path less travelled: Valuation of denied boarding in crowded public transport systems | |
Kazhaev et al. | Modelling urban route transport network parameters with traffic, demand and infrastructural limitations being considered | |
Lai et al. | Real-time rescheduling and disruption management for public transit | |
Gomes et al. | Sustainable Demand Responsive Transportation systems in a context of austerity: The case of a Portuguese city | |
Yan et al. | Inter-school bus scheduling under stochastic travel times | |
Marković et al. | A threshold policy for dispatching vehicles in demand-responsive transit systems | |
Avogadro et al. | Assessing airport ground access interventions: An integrated approach combining mode choice modeling and microscopic traffic simulation | |
van der Hurk | Passengers, information, and disruptions | |
Hua et al. | Effect of information contagion during train service disruption for an integrated rail-bus transit system | |
Blainey et al. | New routes on old railways: increasing rail’s mode share within the constraints of the existing railway network | |
Nuzzolo | Schedule-Based Transit Assignment Models (°) | |
Lake et al. | Minimising the conflict between rail operations and infrastructure maintenance | |
Gentile et al. | The theory of transit assignment: demand and supply phenomena | |
Bojic et al. | Optimal railway disruption bridging using heterogeneous bus fleets | |
JP2017154536A (en) | Crew operation management system and crew operation management method | |
Cipriani et al. | Behavioral models for the estimation of the air transport demand: the case study of Rome-London flight connection | |
Xie et al. | Scheduling preference modeling of rail passengers in the Tokyo Metropolitan Area and evaluation of time-varying fare policy for a congested urban railway line | |
Lu et al. | Evaluating the effects of Hong Kong-Zhuhai-Macao bridge on international air travel: demand analysis of the air-bridge-air path |