Ettehadtavakkol et al., 2009 - Google Patents
Gas storage facility design under uncertaintyEttehadtavakkol et al., 2009
View PDF- Document ID
- 8703867941195276835
- Author
- Ettehadtavakkol A
- Jablonowski C
- Lake L
- Publication year
- Publication venue
- SPE Annual Technical Conference and Exhibition?
External Links
Snippet
During the screening and concept selection stages of gas storage projects, many estimates are required to value competing projects and development concepts. These estimates are important because they influence which projects are selected and which concept proceeds …
- 238000003860 storage 0 title abstract description 35
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/30286—Information retrieval; Database structures therefor; File system structures therefor in structured data stores
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/12—Accounting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce, e.g. shopping or e-commerce
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q20/00—Payment architectures, schemes or protocols
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8352227B2 (en) | System and method for performing oilfield simulation operations | |
US8775141B2 (en) | System and method for performing oilfield simulation operations | |
CA2680719C (en) | Multidimensional data repository for modeling oilfield operations | |
Mohaghegh et al. | Modeling, history matching, forecasting and analysis of shale reservoirs performance using artificial intelligence | |
US20140303951A1 (en) | Integrated system for production design assistance | |
Cullick et al. | Optimizing field development concepts for complex offshore production systems | |
Nguyen et al. | Bi-Objective Optimization of Subsurface CO2 Storage with Nonlinear Constraints Using Sequential Quadratic Programming with Stochastic Gradients | |
Nazarov et al. | Integrated Asset Modeling in Mature Offshore Fields: Challenges and Successes | |
Ageh et al. | Using Integrated Production Modeling (IPM) as an Optimization Tool for Field Development Planning and Management | |
Bogdanov et al. | Integrated Modeling of the Complex Multilayer Oil, Gas and Condensate Field Development as a Method of the Project Value Increasing | |
Ettehadtavakkol et al. | Gas storage facility design under uncertainty | |
Mantopoulos et al. | Best practice and lessons learned for the development and calibration of integrated production models for the Cooper Basin, Australia | |
Feria | Integrated Production Modeling: Advanced but, not Always Better | |
Ettehad et al. | Gas storage facility design under uncertainty | |
Saputelli et al. | Waterflood recovery optimization using intelligent wells and decision analysis | |
Kumar et al. | Leveraging Integrated Production Modeling and Digital Platforms to Maximize Liquid Yield and Reduce OPEX from Liquid-Rich Marcellus Reservoirs–A Field Study | |
Wehunt et al. | An Efficient Decision Framework for Optimizing Tight and Unconventional Resources | |
Shahkarami et al. | Performance Forecast and Optimization Workflow for Horizontal Wells: A Case Study on Utica-Point Pleasant Shale Play | |
Al Lawati | Gas lift nodal analysis model–economical optimization approach | |
Gouveia et al. | A Statistical Approach to the Effective Economic Modeling and Portfolio Selection of Unconventional Resource Opportunities | |
Talabi et al. | Integrated Asset Modeling: Modernizing the Perspective for Short-Term Forecasting and Production Enhancements | |
Saputelli et al. | How Integrated Field Studies Help Asset Teams Make Optimal Field Development Decisions | |
Jones et al. | The use of reservoir simulation in estimating reserves | |
Asgarov et al. | Uncertainty and Risk Assessment Using Ensemble Modeling for Major Development Decision | |
Pothapragada et al. | Integrated production system modeling of the Bahrain field |