Zankoul et al., 2016 - Google Patents
Modeling, animating, and optimizing on-shore wind farm construction operationsZankoul et al., 2016
- Document ID
- 8163787891643555400
- Author
- Zankoul E
- Khoury H
- Publication year
- Publication venue
- Journal of Computing in Civil Engineering
External Links
Snippet
Recently, wind energy has been greatly sought after because of the high price and diminishing quantity of fossil fuel resources. This necessitated the construction of wind farms. However, the on-shore wind farm construction process can be a very complicated …
- 238000010276 construction 0 title abstract description 112
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5086—Mechanical design, e.g. parametric or variational design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AbouRizk et al. | Research in modeling and simulation for improving construction engineering operations | |
Chong et al. | Comparative analysis on the adoption and use of BIM in road infrastructure projects | |
Cheng et al. | Analytical review and evaluation of civil information modeling | |
Kamat et al. | Research in visualization techniques for field construction | |
Li et al. | Virtual prototyping for planning bridge construction | |
Wong et al. | Toward low-carbon construction processes: the visualisation of predicted emission via virtual prototyping technology | |
AbouRizk | Role of simulation in construction engineering and management | |
Poku et al. | Construction scheduling and progress control using geographical information systems | |
Moselhi et al. | Optimization of earthmoving operations in heavy civil engineering projects | |
Moret et al. | Construction cost and duration uncertainty model: Application to high-speed rail line project | |
Ugwu et al. | Sustainability appraisal in infrastructure projects (SUSAIP): Part 2: A case study in bridge design | |
Shahin et al. | Modeling weather-sensitive construction activity using simulation | |
Park et al. | 3D/4D CAD applicability for life-cycle facility management | |
Kim et al. | Highway alignment construction comparison using object-oriented 3D visualization modeling | |
Al-Bataineh et al. | Using simulation to plan tunnel construction | |
Son et al. | Determination of haul distance and direction in mass excavation | |
Zankoul et al. | Modeling, animating, and optimizing on-shore wind farm construction operations | |
Zarghami | Forecasting project duration in the face of disruptive events: A resource-based approach | |
Du et al. | Construction simulation for a core rockfill dam based on optimal construction stages and zones: case study | |
Tatum | Building better: technical support for construction | |
Wang et al. | A real-time online structure-safety analysis approach consistent with dynamic construction schedule of underground caverns | |
Morley et al. | Identification of invariant average weighted haul distance to simplify earthmoving simulation modeling in planning site grading operations | |
Chong et al. | Estimating highway construction production rates during design: Elements of a useful estimation tool | |
Krepp et al. | BIMsite-towards a BIM-based generation and evaluation of realization variants comprising construction methods, site layouts and schedules | |
Le et al. | A novel mobile information system for risk management of adjacent buildings in urban underground construction |