Leniek et al., 2000 - Google Patents
Pumping with Coiled Tubing-A New Coiled Tubing ApplicationLeniek et al., 2000
- Document ID
- 7727301872284324207
- Author
- Leniek H
- Ayestaran L
- Yang Y
- Publication year
- Publication venue
- SPE/ICoTA Well Intervention Conference and Exhibition
External Links
Snippet
Coiled-Tubing (CT) continues to grow as an enabling technology that provides cost economy and time efficiency for the oil and gas industry. It has gained wider acceptance than ever due to efforts of the manufacturers, CT application engineers, and field operators …
- 238000005086 pumping 0 title abstract description 26
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/103—Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/006—Production of coal-bed methane
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Devegowda et al. | An assessment of subsea production systems | |
Kumar et al. | Tubing and Rod Failure Analysis in Rod Pumped Wells in an Indian Western Oil Field | |
Clarke et al. | Sucker rod pumping in the eagle ford shale field study | |
Romer et al. | Offshore ESP selection criteria: An industry study | |
Kennedy et al. | Ultra-long stroke and intelligent rod pumping system for producing difficult wells and/or fluids | |
Dunn et al. | Progressing cavity pumping system applications in heavy oil production | |
Darvish Sarvestani et al. | artificial lift method selection for mature oil fields: A case study | |
Leniek et al. | Pumping with Coiled Tubing-A New Coiled Tubing Application | |
Langbauer et al. | Hydraulic concentric tubular pumping system for lifting oil in EOR completions | |
Cortines et al. | Sucker-rod lift in horizontal wells in pearsall field, texas | |
Genetti et al. | Applying improved recovery processes and effective reservoir management to maximize oil recovery at Salt Creek | |
Covatch et al. | Stripper well consortium offers opportunities and technologies to the stripper well industry | |
Hidayat et al. | Improves Sucker Rod and Tubing Lifetime Applying the Wear Predict 99 Equation | |
Zhao et al. | System Analysis and Application of Combined System of ESP and Gas Lift | |
Lee | Computer modeling and optimization for submersible pump lifted wells | |
Solanet et al. | Coiled tubing used as a continuous sucker-rod system in slim holes: Successful field experience | |
Han et al. | An approach to the optimum design of sucker-rod pumping systems | |
Rotramel et al. | A pilot test of continuous bottom hole pressure monitoring for production optimization of coalbed methane in the Raton Basin | |
Amani | Hydraulic gas pump: A discussion of its power usage | |
Blann et al. | Advances in heavy oil lifting in the morichal area of venezuela | |
Pandit et al. | Special Implementation of SRP in Failed Existing Artificial Lift System | |
Ghamdi et al. | Techno-Commercial Study for Selecting Efficient Artificial Lift Method | |
Hochanadel et al. | Planning the Production Lifecycle of a Newly Developed Gas Field in a Remote Desert | |
Mantecon | Gas-lift optimisation on Barrow Island, Western Australia | |
Sompopsart et al. | A New Gas Lift-Beam Pump Hybrid Completion Design in Thailand Onshore Field |