[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Jain et al., 2014 - Google Patents

Vacation queuing model for a machining system with two unreliable repairmen

Jain et al., 2014

View PDF
Document ID
7495870438191434376
Author
Jain M
Shekhar C
Shukla S
Publication year
Publication venue
International Journal of Operational Research

External Links

Snippet

This investigation is concerned with multi-component machining system having two types of warm standby units and two unreliable heterogeneous repairmen. The life time and repair time of the failed units are exponentially distributed. The first repairman is working according …
Continue reading at www.researchgate.net (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Error detection; Error correction; Monitoring responding to the occurence of a fault, e.g. fault tolerance
    • G06F11/16Error detection or correction of the data by redundancy in hardware
    • G06F11/20Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements
    • G06F11/202Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements where processing functionality is redundant
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Error detection; Error correction; Monitoring responding to the occurence of a fault, e.g. fault tolerance
    • G06F11/0703Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/30Information retrieval; Database structures therefor; File system structures therefor
    • G06F17/30286Information retrieval; Database structures therefor; File system structures therefor in structured data stores
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for programme control, e.g. control unit
    • G06F9/06Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0259Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
    • G05B23/0283Predictive maintenance, e.g. involving the monitoring of a system and, based on the monitoring results, taking decisions on the maintenance schedule of the monitored system; Estimating remaining useful life [RUL]
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06NCOMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N99/00Subject matter not provided for in other groups of this subclass
    • G06N99/005Learning machines, i.e. computer in which a programme is changed according to experience gained by the machine itself during a complete run
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F15/00Digital computers in general; Data processing equipment in general
    • G06F15/16Combinations of two or more digital computers each having at least an arithmetic unit, a programme unit and a register, e.g. for a simultaneous processing of several programmes

Similar Documents

Publication Publication Date Title
Malhotra et al. Stochastic Analysis of a Two‐Unit Cold Standby System Wherein Both Units May Become Operative Depending upon the Demand
Jain et al. Vacation queuing model for a machining system with two unreliable repairmen
Jain et al. Availability analysis for repairable system with warm standby, switching failure and reboot delay
Yen et al. Reliability-based measure of a retrial machine repair problem with working breakdowns under the F-policy
Jain Transient analysis of machining systems with service interruption, mixed standbys and priority
Kumar et al. Reliability analysis of a multi-component machining system with service interruption, imperfect coverage, and reboot
Jain Availability prediction of imperfect fault coverage system with reboot and common cause failure
Jain et al. Cost analysis of a machine repair problem with standby, working vacation and server breakdown
Pan et al. Single-machine group scheduling problem considering learning, forgetting effects and preventive maintenance
Jain et al. N-policy for a multi-component machining system with imperfect coverage, reboot and unreliable server
Jain et al. Markovian analysis of unreliable multi-components redundant fault tolerant system with working vacation and F-policy
Kumar et al. Bi-level control of degraded machining system with two unreliable servers, multiple standbys, startup and vacation
Jain et al. Multi server machine repair problem with unreliable server and two types of spares under asynchronous vacation policy
Kang et al. Flexible preventative maintenance for serial production lines with multi-stage degrading machines and finite buffers
Kumar et al. Threshold N-policy for (M, m) degraded machining system with K-heterogeneous servers, standby switching failure and multiple vacations
Jain et al. A time-shared machine repair problem with mixed spares under N-policy
Gao Availability and reliability analysis of a retrial system with warm standbys and second optional repair service
Tasias et al. Economic− statistical design of Vp control schemes for joint monitoring of mean and variance in the presence of multiple assignable causes
Wu et al. Reliability analysis of ak-out-of-n: G system with general repair times and replaceable repair equipment
Wu et al. Dynamic control of a machine repair problem with switching failure and unreliable repairmen
Zhang et al. Equilibrium customer strategies in the single‐server constant retrial queue with breakdowns and repairs
He et al. Performance analysis of machine repair system with single working vacation
Jain et al. Queueing analysis of two unreliable servers machining system with switching and common cause failure
US10657199B2 (en) Calibration technique for rules used with asset monitoring in industrial process control and automation systems
Yusuf Availability modelling and evaluation of a repairable system subject to minor deterioration under imperfect repairs