Arukhe et al., 2013 - Google Patents
Record coiled tubing aided reach and first real-time injection profiling with tractor in extended reach wellArukhe et al., 2013
- Document ID
- 7334915306291427508
- Author
- Arukhe J
- Ghamdi S
- Dhufairi M
- Duthie L
- Omairen K
- Ahmari A
- Harbi M
- Onwuliri C
- Elsherif T
- Othman B
- Publication year
- Publication venue
- SPE Middle East Oil and Gas Show and Conference
External Links
Snippet
To enhance well performance intervention work is often necessary in field developments. Challenges exist in vertical well interventions and these have been studied and improved over the years. However, horizontal well interventions pose a completely new challenge and …
- 238000002347 injection 0 title abstract description 53
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/1015—Locating fluid leaks, intrusions or movements using tracers: using radioactivity
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface or from the surface to the well, e.g. for logging while drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/023—Arrangements for connecting cables or wirelines to downhole devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/09—Locating or determining the position of objects in boreholes or wells, e.g. the position of an extending arm; Identifying the free or blocked portions of pipes
- E21B47/0905—Locating or determining the position of objects in boreholes or wells, e.g. the position of an extending arm; Identifying the free or blocked portions of pipes by detecting magnetic anomalies
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/119—Details, e.g. for locating perforating place or direction
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B23/00—Apparatus for displacing, setting, locking, releasing, or removing tools, packers or the like in the boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
Similar Documents
Publication | Publication Date | Title |
---|---|---|
O. Arukhe et al. | Saudi Arabia's two world records for aided coiled tubing reach and real time logging in extended reach well | |
Arukhe et al. | Record coiled tubing aided reach and first real-time injection profiling with tractor in extended reach well | |
Al-Buali et al. | Maximizing coiled tubing reach during logging extended horizontal wells using E-line agitator | |
Arukhe et al. | Saudi Arabia's Manifa giant offshore field development: the role of technology | |
Kenison et al. | An improved method of manipulating and evaluating sliding sleeves | |
Glasbergen et al. | Fluid Diversion monitoring: the key to treatment optimization | |
Arukhe et al. | A new solution to an old problem: Tractored CT conveyed real-time water injection profiling in ultra deep wells | |
Lerose et al. | Real-time Fiber-optic Coiled Tubing Delivered Well Intervention Savings Through Faster Decision-making Process | |
AlDhufairi et al. | Stimulation with innovative fluid-placement methodology and world first production logging with fiber optic enabled coiled tubing (CT) | |
Dhufairi et al. | While Drilling Mobility and Distributed Temperature Profiles Applied to Matrix Stimulation of a Giant Carbonate Oil Field: A Case Study | |
Malik et al. | First Worldwide Successful Implementation of Coiled Tubing Compatible Novel Fiber Laden Diverter for Matrix Stimulation Using New Generation High Rate Fiber Optic Real Time Telemetry System | |
Hoy et al. | Production Technology Selection for an EOR Redevelopment Project–Lessons Learned from Polymer Pilots | |
Siddiqui et al. | Enhance of Oil Production from an Old Well in Thin Carbonate Reservoir through Acid Tunneling-A Case Study | |
Rae et al. | Improved Method for Underbalanced Perforating with Coiled Tubing in the South China Sea | |
Aviles et al. | Redefinition of Well Interventions in Naturally-Fractured Carbonate Reservoirs through Real-Time Coiled Tubing-Deployed, Fiber Optic Monitoring | |
Al-Ebrahim et al. | Using e-coiled tubing for production logging while n2 lifting in horizontal/deviated exploratory well | |
Rahimov et al. | Cleaned Out a Mile of Formation Sands in a Highly Deviated Wellbore with a New Coiled Tubing Real Time Downhole Measurement System | |
Jassem et al. | First Worldwide Coiled Tubing Stimulation of a Quad-Lateral Extended Reach Power Water Injector Using Multi-Lateral Tool With Gamma Ray & Distributed Temperature Survey | |
Arukhe et al. | The First Real Time Logging with Coiled Tubing Tractor in an Extended Reach Horizontal Well with Proof of True Stimulation | |
Arukhe et al. | Technology Improvements in the Giant Manifa Field Maturation Project | |
P Mosar et al. | Innovative Solution for IWAG Injection Monitoring Using Fiber Optic Cable Cemented Behind Casing in an Intelligent Well: A First in Malaysia | |
Formica et al. | Tractor-conveyed sensors and chemical packer are utilized to remediate an extended-reach horizontal uncemented slotted liner completion in a siliceous shale reservoir, kern county, California, USA | |
Sookram et al. | Enabling Production Logging in Commingled Flow During HPHT DSTs Allows Critical Dynamic Data Integration for the Khuff Formation in the UAE | |
Al-Shammari et al. | First Ever Well Intervention of Multispinner Production Logging Tool Conveyed via Coiled Tubing in an Innovative Pseudo-Lateral Completion in Saudi Arabia Oil Field–A Story of Success | |
Yudhanto et al. | Overview of Multi-Stage Fracturing Using Fiber Enabled Coiled Tubing Plug and Perf Method: First Deployment in Indonesia |