Temkin et al., 2018 - Google Patents
Predictive analytics in mining. dispatch system is the core element of creating intelligent digital mineTemkin et al., 2018
- Document ID
- 7129141548923241043
- Author
- Temkin I
- Klebanov D
- Deryabin S
- Konov I
- Publication year
- Publication venue
- International Conference on Modern Information Technology and IT Education
External Links
Snippet
The following article is devoted to using prediction analytics methods in controlling a mining and logistics complex of an open-pit mine. The possibilities of using telemetric information for solving a wide variety of important technological tasks, that are then reduced to data …
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32234—Maintenance planning
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computer systems utilising knowledge based models
- G06N5/02—Knowledge representation
- G06N5/022—Knowledge engineering, knowledge acquisition
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8099217B2 (en) | Performance-based haulage management system | |
WO2020097486A1 (en) | Performing tasks using autonomous machines | |
Naskoudakis et al. | A thematic review of main researches on construction equipment over the recent years | |
Temkin et al. | Predictive analytics in mining. dispatch system is the core element of creating intelligent digital mine | |
Çetin | Open pit truck/shovel haulage system simulation | |
Peterson | New forces at work in mining: industry views of critical technologies | |
Jurdziak et al. | Conveyor Belt 4.0 | |
Song et al. | A review of real-time optimization in underground mining production | |
Temkin et al. | Possible architecture and some neuro-fuzzy algorithms of an intelligent control system for open pit mines transport facilities | |
Shah | Machine learning algorithms for predictive maintenance in autonomous vehicles | |
Nanda | Intelligent enterprise with Industry 4.0 for mining industry | |
Petroutsatou et al. | Integrated prescriptive maintenance system (PREMSYS) for construction equipment based on productivity | |
Gustafson | Automation of Load Haul Dump machines: comparative performance analysis and maintenance modeling | |
Gölbaşı et al. | Equipment replacement analysis of manual trucks with autonomous truck technology in open pit mines | |
Price et al. | Mine planning and selection of autonomous trucks | |
Gustafson | Dependability assurance for automatic load haul dump machines | |
Jakobsson | Data-driven Condition Monitoring in Mining Vehicles | |
Skoczylas et al. | The Concept of an Intelligent Decision Support System for Ore Transportation in Underground Mine | |
CN116862353A (en) | System, method, and computer storage medium for generating a unified digital material supply chain for real material supply | |
Semmar et al. | Modeling input data of control system of a mining production unit based on ISA-95 approach | |
Al-Masri | An approach for Evaluating the Full Truck and Full Bucket Loading Strategies in Open-Pit Mining Using a Discrete Event Simulation and Machine Learning | |
Qudrat-Ullah et al. | Integrated and Advanced Information Systems in LSOPM Operations | |
Alshibani et al. | Advancing sustainability: An integrated decision support framework for fleet selection in open pit mining construction | |
Galar et al. | Advanced analytics for modern mining | |
Rylander | Productivity Improvements in Construction Transport Operation through Lean Thinking and Systems of Systems |