[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Ndiaye et al., 2016 - Google Patents

Automated transportation of auxiliary resources in a semiconductor manufacturing facility

Ndiaye et al., 2016

Document ID
6755788571992618253
Author
Ndiaye M
Dauzère-Pérès S
Yugma C
Rullière L
Lamiable G
Publication year
Publication venue
2016 Winter Simulation Conference (WSC)

External Links

Snippet

In this paper, we study the design of an Automated Guided Vehicle (AGV) transport system for the main auxiliary resource, the mask (also called reticle), in the photolithography area of a semiconductor wafer fabrication facility. We propose two approaches: A static approach …
Continue reading at ieeexplore.ieee.org (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for programme control, e.g. control unit
    • G06F9/06Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Programme initiating; Programme switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
    • G06F9/4881Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for programme control, e.g. control unit
    • G06F9/06Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders

Similar Documents

Publication Publication Date Title
Ndiaye et al. Automated transportation of auxiliary resources in a semiconductor manufacturing facility
Chien et al. A novel route selection and resource allocation approach to improve the efficiency of manual material handling system in 200-mm wafer fabs for industry 3.5
CN109878959B (en) Sorting scheduling method and device, warehousing system and readable storage medium
US7953507B2 (en) Method and system for intelligent automated reticle managment
Confessore et al. A network flow based heuristic approach for optimising AGV movements
WO2023165189A1 (en) Wafer transfer supervision control method and system, computer device and storage medium
Reddy et al. Flexible manufacturing systems modelling and performance evaluation using AutoMod
TWI754491B (en) Method for optimizing placement of otg wireless charging units
Rubrico et al. Online rescheduling of multiple picking agents for warehouse management
Lin et al. A simulation-based optimization approach for a semiconductor photobay with automated material handling system
Wang et al. The heuristic preemptive dispatching method of material transportation system in 300 mm semiconductor fabrication
Qin et al. Dynamic dispatching for interbay material handling by using modified Hungarian algorithm and fuzzy-logic-based control
Jang et al. An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines
Laipple et al. Generic data model for semiconductor manufacturing supply chains
Reith et al. Evaluating automated guided vehicle system characteristics in semiconductor fab automated material handling systems
Ventura et al. Optimal location of dwell points in a single loop AGV system with time restrictions on vehicle availability
Kiba et al. Simulation of a full 300mm semiconductor manufacturing plant with material handling constraints
Chaabane et al. Analyzing the impact of key parameters of vehicle management policies in a unified AMHS
Ben-Salem et al. A simulation-based approach for an effective AMHS design in a legacy semiconductor manufacturing facility
Benzoni et al. Vehicle Look-Ahead Dispatching for Overhead Hoist Transport System in Semiconductor Manufacturing
Badakhshian et al. Performance optimization of simultaneous machine and automated guided vehicle scheduling using fuzzy logic controller based genetic algorithm
Chung Estimating arrival times of transportation jobs for automated material handling in LCD fabrication facilities
Benzoni et al. Allocating reticles in an automated stocker for semiconductor manufacturing facility
Bergmann et al. Adaptive AGV fleet management in a dynamically changing production environment
Zhang et al. Time bound control in a stochastic dynamic wafer fab