Ndiaye et al., 2016 - Google Patents
Automated transportation of auxiliary resources in a semiconductor manufacturing facilityNdiaye et al., 2016
- Document ID
- 6755788571992618253
- Author
- Ndiaye M
- Dauzère-Pérès S
- Yugma C
- Rullière L
- Lamiable G
- Publication year
- Publication venue
- 2016 Winter Simulation Conference (WSC)
External Links
Snippet
In this paper, we study the design of an Automated Guided Vehicle (AGV) transport system for the main auxiliary resource, the mask (also called reticle), in the photolithography area of a semiconductor wafer fabrication facility. We propose two approaches: A static approach …
- 238000004519 manufacturing process 0 title abstract description 19
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for programme control, e.g. control unit
- G06F9/06—Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Programme initiating; Programme switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4843—Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
- G06F9/4881—Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for programme control, e.g. control unit
- G06F9/06—Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ndiaye et al. | Automated transportation of auxiliary resources in a semiconductor manufacturing facility | |
Chien et al. | A novel route selection and resource allocation approach to improve the efficiency of manual material handling system in 200-mm wafer fabs for industry 3.5 | |
CN109878959B (en) | Sorting scheduling method and device, warehousing system and readable storage medium | |
US7953507B2 (en) | Method and system for intelligent automated reticle managment | |
Confessore et al. | A network flow based heuristic approach for optimising AGV movements | |
WO2023165189A1 (en) | Wafer transfer supervision control method and system, computer device and storage medium | |
Reddy et al. | Flexible manufacturing systems modelling and performance evaluation using AutoMod | |
TWI754491B (en) | Method for optimizing placement of otg wireless charging units | |
Rubrico et al. | Online rescheduling of multiple picking agents for warehouse management | |
Lin et al. | A simulation-based optimization approach for a semiconductor photobay with automated material handling system | |
Wang et al. | The heuristic preemptive dispatching method of material transportation system in 300 mm semiconductor fabrication | |
Qin et al. | Dynamic dispatching for interbay material handling by using modified Hungarian algorithm and fuzzy-logic-based control | |
Jang et al. | An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines | |
Laipple et al. | Generic data model for semiconductor manufacturing supply chains | |
Reith et al. | Evaluating automated guided vehicle system characteristics in semiconductor fab automated material handling systems | |
Ventura et al. | Optimal location of dwell points in a single loop AGV system with time restrictions on vehicle availability | |
Kiba et al. | Simulation of a full 300mm semiconductor manufacturing plant with material handling constraints | |
Chaabane et al. | Analyzing the impact of key parameters of vehicle management policies in a unified AMHS | |
Ben-Salem et al. | A simulation-based approach for an effective AMHS design in a legacy semiconductor manufacturing facility | |
Benzoni et al. | Vehicle Look-Ahead Dispatching for Overhead Hoist Transport System in Semiconductor Manufacturing | |
Badakhshian et al. | Performance optimization of simultaneous machine and automated guided vehicle scheduling using fuzzy logic controller based genetic algorithm | |
Chung | Estimating arrival times of transportation jobs for automated material handling in LCD fabrication facilities | |
Benzoni et al. | Allocating reticles in an automated stocker for semiconductor manufacturing facility | |
Bergmann et al. | Adaptive AGV fleet management in a dynamically changing production environment | |
Zhang et al. | Time bound control in a stochastic dynamic wafer fab |