Parada et al., 2009 - Google Patents
Heuristic determination of distribution treesParada et al., 2009
View PDF- Document ID
- 6438829690866261699
- Author
- Parada V
- Ferland J
- Arias M
- Schwarzenberg P
- Vargas L
- Publication year
- Publication venue
- IEEE Transactions on Power Delivery
External Links
Snippet
Electrical distribution networks develop configurations that deviate from the original long- term plan. The Distribution Trees Problem (DTP) is one means of measuring this development, which finds the deviation between long-term planning and the optimal …
- 238000000034 method 0 abstract description 69
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Khanabadi et al. | Optimal transmission switching considering voltage security and N-1 contingency analysis | |
Volkanovski et al. | Application of the fault tree analysis for assessment of power system reliability | |
Alizadeh et al. | Reliability constrained coordination of generation and transmission expansion planning in power systems using mixed integer programming | |
Korad et al. | Robust corrective topology control for system reliability | |
Pinto et al. | Multi‐objective and multi‐period distribution expansion planning considering reliability, distributed generation and self‐healing | |
Ruiz et al. | Security-constrained transmission topology control MILP formulation using sensitivity factors | |
WO2010138906A1 (en) | Capital asset planning system | |
Zare et al. | Optimal reconfigurattion of distribution systems by considering switch and wind turbine placements to enhance reliability and efficiency | |
Jiang et al. | Short-term load forecasting based automatic distribution network reconfiguration | |
Wang et al. | Critical components for maintenance outage scheduling considering weather conditions and common mode outages in reconfigurable distribution systems | |
Chen et al. | Mitigation of cascading outages using a dynamic interaction graph-based optimal power flow model | |
Li et al. | Feeder‐corridor‐based distribution network planning model with explicit reliability constraints | |
Thurner | Structural Optimizations in Strategic Medium Voltage Power System Planning | |
Seta et al. | Comprehensive approach for distribution system planning with uncertainties | |
Parada et al. | Heuristic determination of distribution trees | |
Numan et al. | Impact assessment of a co‐optimized dynamic line rating and transmission switching topology on network expansion planning | |
JP4020201B2 (en) | Power system supply reliability evaluation method and apparatus | |
Gomes et al. | Optimal placement of manual and remote-controlled switches based on the Pareto front | |
Grond et al. | Practice-oriented optimization of distribution network planning using metaheuristic algorithms | |
Abbasghorbani et al. | Circuit breakers maintenance planning for composite power systems | |
Saric et al. | Two-stage stochastic programming model for market clearing with contingencies | |
WO2022118495A1 (en) | Power system operation plan creation assistance device and method | |
Marques et al. | Service restoration in large-scale distribution systems considering three levels of priority customers | |
Tabares et al. | Planning of reserve branches to increase reconfiguration capability in distribution systems: a scenario-based convex programming approach | |
Olfatinezhad et al. | Flexible two‐stage robust model for moving the transmission and reactive power infrastructures expansion planning towards power system integration of renewables |