Bertuzzi, 2004 - Google Patents
100-Year design life of rock bolts and shotcreteBertuzzi, 2004
View PDF- Document ID
- 6267008354556781783
- Author
- Bertuzzi R
- Publication year
- Publication venue
- Ground Support in Mining and Underground Construction, London
External Links
Snippet
One of the main technical challenges of underground construction for public space is ensuring the long-term design life of support components. It is common for owners to specify a 100-year design life. Can designers, suppliers and constructors guarantee this? A few …
- 239000011435 rock 0 title abstract description 38
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0026—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
- E21D21/004—Bolts held in the borehole by friction all along their length, without additional fixing means
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/08—Members specially adapted to be used in prestressed constructions
- E04C5/12—Anchoring devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/01—Reinforcing elements of metal, e.g. with non-structural coatings
- E04C5/06—Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Tazarv et al. | UHPC-filled duct connections for accelerated bridge construction of RC columns in high seismic zones | |
Salcher et al. | Results of pull tests of rock bolts and cable bolts in Sydney sandstone and shale | |
Hewson | Prestressed concrete bridges: design and construction | |
Liu et al. | Full-scale pullout tests and analyses of ground anchors in rocks under ultimate load conditions | |
Cao et al. | A study of rock bolting failure modes | |
Wu et al. | Experimental estimation of seismic properties of new precast shear wall spatial structure model | |
Hu et al. | Experimental and numerical study on CFRP-lined prestressed concrete cylinder pipe under internal pressure | |
Cui et al. | Laboratory investigation into effect of bolt profiles on shear behaviors of bolt-grout interface under constant normal stiffness (CNS) conditions | |
Pelz et al. | Spray-applied waterproofing membranes in tunnelling: Application and research directions in Australia | |
Bertuzzi | 100-Year design life of rock bolts and shotcrete | |
Zhou et al. | Investigation on the seismic performance of the masonry infill wall with damping layer joint | |
Mothersille et al. | Grouting of anchors to resist hydrostatic uplift at Burnley tunnel, Melbourne, Australia | |
Nitschke et al. | Performance of macro synthetic fiber reinforced tunnel linings | |
Cao | Bolt profile configuration and load transfer capacity optimisation | |
Tan et al. | Slope stabilization using soil nails: design assumptions and construction realities | |
Littlejohn | Ground anchorages: corrosion performance | |
Liao et al. | Remedial measures for existing anchored slopes in Taiwan | |
Pells et al. | Permanent rockbolts-the problems are in the detail | |
Krauser | Repairs, modifications, and strengthening with post-tensioning | |
Brierley et al. | Tunnel Lining Design, Part 1: Design Considerations. | |
Zahra et al. | Out-of-plane flexural behaviour of reinforced mortarless concrete block masonry: An experimental study | |
Pastars et al. | Determination of load transfer characteristics of gloved resin bolts from laboratory and in situ field testing | |
Rebhan et al. | Development of a double-corrosion-protected self-drilling micropile for the foundation of rockfall protection structures | |
Dervishhasani | Investigation on the capacity of TL-5 GFRP-reinforced concrete bridge barrier-deck anchorage subjected to transverse vehicle impact loading | |
Sharma et al. | Repair Options for Corrosion-damaged Prestressed Concrete Structures |