Kurasov et al., 2021 - Google Patents

Substantiation of methods of improving safety of pipeline gas transportation

Kurasov et al., 2021

View PDF
Document ID
6073007304038144750
Author
Kurasov O
Burkov P
Publication year
Publication venue
E3S Web of Conferences

External Links

Snippet

Ensuring the operational efficiency of hazardous production facilities throughout their entire service life becomes a formidable challenge associated with coordinating thorough monitoring of such facilities, assessing their exposure, mitigation and sustainability, and …
Continue reading at www.e3s-conferences.org (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0635Risk analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis

Similar Documents

Publication Publication Date Title
Bhatia et al. Dynamic risk-based inspection methodology
Kurasov et al. Substantiation of methods of improving safety of pipeline gas transportation
Seo et al. A risk-based inspection planning method for corroded subsea pipelines
Xie et al. Risk-based pipeline re-assessment optimization considering corrosion defects
Shuai et al. Risk-based inspection for large-scale crude oil tanks
Leoni et al. On risk-based maintenance: A comprehensive review of three approaches to track the impact of consequence modelling for predicting maintenance actions
Sýkora et al. Bayesian network application for the risk assessment of existing energy production units
Zhou et al. Optimal design of onshore natural gas pipelines
Vianello et al. Cost–benefit analysis approach for the management of industrial safety in chemical and petrochemical industry
Park et al. Comprehensive framework for underground pipeline management with reliability and cost factors using Monte Carlo simulation
Song et al. Quantitative risk-based inspection approach for high-energy piping using a probability distribution function and modification factor
KR101717560B1 (en) Corrosion risk management system and method
Li et al. A risk-based maintenance decision model for subsea pipeline considering pitting corrosion growth
Shan et al. A methodology to determine the target reliability of natural gas pipeline systems based on risk acceptance criteria of pipelines
Vinod et al. Reliability analysis of pipelines carrying H2S for risk based inspection of heavy water plants
Soares et al. Risk-based inspection in the context of nuclear power plants
Qian et al. Probabilistic fracture assessment of piping systems based on FITNET FFS procedure
SobrAl et al. Establishment of optimal physical assets inspection frequency based on risk principles
Langer et al. Semi-quantitative reliability-based ranking method for assessment of pipeline dents with stress risers
Milazzo et al. The influence of risk prevention measures on the frequency of failure of piping
Zhang et al. Reliability analysis of aged natural gas pipelines based on utility theory
Yacine et al. Contribution to the ageing control of onshore oil and gas fields
Park et al. Quantitative and Probabilistic Approach for Underground Pipeline Management Optimization
Attia et al. Reliability of quantitative risk analysis through an industrial case study
Khan et al. Risk-based inspection and maintenance (RBIM) of power plants