Substantiation of methods of improving safety of pipeline gas transportationKurasov et al., 2021
View PDF- Document ID
- 6073007304038144750
- Author
- Kurasov O
- Burkov P
- Publication year
- Publication venue
- E3S Web of Conferences
External Links
Snippet
Ensuring the operational efficiency of hazardous production facilities throughout their entire service life becomes a formidable challenge associated with coordinating thorough monitoring of such facilities, assessing their exposure, mitigation and sustainability, and …
- 238000004642 transportation engineering 0 title description 14
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Bhatia et al. | Dynamic risk-based inspection methodology | |
Kurasov et al. | Substantiation of methods of improving safety of pipeline gas transportation | |
Seo et al. | A risk-based inspection planning method for corroded subsea pipelines | |
Xie et al. | Risk-based pipeline re-assessment optimization considering corrosion defects | |
Shuai et al. | Risk-based inspection for large-scale crude oil tanks | |
Leoni et al. | On risk-based maintenance: A comprehensive review of three approaches to track the impact of consequence modelling for predicting maintenance actions | |
Sýkora et al. | Bayesian network application for the risk assessment of existing energy production units | |
Zhou et al. | Optimal design of onshore natural gas pipelines | |
Vianello et al. | Cost–benefit analysis approach for the management of industrial safety in chemical and petrochemical industry | |
Park et al. | Comprehensive framework for underground pipeline management with reliability and cost factors using Monte Carlo simulation | |
Song et al. | Quantitative risk-based inspection approach for high-energy piping using a probability distribution function and modification factor | |
KR101717560B1 (en) | Corrosion risk management system and method | |
Li et al. | A risk-based maintenance decision model for subsea pipeline considering pitting corrosion growth | |
Shan et al. | A methodology to determine the target reliability of natural gas pipeline systems based on risk acceptance criteria of pipelines | |
Vinod et al. | Reliability analysis of pipelines carrying H2S for risk based inspection of heavy water plants | |
Soares et al. | Risk-based inspection in the context of nuclear power plants | |
Qian et al. | Probabilistic fracture assessment of piping systems based on FITNET FFS procedure | |
SobrAl et al. | Establishment of optimal physical assets inspection frequency based on risk principles | |
Langer et al. | Semi-quantitative reliability-based ranking method for assessment of pipeline dents with stress risers | |
Milazzo et al. | The influence of risk prevention measures on the frequency of failure of piping | |
Zhang et al. | Reliability analysis of aged natural gas pipelines based on utility theory | |
Yacine et al. | Contribution to the ageing control of onshore oil and gas fields | |
Park et al. | Quantitative and Probabilistic Approach for Underground Pipeline Management Optimization | |
Attia et al. | Reliability of quantitative risk analysis through an industrial case study | |
Khan et al. | Risk-based inspection and maintenance (RBIM) of power plants |