Yang et al., 2009 - Google Patents
Reservoir development modeling using full physics and proxy simulationsYang et al., 2009
- Document ID
- 5949302350959200238
- Author
- Yang Y
- Davidson J
- Fenter D
- Ozen O
- Boyett B
- Publication year
- Publication venue
- IPTC 2009: International Petroleum Technology Conference
External Links
Snippet
This paper describes a modeling technique for reservoir development using full physics and proxy simulations. Traditionally, full physics simulation involves gridding and discretization, fluid property calculations, displacement modeling, assembling matrix equations, and …
- 238000004088 simulation 0 abstract description 76
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/166—Injecting a gaseous medium; Injecting a gaseous medium and a liquid medium
- E21B43/168—Injecting a gaseous medium
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5086—Mechanical design, e.g. parametric or variational design
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/34—Arrangements for separating materials produced by the well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3002409B1 (en) | Multiphase flow simulator submodeling | |
US8271247B2 (en) | Modeling and management of reservoir systems with material balance groups | |
US8775141B2 (en) | System and method for performing oilfield simulation operations | |
US10013512B2 (en) | Network flow model | |
US20080133194A1 (en) | System and method for performing oilfield simulation operations | |
US20060224369A1 (en) | Performance prediction method for hydrocarbon recovery processes | |
CA2691241C (en) | System and method for performing oilfield simulation operations | |
EA008321B1 (en) | Method and system for integrated reservoir and surface facility networks simulation | |
CA2925719C (en) | Wellbore thermal flow, stress and well loading analysis with jet pump | |
NO20151401A1 (en) | Integrated production design assistance system | |
Kosmala et al. | Coupling of a surface network with reservoir simulation | |
Gurses et al. | Dynamic modeling and design optimization of cyclonic autonomous inflow control devices | |
Darche et al. | Integrated asset modeling of a deep-offshore subsea development using 2 complementary reservoir-surface coupling workflows | |
Yang et al. | Reservoir development modeling using full physics and proxy simulations | |
von Hohendorff Filho et al. | Evaluation on explicit coupling between reservoir simulators and production system | |
Nazarov et al. | Integrated Asset Modeling in Mature Offshore Fields: Challenges and Successes | |
Sagen et al. | A coupled dynamic reservoir and pipeline model–development and initial experience | |
Taghavi et al. | The Impact of Autonomous Inflow Control Valve on Improved Oil Recovery in a Thin-Oil-Rim Reservoir | |
Varavva et al. | Creating the Integrated Model for Conceptual Engineering of Reservoir Management and Field Facilities Construction–Experience of Tazovskoe Oil and Gas-Condensate Field. | |
Narahara et al. | Optimization of Riser Design and Drill Centers with a Coupled Reservoir and Facility Network Model for Deepwater Agbami | |
Wang | Integrated production modeling to assess the effect of subsea water separation | |
Prakasa et al. | A Rapid, Simple, Portable Tool to Design and Analyse the Value of Inflow Control Devices ICD and Autonomous Inflow Control Devices AICD | |
Stone et al. | A unified thermal wellbore model for flexible simulation of multiple tubing strings | |
Hatvik et al. | Optimized field development through integrating field network with dynamic reservoir model | |
Hersandi | Modeling of water behavior in hydraulically-fractured shale gas wells |