Che et al., 2022 - Google Patents
Cable Laying Technology in Trenchless ChannelChe et al., 2022
- Document ID
- 5638615601619820365
- Author
- Che C
- Yan B
- Qin T
- Li G
- Huang Y
- Shang J
- Publication year
- Publication venue
- 2022 Power System and Green Energy Conference (PSGEC)
External Links
Snippet
With the rapid economic development, urban construction has become saturated and the usable space is becoming increasingly narrow. The construction of overhead transmission lines occupies a lot of land resources, and it is difficult to meet the needs of urban …
- 238000005516 engineering process 0 title abstract description 27
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/20—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B4/00—Drives used in the borehole
- E21B4/04—Electric drives
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/02—Placing by driving
- E02D7/06—Power-driven drivers
- E02D7/14—Components for drivers inasmuch as not specially for a specific driver construction
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/26—Placing by using several means simultaneously
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/12—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using drilling pipes with plural fluid passages, e.g. closed circulation systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick
- E21B19/08—Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D1/00—Investigation of foundation soil in situ
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Hong | Typical underwater tunnels in the mainland of China and related tunneling technologies | |
CN100410485C (en) | Construction method for push pipe by cooperation of horizontal auger driller and horizontal directional driller | |
CN102522723B (en) | Power cable crossing method without excavating ground surface | |
CN102767194B (en) | Construction method for treating operating metro tunnel settlement by using anchor cable method | |
WO2022001310A1 (en) | Method for passing through river channel and laying cable by using horizontal directional drilling technology | |
CN111287653A (en) | Large-caliber forward reaming construction method for horizontal directional drilling of hard rock | |
CN108678130A (en) | A kind of non-digging drag pipe construction method | |
CN110359540A (en) | A kind of shallow earthing Large Diameter Pipeline high water level wears the artificial jacking construction engineering method of existing road | |
CN107191675A (en) | Rail yard electrified sectionses pipeline laying construction engineering method | |
Wang et al. | Shield tunnel engineering: from theory to practice | |
Ma et al. | The influence of shallow buried double-line parallel rectangular pipe jacking construction on ground settlement deformation | |
CN114320313B (en) | Air-pushing traction type push bench escaping construction method | |
CN208310757U (en) | A kind of rich water weak soil, the artificial bore detecting device of thin silt ultra-deep pipeline | |
CN214403592U (en) | Large-diameter concealed pipe system and pipe pulling construction system thereof | |
Che et al. | Cable Laying Technology in Trenchless Channel | |
Wang | Tunnelling and technological progress in tunnelling in China | |
CN101141054A (en) | Compaction grouting method for preventing land subsidence after non-digging horizontal drilling | |
Zhang et al. | Construction applicability of mechanical methods for connecting aisle in the bohai mudstone stratum with high water pressure | |
Nguyen et al. | Research on launching technology of shield tunnel in Ho Chi Minh Metro line 1 | |
Sinna | Application of trenchless construction technology in construction of water supply and drainage in urban road construction | |
Munz et al. | Marine Outfalls Project-Issues and Challenges | |
Wang et al. | Research on Pipe Jacking Construction Technology Based on Upcrossing Metro and Cable Tunnel | |
JPH10317883A (en) | Method of ultrasmall bore drilling construction | |
Su et al. | Analysis of Construction Technology and Soil Settlement Law for In-Situ Break-and-Replace of Pipelines | |
CN114992385A (en) | Construction method for connecting large-diameter long-distance steel water delivery pipeline by multiple joints and dragging |